ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 22 of 26 NUREG-1021, Revision 8, Supplement 1 Facility: _ANO UNIT 2__________________ Date of Examination: 2/11/2002 Exam Level (circle one): RO / SRO(I) / SRO(U)

Operating Test No.: _1__

B.1 Control Room Systems System / JPM Title Type Code*

Safety Function

a. ANO-2-JPM-NRC-CNTCL 022 A4.03 RO - 3.2/SRO - 3.2 (Containment Cooling System)

Ability to manually operate and/or monitor dampers in the CCS in the Control Room.

D/S/A/L 5

Containment Integrity

b. ANO-2-JPM-NRC-EFW04 061 A2.07 RO - 3.4/SRO - 3.5 (Auxiliary Feedwater System)

Feed steam generators with Emergency feed water pump and reset EFAS.

M/S/L 4

Heat Removal B.2 Facility Walk-Through

a. ANO-2-JPM-NRC-AACFO 064 A4.01 RO-4.0/SRO-4.3 Ability to manually operate local or remote operation of EDG.

D/A 6

Electrical

b. ANO-2-JPM-NRC-P36ASD 004 A4.08 RO-3.8/SRO-3.8 Ability to manually operate Charging (AOP)

N/R 2

Inventory

c. ANO-2-JPM-NRC-TCBT 012 A4.06 RO-4.3/SRO-4.3 Ability to manually operate Reactor Trip Breakers D

7 Instrumentation

  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA

ANO-2-JPM-NRC-AACFO PAGE 1 of 6 JOB PERFORMANCE MEASURE UNIT:

2 REV #:

000 DATE:

SYSTEM/DUTY AREA:

Emergency Diesel Generator System TASK:

Control AAC Diesel Engine Fuel Oil Day Tank Level Manually (Alternate Success Path)

JTA#:

ANO2AOAACDGOFFNORM24 KA VALUE RO:

4.0 SRO:

4.3 KA

REFERENCE:

064 A4.01 APPROVED FOR ADMINISTRATION TO:

RO:

X SRO:

X TASK LOCATION:

INSIDE CR:

OUTSIDE CR:

X BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

Simulate SIMULATOR:

LAB:

POSITION EVALUATED:

RO:

SRO:

ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

LAB:

TESTING METHOD:

SIMULATE:

PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES:

13 Minutes REFERENCE(S):

AOP 2203.012Z, Rev. 01-06-0 EXAMINEE'S NAME:

SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED:

DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-AACFO PAGE 2 of 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

The AAC Diesel is loaded to 4400 KW when the FUEL DAY TANK LEVEL LOW alarm annunciates in the Control Room.

TASK STANDARD:

AAC diesel generator fuel oil day tank (2T-11) level has been raised to > 20%.

(ALTERNATE SUCCESS PATH)

TASK PERFORMANCE AIDS:

OP 2203.012Z (2K432-E2)

SIMULATOR SETUP:

NONE EXAMINER'S NOTES:

ANO-2-JPM-NRC-AACFO PAGE 3 of 6 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, "Correct the cause of the FUEL DAY TANK LEVEL LOW alarm using 2203.012Z (2K432-E2)."

CRITICAL ELEMENTS (C): 3 PERFORMANCE CHECKLIST STANDARDS (Circle One) 1.

Check local level for the AAC diesel generator day tank (2T-11).

POSITIVE CUE:

The local tank level indicator (2LI-7201B) shows 15%.

OR On panel 2C442, 2LI-7201A shows 15%.

OR On the PLC for L7201, observed the fuel oil day tank level shows 15%.

In Engine Room, observed Fuel Oil Day Tank Level on 2LI-7201B shows < 20%.

OR On Panel 2C442, observed Fuel Oil Day Tank Level (2LI-7201A) indicates < 20%.

OR On Local Computer for L7201, observed Fuel Oil Day Tank Level shows < 20%.

N/A SAT UNSAT EXAMINERS NOTE:

All attempts to start the fuel oil transfer pump should fail. After each start attempt, provide the following cue:

NEGATIVE CUE:

The fuel oil transfer pump does NOT start.

2.

Control Fuel Oil Transfer Pump (2P-235) manually.

NEGATIVE CUES:

2HS-7106A on 2C-440 is taken to MANUAL and Green light is ON and Red light is OFF.

2HS-7106B on 2B116 is taken to MANUAL and Green light is ON and Red light is OFF.

If asked about tank level response, inform candidate that level is 15 % and slowly dropping.

On Panel 2C-440, rotated 2HS-7106A to MANUAL.

OR On 2B161, rotated 2HS-7106B to MANUAL.

N/A SAT UNSAT TRANSITION NOTE:

Go to the AAC diesel generator engine room.

ANO-2-JPM-NRC-AACFO PAGE 4 of 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 3.

Open Fuel Oil Header 2T-11 Bypass (2AAC-17).

POSITIVE CUE:

2AAC-17 back seat is felt and the valve-operating handle will NOT turn further.

Located 2AAC-17 under day tank 2T-11.

Turned 2AAC-17 operating handle CCW to full open position.

OR Throttled 2AAC-17 to increase day tank level.

N/A SAT UNSAT 4.

Check Fuel Oil Day Tank (2T-11) level.

POSITIVE CUE:

2T-11 level is observed to be increasing on 2LI-7201B.

OR 2T-11 level is observed to be increasing on 2LI-7201A.

On 2LI-7201B at 2T-11, observed Fuel Oil Day Tank Level increasing.

OR On 2LI-7201A at 2C-442, observed 2T-11 level increasing.

N/A SAT UNSAT EXAMINERS NOTE:

Final tank level is established at the discretion of the examinee providing level is > 20%.

5.

Throttle or close Fuel Oil Header 2T-11 Bypass (2AAC-17) to maintain Day tank Level >20%

POSITIVE CUE:

The 2AAC-17 shut seat is felt and valve-operating handle will NOT turn further.

WHEN 2T-11 level is > 20%,

rotated 2AAC-17 CW to close.

OR When 2T-11 level is >20%

throttled 2AAC-17 level to maintain level.

N/A SAT UNSAT 6.

Depress Reset PLC touch-pad POSITIVE CUE:

PLC touch-pad depressed At local computer touch screen depressed the RESET PLC touch-pad.

N/A SAT UNSAT END

ANO-2-JPM-NRC-AACFO PAGE 5 of 6 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

The AAC Diesel is loaded to 4400 KW when the FUEL DAY TANK LEVEL LOW alarm annunciates in the Control Room.

INITIATING CUE:

The SM/CRS directs, "Correct the cause of the FUEL DAY TANK LEVEL LOW alarm using 2203.012Z (2K432-E2)."

ANO-2-JPM-NRC-AACFO PAGE 6 of 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

The AAC Diesel is loaded to 4400 KW when the FUEL DAY TANK LEVEL LOW alarm annunciates in the Control Room.

INITIATING CUE:

The SM/CRS directs, "Correct the cause of the FUEL DAY TANK LEVEL LOW alarm using 2203.012Z (2K432-E2)."

ANO-2-JPM-NRC-CNTCL PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT:

2 REV #:

001 DATE:

SYSTEM/DUTY AREA:

Containment Cooling System TASK:

Verify Containment Coolers In Emergency Mode JTA#:

ANO2SROEOPAOPEMER12/ANO2ROEOPAOPEMERG13 KA VALUE RO:

3.2 SRO:

3.2 KA

REFERENCE:

022 A4.03 APPROVED FOR ADMINISTRATION TO:

RO:

X SRO:

X TASK LOCATION:

INSIDE CR:

X OUTSIDE CR:

BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

SIMULATOR:

Perform LAB:

POSITION EVALUATED:

RO:

SRO:

ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

LAB:

TESTING METHOD:

SIMULATE:

PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES:

8 Minutes REFERENCE(S):

2203.003 Rev 005-01-0 EXAMINEE'S NAME:

SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED:

DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-CNTCL PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

Reactor has tripped due to a LOCA. CCAS has failed to actuate automatically.

TASK STANDARD:

Containment Coolers have been placed in Emergency Mode.

This is an alternate success path JPM.

TASK PERFORMANCE AIDS:

2203.003 Rev 005-01-0, Loss of Coolant Accident, Section 1.0, Step 11.

SIMULATOR SETUP:

400 gpm LOCA, CCAS fails to actuate, 2UCD-8216-2 failed closed (ESFDAMP8216).

NOTE: When candidate places handswitch for 2UCD-8216-2 to open, then delete 2UCD-8216-2 Malfunction.

EXAMINER'S NOTES:

ANO-2-JPM-NRC-CNTCL PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, Manually actuate CCAS per of EOP 2202.003 Section 1 Step 6, then verify CNTMT coolers in Emergency Mode per EOP 2202.003 Section 1 Step 11.

CRITICAL ELEMENTS (C): 1, 3, 5 PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 1.

Manually actuate CCAS.

Depressed CCAS push buttons on 2C03 or 2C14.

Observed CCAS actuated on PPS inserts on 2C03. Trip paths 1&2 if actuated from 2C03 OR trip paths 3&4 if actuated from 2C14.

N/A SAT UNSAT 2.

Verify CNTMT Cooling fans running.

2VSF-1A 2VSF-1B 2VSF-1C 2VSF-1D POSITIVE CUE:

Red lights ON.

NEGATIVE CUE:

Green lights ON.

On panels 2C16 and 2C17, observed red light On and green light OFF for all four CNTMT cooling fans.

N/A SAT UNSAT (C) 3.

Verify ALL CNTMT Cooling Bypass dampers open.

2UCD-8209-1 2UCD-8203-1 2UCD-8222-2 2UCD-8216-2 POSITIVE CUE:

Red lights ON.

NEGATIVE CUE:

Green lights ON.

On panels 2C16 and 2C17, observed red lights ON for all dampers except 2UCD-8216-2.

N/A SAT UNSAT 4.

Report to CRS that damper 2UCD-8216-2 failed to open.

Reported to CRS the failure of 2UCD-8216-2 to open.

N/A SAT UNSAT

ANO-2-JPM-NRC-CNTCL PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 5.

Open damper 2UCD-8216-2 Placed handswitch on panel 2C16 for 2UCD-8216-2 to OPEN.

Observed red light ON and green light OFF above handswitch for 2UCD-8216-2.

N/A SAT UNSAT 6.

Verify BOTH SW Cooling Outlet valves open.

2CV-1519-1 2CV-1513-2 POSITIVE CUE:

Red lights ON.

NEGATIVE CUE:

Green lights ON.

Observed red light ON and green light OFF for 2CV-1519-1 and 2CV-1513-2 on panels 2C16 and 2C17.

N/A SAT UNSAT 8.

Verify BOTH SW Cooling Inlet valves open.

2CV-1511-1 2CV-1510-2 POSITIVE CUE:

Red lights ON.

NEGATIVE CUE:

Green lights ON.

Observed red light ON and green light OFF for 2CV-1511-1 and 2CV-1510-2 on panels 2C16 and 2C17.

N/A SAT UNSAT END

ANO-2-JPM-NRC-CNTCL PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

Reactor has tripped due to a LOCA. CCAS has failed to actuate automatically.

INITIATING CUE:

The SM/CRS directs, Manually actuate CCAS per 2202.003 Section 1 Step 6, then verify CNTMT coolers in Emergency Mode per 2202.003 Section 1 Step 11.

ANO-2-JPM-NRC-CNTCL PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

Reactor has tripped due to a LOCA. CCAS has failed to actuate automatically.

INITIATING CUE:

The SM/CRS directs, Manually actuate CCAS per 2202.003 Section 1 Step 6, then verify CNTMT coolers in Emergency Mode per 2202.003 Section 1 Step 11.

ANO-2-JPM-NRC-EFW04 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT:

2 REV #:

000 DATE:

SYSTEM/DUTY AREA:

Emergency Feedwater System TASK:

Shutdown an EFW Train With an EFAS Present (2P7B Secured)

JTA#:

ANO2ROEFWNORM19 KA VALUE RO:

3.4 SRO:

3.5 KA

REFERENCE:

061 A2.07 APPROVED FOR ADMINISTRATION TO:

RO:

X SRO:

X TASK LOCATION:

INSIDE CR:

X OUTSIDE CR:

BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

SIMULATOR:

Perform LAB:

POSITION EVALUATED:

RO:

SRO:

ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

LAB:

TESTING METHOD:

SIMULATE:

PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES:

15 Minutes REFERENCE(S):

2106.006 rev. 053-02-0 EXAMINEE'S NAME:

SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED:

DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-EFW04 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

Mode 3, post reactor trip, EFAS #1 and #2 have actuated. Chemistry has been notified to sample Main Steam to accommodate dose calculations.

TASK STANDARD:

EFW flow has been established to both S/Gs using 2P7A and 2P7B has been secured.

TASK PERFORMANCE AIDS:

2202.006 Section 14.0.

SIMULATOR SETUP:

Mode 3, EFAS1 and EFAS2 actuated, S/G levels are ~40%, MFW pumps have been secured, and Main Feed block valves are closed. Fail 2CV 1025-1 closed using component malfunction.

EXAMINER'S NOTES:

ANO-2-JPM-NRC-EFW04 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The SS/CRS directs, "Secure B Emergency Feedwater Pump (2P7B) due to failure of 2CV 1025-1 to open from the control room and establish EFW flow and restore both steam generator levels to 60% with EFW Pump 2P7A using 2106.006 Section 14.0."

CRITICAL ELEMENTS (C): 1, 2, 6, 7 PERFORMANCE CHECKLIST STANDARDS (Circle One)

C 1.

Check 2P7A available.

POSITIVE CUES:

Red light is ON above 2CV-0340-2.

Pump discharge pressure and speed are normal values.

On Panel 2C17, observed that 2P7A is running.

Checked that RED light above handswitch for 2CV-0340-2 is ON.

AND Checked pump speed and discharge pressure are normal values.

N/A SAT UNSAT C

2.

Override handswitches to OPEN for 2P7A discharge valves.

POSITIVE CUE:

Green lights OFF; red lights ON.

NEGATIVE CUE:

Green lights ON; red lights OFF.

On Panel 2C16, placed handswitches for 2CV-1037-1 and 2CV-1039-1 to OPEN and released.

Observed green light OFF; red light ON over handswitches for 2CV-1037-1 and 2CV-1039-1 AND On Panel 2C16, placed handswitches for 2CV-1026-2 and 2CV-1076-2 to OPEN and released.

Observed green light OFF; red light ON over handswitches for 2CV-1026-2 and 2CV-1076-2 N/A SAT UNSAT 3.

Verify feed flow established to A and B SGs.

Note: flow rate is dependent on SG pressure.

POSITIVE CUE:

Flow is indicated on 2FIS-0718-2 and 2FIS-0713-2.

NEGATIVE CUE:

Flow is NOT indicated on 2FIS-0718-2 and 2FIS-0713-2.

On Panel 2C16, observed that 2FIS-0718-2 and 2FIS-0713-2 indicate flow.

N/A SAT UNSAT

ANO-2-JPM-NRC-EFW04 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

EXAMINER'S NOTE:

Flow rate is discretionary and a function of RCS temperature and SG pressure. The 2P7A speed controller may be used to control pump speed and therefore flow rate to the SGs or the discharge valves may be cycled open or closed to control SG levels.

4.

Control SG levels.

On Panel 2C16, cycled discharge valves 2CV-1026-2 and 2CV-1076-2 to control SG levels.

OR Reduced EFW Pump 2P7A speed using speed controller to control SG levels.

N/A SAT UNSAT 5.

Monitor RCS temperature and pressure during SG refill.

POSITIVE CUE:

CBOR acknowledges request.

Reports RCS temperature stable at 547°F.

AND PZR pressure controlling at 2200 psia.

Requested Control Board Operator to monitor for abnormal decrease in RCS temperature and PZR pressure using installed Tc, Th and Tave meters.

OR Used SPDS or Plant Computer to monitor RCS temperatures and PZR pressure.

N/A SAT UNSAT EXAMINERS NOTE:

The simulator only has Panel 2C40 hardware. The reset will be accomplished in 2C40 only.

(C) 6.

Reset EFAS lockout relays on 2C39 and 2C40.

POSITIVE CUE:

Red lights ON above EFAS-1 and EFAS-2 pushbutton.

When SG levels above 25.0%,

depressed reset pushbuttons for EFAS-1 and EFAS-2 on Panel 2C40.

AND Observed Red lights ON above the EFAS-1 and EFAS-2 pushbuttons.

N/A SAT UNSAT (C) 7.

Secure 2P7B.

POSITIVE CUE:

Green light ON; red light OFF.

NEGATIVE CUE:

Green light OFF; red light ON.

On Panel 2C17, turned handswitch for 2P7B to Normal-After-Stop.

OR Placed handswitch for 2P7B in Pull-To-Lock.

Observed green light ON, red light OFF above handswitch for 2P7B.

N/A SAT UNSAT

ANO-2-JPM-NRC-EFW04 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 8.

Verify 2CV-1036-2 and 2CV-1038-2 OPEN.

POSITIVE CUE:

Red light is ON and Green light is OFF above handswitches for 2CV-1036-2 and 2CV-1038-2.

On Panel 2C17, placed handswitches for 2CV-1036-2 and 2CV-1038-2 to OPEN.

On Panel 2C17, observed that Red light is ON and Green light is OFF above handswitches for 2CV-1036-2 and 2CV-1038-2.

N/A SAT UNSAT NOTE:

When asked by examinee, report as CRS that 2CV 1025-1 had previously been cycled open and closed with 2CV 1038-2 open by the WCO and there is no need to cycle it again.

9.

Verify 2CV-1075-1 OPEN.

POSITIVE CUE:

Red light is ON and Green light is OFF above handswitch for 2CV-1075-1.

On Panel 2C17, placed handswitch for 2CV-1075-1 to OPEN On Panel 2C17, observed that Red light is ON and Green light is OFF above handswitch for 2CV-1075-1.

N/A SAT UNSAT 10.

Close 2CV-1075-1.

POSITIVE CUE:

Green light is ON and Red light is OFF above handswitch for 2CV-1075-1.

On Panel 2C17, placed handswitch for 2CV-1075-1 to CLOSE.

On Panel 2C17, observed that Green light is ON and Red light is OFF above handswitch for 2CV-1075-1.

N/A SAT UNSAT END

ANO-2-JPM-NRC-EFW04 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

Mode 3, post reactor trip, EFAS #1 and #2 have actuated. Chemistry has been notified to sample Main Steam to accommodate dose calculations.

INITIATING CUE:

The SS/CRS directs, "Secure B Emergency Feedwater Pump (2P7B) due to failure of 2CV-1025-1 to open from the control room and establish EFW flow and restore both steam generators level to 60% with EFW Pump 2P7A using 2106.006 Section 14.0."

ANO-2-JPM-NRC-EFW04 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

Mode 3, post reactor trip, EFAS #1 and #2 have actuated. Chemistry has been notified to sample Main Steam to accommodate dose calculations.

INITIATING CUE:

The SS/CRS directs, "Secure B Emergency Feedwater Pump (2P7B) due to failure of 2CV-1025-1 to open from the control room and establish EFW flow and restore both steam generators level to 60% with EFW Pump 2P7A using 2106.006 Section 14.0."

ANO-2-JPM-NRC-P36ASD PAGE 1 of 8 JOB PERFORMANCE MEASURE UNIT:

2 REV #:

000 DATE:

SYSTEM/DUTY AREA:

Chemical and Volume Control System TASK:

Operate Charging Pump 2P36B Locally During Alternate Shutdown JTA#:

ANO2ROCVCSOFFNORM46 KA VALUE RO:

3.8 SRO:

3.4 KA

REFERENCE:

004 A4.08 APPROVED FOR ADMINISTRATION TO:

RO:

X SRO:

X TASK LOCATION:

INSIDE CR:

OUTSIDE CR:

X BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

Simulate SIMULATOR:

LAB:

POSITION EVALUATED:

RO:

SRO:

ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

LAB:

TESTING METHOD:

SIMULATE:

PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES:

20 Minutes REFERENCE(S):

AOP 2203.014, Rev. 14-06-0 EXAMINEE'S NAME:

SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED:

DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-P36ASD PAGE 2 of 8 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

The control room has been evacuated as required by 2203.014, Alternate Shutdown. Simulate obtaining keys, handheld radio and flashlight from the alternate shutdown locker. Enter controlled access, if necessary, using normal ingress and egress methods and follow all normal procedural controls for radiological, security and other concerns during the performance of this JPM.

TASK STANDARD:

Charging pump (2P36B) has been started from breaker 2B62-A5.

TASK PERFORMANCE AIDS:

2203.014, Alternate Shutdown Section 6, RO 2 Follow-up Actions. Mark through steps 1, 2, 3 and 4 to indicate completion.

SIMULATOR SETUP:

None.

EXAMINER'S NOTES:

Sign in under RWP 2002-05 Task 1 - NRC RWP.

ANO-2-JPM-NRC-P36ASD PAGE 3 of 8 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, Perform applicable steps of Alternate Shutdown AOP for RO2, Section 6. Steps 1 through 4 have been completed.

CRITICAL ELEMENTS (C): 4, 6, 8, 9, 10 PERFORMANCE CHECKLIST STANDARDS (Circle One)

NOTE: Examinee will enter RCA by normal means. The following actions are performed on the 354 elevation of the auxiliary building.

1.

Open breakers 2B62-E4, power to 2CV-4840-2 and 2B62-F2, power to 2CV-4950-2.

POSITIVE CUE Breaker 2B62-E4 is open. Both red and green lights OFF.

Breaker 2B62-F2 is open. Both red and green lights OFF.

At MCC 62, open breakers 2B62-E4, power to 2CV-4840-2 and 2B62-F2, power to 2CV 4950-2.

Observed both red and green lights OFF for 2B62-E4, and 2B62-F2.

N/A SAT UNSAT 2.

Inform RO 1 on radio that power has been removed from 2CV-4950-2.

Give the following response when contacted as RO 1:

Understand RWT Suction To Charging Pumps Valve 2CV-4950-2 is de-energized (RO1 step 6).

Contacted RO 1 by radio and inform that RWT Suction To Charging Pumps valve 2CV-4950-2 is de-energized (RO1 step 6).

N/A SAT UNSAT NOTE:

The following actions are performed on the 354 elevation of the auxiliary building in the Upper South Piping Penetration Room (USPPR). Area around 2CV 4840-2 may be contaminated, so actions to verify valve closed may need to be done from a distance away from the valve.

3.

Verify 2CV-4840-2 is OPEN.

POSITIVE CUE:

2CV 4840-2 is OPEN.

In the USPPR, verified 2CV-4840-2 is OPEN by one of the following methods:

Verify that pointer on valve indicates open.

AND/OR Screw threads on the valve stem are at the upper part of the gland packing area (the shiny part of the stem is exposed).

N/A SAT UNSAT

ANO-2-JPM-NRC-P36ASD PAGE 4 of 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

NOTE:

After transitioning out of USPPR, Give the following message: RO 1 reports on the radio that the BAMT Gravity Feed Outlet valves, 2CV-4920-1 and 2CV-4921-1 are de-energized.

The Examinee will then transition to the 386 of the RCA to the Boric Acid Tank Room.

C 4.

Verify 2CV-4920-1 and 2CV-4921-1 are OPEN.

INITIAL CUE:

2CV-4920-1 and 2CV-4921-1 are CLOSED.

Give after valve opening simulated:

POSITVE CUE:

2CV-4920-1 and 2CV-4921-1 are OPEN.

In Boric Acid Tank Room under each Boric Acid Tank, verified 2CV-4920-1 and 2CV-4921-1 are OPEN by one of the following methods on each valve:

Manual engagement lever would be depressed and handwheel taken to the open direction until valve travel stopped.

AND/OR Verify that pointer on valve indicates open.

AND/OR Screw threads on the valve stem are at the upper part of the gland packing area (the shiny part of the stem is exposed).

N/A SAT UNSAT 5.

Inform CRS on radio that BAM Tank Gravity Feed Outlet Valves are OPEN (CRS step 19).

Give the following response when contacted as CRS:

Understand BAM Tank Gravity Feed Outlet Valves are OPEN (CRS step 19).

Contact CRS on radio and inform that BAM Tank Gravity Feed Outlet Valves are OPEN (CRS step 19).

N/A SAT UNSAT NOTE:

Inform the examinee that steps 10 and 11 of section 6 will NOT be performed as part of this JPM.

Provide the following message: CRS reports that the VCT outlet valve 2CV-4873-1 has been de-energized.

NOTE:

This valve, 2CV 4873-1 is located on 354 level of the RCA inside the VCT room and is in a locked high radiation area. DO NOT ALLOW ENTRY. Discuss how valve would be verified closed, if entry were made, when outside the room.

ANO-2-JPM-NRC-P36ASD PAGE 5 of 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

C 6.

Verify VCT Outlet Valve 2CV-4873-1 is closed.

POSITIVE CUE:

2CV 4873-1 is CLOSED.

On 354 level inside VCT room, verified 2CV-4873-1 CLOSED by one of the following methods:

DISCUSS ONLY Manual engagement lever would be depressed and handwheel taken to the open direction until valve travel stopped.

AND/OR Verify that pointer on valve indicates open.

AND/OR Screw threads on the valve stem are at the upper part of the gland packing area (the shiny part of the stem is exposed).

N/A SAT UNSAT 7.

Verify VCT Makeup Isolation Valve 2CV-4941-2 maintained CLOSED.

POSITIVE CUES:

2CV-4941-2 is CLOSED.

Instrument Air Supply valve is CLOSED.

Air Pressure is VENTED.

On 354 level outside VCT Room, verified 2CV-4941-2 is maintained CLOSED by:

Closing Instrument Air Supply valve.

AND Venting air pressure off supply regulator.

N/A SAT UNSAT NOTE:

Inform the examinee that Steps 14 and 15 of Section 6 will NOT be performed as part of this JPM.

MCC 62 is located on 354 elevation of the RCA.

Provide the following message when at MCC 62: 2P36B is not running, green light is lit on 2B62-A5.

8.

Inform TSC that 2P36B is not running.

When TSC is contacted provide the following:

Understand Charging Pump 2P36B is not running. Start Charging Pump 2P36B.

At breaker 2B62-A5, observed Green light and informed the TSC Charging Pump 2P36B is NOT running.

N/A SAT UNSAT

ANO-2-JPM-NRC-P36ASD PAGE 6 of 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

NOTE:

If examinee requests Attachment E, Safe Shutdown Systems Checklist step 4.D, provide the following message:

Step 4.D states PZR level maintained 29 to 80%.

C 9.

Place local/remote handswitch (2HS-4843-2) for 2P36B to LOCAL.

POSITIVE CUE:

Local/remote handswitch in LOCAL.

At breaker 2B62-A5, rotated local/remote handswitch (2HS-4843-2) to LOCAL.

N/A SAT UNSAT C

10.

Start Charging Pump (2P36B).

POSITIVE CUE:

Red light ON; green light OFF.

NEGATIVE CUE:

Green light ON; red light OFF.

At breaker 2B62-A5, rotated start/stop handswitch (2HS-4844-2) to START.

Observed red light ON, green light OFF.

N/A SAT UNSAT END

ANO-2-JPM-NRC-P36ASD PAGE 7 of 8 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

The control room has been evacuated as required by 2203.014, Alternate Shutdown. Simulate obtaining keys, handheld radio and flashlight from the alternate shutdown locker. Enter controlled access, if necessary, using normal ingress and egress methods and follow all normal procedural controls for radiological, security and other concerns during the performance of this JPM.

INITIATING CUE:

The SM/CRS directs, Perform applicable steps of Alternate Shutdown AOP for RO2, Section 6.

Steps 1 through 4 have been completed.

ANO-2-JPM-NRC-P36ASD PAGE 8 of 8 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

The control room has been evacuated as required by 2203.014, Alternate Shutdown. Simulate obtaining keys, handheld radio and flashlight from the alternate shutdown locker. Enter controlled access, if necessary, using normal ingress and egress methods and follow all normal procedural controls for radiological, security and other concerns during the performance of this JPM.

INITIATING CUE:

The SM/CRS directs, Perform applicable steps of Alternate Shutdown AOP for RO2, Section 6.

Steps 1 through 4 have been completed.

ANO-2-JPM-NRC-TCBT PAGE 1 of 9 JOB PERFORMANCE MEASURE UNIT:

2 REV #:

000 DATE:

SYSTEM/DUTY AREA:

CEDM Control System TASK:

Test TCB2 JTA#:

ANO2ROCEDMSURV15 KA VALUE RO:

4.3 SRO:

4.3 KA

REFERENCE:

012 A4.06 APPROVED FOR ADMINISTRATION TO:

RO:

X SRO:

X TASK LOCATION:

INSIDE CR:

OUTSIDE CR:

BOTH:

X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

Simulate SIMULATOR:

LAB:

POSITION EVALUATED:

RO:

SRO:

ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

LAB:

TESTING METHOD:

SIMULATE:

PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES:

20 Minutes REFERENCE(S):

2105.009, Rev. 020-07-0 and 2102.002 Rev 050-02-0 EXAMINEE'S NAME:

SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED:

DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-TCBT PAGE 2 of 9 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

The plant is in Mode 5 and preparations are being made for heatup. The Reactor Trip Circuit Breakers (TCBs) are open. TCB 9 is closed. All reactor trip signals are clear. Both MG sets are running. The requirements of TCB/CEDMCS Status Log (OPS-B26) are satisfied.

TASK STANDARD:

TCB 2 tested. (Complete 2105.009 Supplement 1 steps 2.1 & 2.2 for TCB 2)

TASK PERFORMANCE AIDS:

OP2105.009 Supplement 1 and 2102.002 Exhibit 1 SIMULATOR SETUP:

None.

EXAMINER'S NOTES:

ANO-2-JPM-NRC-TCBT PAGE 3 of 9 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, Test TCB 2 using 2105.009 Supplement 1.

CRITICAL ELEMENTS (C): 1, 2, 5, 11 START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

TRANSITION NOTE Proceed to Reactor Trip Circuit Breaker Panel area on 404 elevation of the RAB.

(C) 1.

Verify Undervoltage Trip Device Armature in contact with Air Gap Adjustment Screw for TCB 2.

POSITIVE CUE:

Undervoltage Trip Device Armature is in contact with Air Gap Adjustment Screw for TCB 2.

Opens breaker door.

Using 2102.002 Exhibit 1, observed Undervoltage Trip Device Armature in contact with Air Gap Adjustment Screw for TCB 2.

N/A SAT UNSAT EXAMINER NOTE: Several steps must be performed in the control room. Provide the following information to the candidate: I will act as the operator stationed in the control room at 2C23 and will perform actions in the control room that you request.

The following two steps are performed in the control room.

(C) 2.

Unlock PPS trip path reset keylock and close TCB 2 using pushbutton on 2C23.

POSITIVE CUE:

Operator in control room acknowledges direction and reports that TCB 2 is closed.

Using proper communications techniques, directs Operator in Control Room to close TCB 2 from the control room.

(the following are details of required actions, if necessary:

Obtains trip path reset key from Shift Manager.

Inserts key into trip path reset keylock.

Unlocks trip path.

Closes TCB 2 using pushbutton on 2C23.

Observes TCB 2 indication on mimic panel above 2C-23 red light on and green light off.)

N/A SAT UNSAT

ANO-2-JPM-NRC-TCBT PAGE 4 of 9 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 3.

Lock PPS trip path reset and remove key.

POSITIVE CUE:

Operator in control room acknowledges direction and reports that the Trip path reset is locked and key is removed.

Using proper communications techniques, directs Operator in Control Room to Lock the trip path and Remove key.

N/A SAT UNSAT Examiners note: The following steps are performed from the Reactor Trip Circuit Breaker Panel area on 404 elevation of the RAB.

4.

Verify TCB 2 closed per step 2.1.

POSITIVE CUE:

TCB 2 red light ON and green light OFF and / or Mechanical breaker position closed.

Observes TCB 2 local breaker position red light on and green light off AND/OR Mechanical breaker position closed.

N/A SAT UNSAT (C) 5.

Hold 2HS/TEST in UV Bypass position.

POSITIVE CUE:

2HS/TEST in UV Bypass position.

Holds switch 2HS/TEST to the UV Bypass position.

N/A SAT UNSAT Examiners note: The following step is performed from the Control room. The candidate should direct control room operators to perform this action.

6.

Momentarily depress Reactor Trip pushbutton (2HS-9071-2) on 2C03.

POSITIVE CUE:

Operator in the Control Room acknowledges direction and reports that Reactor trip pushbutton has been pushed.

Using proper communications techniques, directs Operator in the Control Room to open TCB 2 by momentarily depressing Reactor Trip pushbutton (2HS-9071-2) on 2C03.

N/A SAT UNSAT Examiners note: The following step is performed from the Reactor Trip Circuit Breaker Panel area on 404 elevation of the RAB.

ANO-2-JPM-NRC-TCBT PAGE 5 of 9 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 7.

Verify TCB opens.

POSITIVE CUE:

TCB 2 local breaker position red light OFF and green light ON and/or mechanical breaker position shows OPEN Observes TCB 2 local breaker position red light OFF and green light ON and/or mechanical breaker position open.

N/A SAT UNSAT Examiners note: The following step is performed from the Control room. The candidate should direct control room operators to perform this action.

8.

Check 2K12-A10 alarm comes in or re-flashes.

POSITIVE CUE:

Operator in the control room acknowledges direction and reports the alarm window 2K12-A10 indicates reflashed.

Using proper communications techniques, directs Operator in Control Room to check 2K12-A10 alarm comes in or re-flashes.

N/A SAT UNSAT Examiners note: The following step is performed from the Reactor Trip Circuit Breaker Panel area on 404 elevation of the RAB.

9.

Release 2HS/TEST switch.

POSITIVE CUE:

2HS/TEST in AUTO position.

Releases switch 2HS/TEST to the auto position.

N/A SAT UNSAT Examiners NOTE: The following step is performed in the control room. The candidate should direct control room operators to perform this action.

10.

Verify TCB 2 closed per step 2.1.

POSITIVE CUE Operator in the control room acknowledges direction and reports TCB 2 is closed.

POSITIVE CUE:

TCB 2 red light ON and green light OFF and / or Mechanical breaker position closed.

Using proper communications techniques, directs Operator in the Control Room to CLOSE TCB 2.

Observes TCB 2 local breaker position red light on and green light off AND/OR Mechanical breaker position closed.

N/A SAT UNSAT Examiners note: The following step is performed from the Reactor Trip Circuit Breaker Panel area on 404 elevation of the RAB.

ANO-2-JPM-NRC-TCBT PAGE 6 of 9 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 11.

Hold 2HS/TEST in Shunt Bypass position.

POSITIVE CUE:

2HS/TEST in Shunt Bypass position.

Holds switch 2HS/TEST to the Shunt Bypass position.

N/A SAT UNSAT Examiners NOTE: The following step is performed in the control room. The candidate should direct control room operators to perform this action.

12.

Momentarily depress Reactor Trip pushbutton (2HS-9071-2) on 2C03.

POSITIVE CUE:

Operator in the Control Room acknowledges direction and reports that Reactor trip pushbutton has been pushed.

Using proper communications techniques, directs Operator in Control Room to open TCB 2 by momentarily depressing Reactor Trip pushbutton (2HS-9071-2) on 2C03.

N/A SAT UNSAT Examiners note: The following step is performed from the Reactor Trip Circuit Breaker Panel area on 404 elevation of the RAB.

13.

Verify TCB opens.

POSITIVE CUE:

TCB 2 local breaker position red light OFF and green light ON and/or mechanical breaker position shows OPEN Observes TCB 2 local breaker position red light OFF and green light ON and/or mechanical breaker position open.

N/A SAT UNSAT Examiners NOTE: The following step is performed in the control room. The candidate should direct control room operators to perform this action.

14.

Check 2K12-A10 alarm comes in or re-flashes.

POSITIVE CUE:

Operator in the control room acknowledges direction and reports the alarm window 2K12-A10 indicates Reflashed.

Using proper communications techniques, directs Operator in Control Room to check 2K12-A10 alarm comes in or re-flashes.

N/A SAT UNSAT Examiners note: The following step is performed from the Reactor Trip Circuit Breaker Panel area on 404 elevation of the RAB.

ANO-2-JPM-NRC-TCBT PAGE 7 of 9 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 15.

Release 2HS/TEST switch.

POSITIVE CUE:

2HS/TEST in AUTO position.

Releases switch 2HS/TEST to AUTO position.

N/A SAT UNSAT END STOP TIME:

ANO-2-JPM-NRC-TCBT PAGE 8 of 9 JOB PERFORMANCE MEASURE Examiners Copy JPM INITIAL TASK CONDITIONS:

The plant is in Mode 5 and preparations are being made for heatup.

The Reactor Trip Circuit Breakers (TCBs) are open.

TCB 9 is closed.

All reactor trip signals are clear.

Both MG sets are running.

The requirements of TCB/CEDMCS Status Log (OPS-B26) are satisfied.

INITIATING CUE:

The SM/CRS directs, Test TCB 2 using 2105.009 Supplement 1.

ANO-2-JPM-NRC-TCBT PAGE 9 of 9 JOB PERFORMANCE MEASURE Examinees Copy JPM INITIAL TASK CONDITIONS:

The plant is in Mode 5 and preparations are being made for heatup.

The Reactor Trip Circuit Breakers (TCBs) are open.

TCB 9 is closed.

All reactor trip signals are clear.

Both MG sets are running.

The requirements of TCB/CEDMCS Status Log (OPS-B26) are satisfied.

INITIATING CUE:

The SM/CRS directs, Test TCB 2 using 2105.009 Supplement 1.