Revised May, June, July, August, September & October 2001 Monthly Operating Reports for Perry Nuclear Power Plant
ML020910595
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/18/2002
From: Dunn G
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PY-CEI/NRR-2623L
Download: ML020910595 (13)


Text

FENOC FirstEnergy Nuclear Operatng Company Perry Nuclear Power Plant 10 Center Road P.O. Box 97 Perry, Ohio 44081 March 18, 2002 PY-CEI/NRR-2623L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached are revised Monthly Operating Reports for Perry Unit 1 from May to October 2001.

These reports are being resubmitted because of an error in the Net Electrical Energy line on page 1 in the May report. The error was carried through in the Year-to-Date and Cumulative numbers in the following months until the November's report when the error was discovered and corrected.

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Gregory A. Dunn Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector

OPERATING DATA REPORT UNIT:

Perry DATE:

6/9/01 Docket: 50-440 Unit Name:

Perry Nuclear Power Plant Reporting Period:

May 2001 Utility

Contact:

T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

1266*

1241**

Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)

This Month Yr-to-Date Cumulative 264.4 2,316.8 91,925.4 198.8 2,191.5 89,553.7 0.0 0.0 0.0

  • The New Design Electrical Rating is based on the 105% uprate which was completed April of 2001.
    • The new MDC was effective April 1, 2001.

3/13/2002 - Note: The net generation for the month of May has been corrected, which impacts the year to date and cumulative numbers Page 1

1.
2.
3.
4.
5.
6.

7.

8.
9.
10.

11.

UNIT SHUTDOWNS REPORT MONTH - MAY 2001 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 6/8/01 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1

Hours 2

3 01-4 4/28/01 F

113.76 A

4 The unit was manually shutdown and the turbine taken off line. A manual scram was subsequently inserted due to degraded vacuum. The forced outage was due to a stator water leak, which cools the generator.

01-5 5/7/01 F

175.8 A

2 The unit was manually shutdown due to Reactor Recirculation Pump B seal degradation.

01-6 5/21/01 F

255.68 A

2 The unit was manually shutdown due to circulating water pump impeller damage.

SUMMARY

The Perry plant began the month shutdown. Unit was synchronized to the grid at 1746 on the 5th of May. A shutdown was performed on 5/8/01 at 0009 to replace the pump seal on the Reactor recirculation pump B. Repairs were complete and the unit was on line at 0757 on 5/15/01. During the 15th startup the unit only had two circulating water pumps available and was restricted to approximately 70% power. On 5/21/01 at 0819 the unit was taken off line due to the loss of an additional circulating water pump leaving only one available pump. The plant ended the month shutdown.
1. TYPE:

F: Forced S: Scheduled

2. REASON:

A - Equipment Failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

License Examination F - Administrative G - Operational Error (explain)

H - Other (explain)

3. METHOD:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2

OPERATING DATA REPORT UNIT:

Perry DATE:

7/5/01 Docket: 50-440 Unit Name:

Perry Nuclear Power Plant Reporting Period: June 2001 Utility

Contact:

T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

1.
2.
3.
4.
5.
6.

7.

Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)

This Month 704.7 677.6 0.0 802.067.0 Yr-to-Date 3,021.5

'9 RRQ 1 0.0

  • The New Design Electrical Rating is based on the 105% uprate which was completed April of 2001.
    • The new MDC was effective April 1, 2001.

3/13/2002 -

Note: The net generation during the month of May was corrected, which impacts the year to date and cumulative numbers for the month Page 1 1266*

1241**

8.
9.
10.

11.

Cumulative 92.630.1 an 9Sq1 a 0.0 2 AQQ 1

UNIT SHUTDOWNS REPORT MONTH - JUNE 2001 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 7/5/01 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1

Hours 2

3 01-6 5/21/01 F

42.4*

A 4

The unit shutdown due to circulating water pump impeller damage. Plant shutdown to repair all three impellers and motors for the circulating water system pumps.

  • These are the hours off line for the month of June. The total duration of the outage is 298.08 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

SUMMARY

The Perry plant began the month shutdown. The unit was synchronized to the grid at 1824 on the 2nd of June. 100% power was achieved at 0658 on 6/14, when the third circulating water Pump became available for operation. The unit ended the month at full power.
1. TYPE:

F: Forced S: Scheduled

2. REASON:

A - Equipment Failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

License Examination F - Administrative G - Operational Error (explain)

H - Other (explain)

3. METHOD:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2

OPERATING DATA REPORT UNIT:

Perry DATE:

8/7/01 Docket: 50-440 Unit Name:

Perry Nuclear Power Plant Reporting Period: July 2001 Utility

Contact:

T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

1.
2.
3.
4.
5.
6.

7.

Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)

This Month 334.9 285.7 0.0 324.672.0 Yr-to-Date 3,356.4 3,154.8 0.0 3,46,33.0

  • The New Design Electrical Rating is based on the 105% uprate which was completed April of 2001.
    • The new MDC was effective April 1, 2001.

3/13/2002 -

Note: The net generation during the month of May was corrected, which impacts the year to date and cumulative numbers for the month Page 1 1266*

1241**

8.
9.
10.

11.

Cumulative 92,965.0 90,517.0 0.0

UNIT SHUTDOWNS REPORT MONTH - JULY 2001 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 8/7/01 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1

Hours 2

3 01-7 7/11/01 F

458.35 A

3 The plant had an automatic scram on 7/11/01 at 2227. The scram was as a result of a power loss due to a blown fuse.

SUMMARY

The Perry plant began the month on line. On 7/11/01 2227 the plant incurred an automatic shutdown due to a blown fuse. The unit remained off line until 7/31/01 at 0048, when the Unit was sychronized to the grid.
1. TYPE:

F: Forced S: Scheduled

2. REASON:

A - Equipment Failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

License Examination F - Administrative G - Operational Error (explain)

H - Other (explain)

3. METHOD:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2

OPERATING DATA REPORT UNIT:

Perry DATE:

916/01 Docket: 50-440 Unit Name:

Perry Nuclear Power Plant Reporting Period: August 2001 Utility

Contact:

T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

1.
2.
3.
4.
5.
6.

7.

Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)

This Month 744.0 744.0 0.0 91 2.057.0 Yr-to-Date 4,100.4 3,898.8 0.0 Cumulative 93,709.0 91,261.0 0.0 C~

3 9ý44 7:0
  • The New Design Electrical Rating is based on the 105% uprate which was completed April of 2001.
    • The new MDC was effective April 1, 2001.

3/13/2002 - Note: The net generation during the month of May was corrected, which impacts the year to date and cumulative numbers for the month Page 1 1266*

1241**

8.
9.
10.

11.

912.057.0

UNIT SHUTDOWNS REPORT MONTH - AUGUST 2001 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 9/6/01 CONTACT: T. Phelos TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1

Hours 2

3

SUMMARY

The Perry plant began the month on line. The unit remained on line the entire month of August, 2001
1. TYPE:

F: Forced S: Scheduled

2. REASON:

A - Equipment Failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

License Examination F -Administrative G - Operational Error (explain)

H - Other (explain)

3. METHOD:

1 - Manual 2 - Manual Scram 3 -Automatic Scram 4 -Continuation 5 - Other Page 2

OPERATING DATA REPORT UNIT:

Perry DATE:

10/4/01 Docket: 50-440 Unit Name:

Perry Nuclear Power Plant Reporting Period: September 2001 Utility

Contact:

T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

1.
2.
3.
4.
5.
6.

7-Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)

This Month 720.0 720.0 0.0 900.239.0 Yr-to-Date 4,820.4 4,618.8 0.0 Cumulative 94,429.0 91,891.0 0.0 10o4.049.686ý.0

  • The New Design Electrical Rating is based on the 105% uprate which was completed April of 2001.
    • The new MDC was effective April 1, 2001.

3/13/2002 -

Note: The net generation during the month of May was corrected, which impacts the year to date and cumulative numbers for the month Page 1 1266*

1241**

8.
9.
10.

11.

UNIT SHUTDOWNS REPORT MONTH - SEPTEMBER 2001 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 10/6/01 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1

Hours 2

3

SUMMARY

The Perry plant began the month on line. The unit remained on line the entire month of September, 2001
1. TYPE:

F: Forced S: Scheduled

2. REASON:

A - Equipment Failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

License Examination F -Administrative G - Operational Error (explain)

H - Other (explain)

3. METHOD:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2

OPERATING DATA REPORT UNIT:

Perry DATE:

11/6/01 Docket: 50-440 Unit Name:

Perry Nuclear Power Plant Reporting Period: October 2001 Utility

Contact:

T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

1.
2.
3.
4.
5.
6.

7.

Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)

This Month 745.0 745.0 0.0 930.817.0 Yr-to-Date 5,565.4 5,363.8 0.0

  • The New Design Electrical Rating is based on the 105% uprate which was completed April of 2001.
    • The new MDC was effective April 1, 2001.

3/13/2002 -

Note: The net generation during the month of May was corrected, which impacts the year to date and cumulative numbers for the month Page 1 1266*

1241"**

8.
9.
10.

11.

Cumulative 95,174.0 92,726.0 0.0 i

w

UNIT SHUTDOWNS REPORT MONTH - OCTOBER 20001 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 11/6/01 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1

Hours 2

3

SUMMARY

The Perry plant began the month on line. The unit remained on line the entire month of October, 2001
1. TYPE:

F: Forced S: Scheduled

2. REASON:

A - Equipment Failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

License Examination F - Administrative G - Operational Error (explain)

H - Other (explain)

3. METHOD:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2