Summary of Meeting with Calvert Cliffs Nuclear Power Plant, Inc, to Discuss Partial Replacement of Post-Accident Monitoring System Instrumentation
ML020880646
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/03/2002
From: Joel Munday
NRC/NRR/DLPM/LPD1
To:
Skay D
Shared Package
ML020980231 List:
References
CENPD-396-P, App 1, Rev 1
Download: ML020880646 (6)


Text

April 3, 2002 LICENSEE:

Calvert Cliffs Nuclear Power Plant, Inc.

FACILITY:

Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2

SUBJECT:

SUMMARY

OF MARCH 21, 2002, MEETING WITH CALVERT CLIFFS NUCLEAR POWER PLANT, INC. TO DISCUSS PARTIAL REPLACEMENT OF POST-ACCIDENT MONITORING SYSTEM INSTRUMENTATION On March 21, 2002, a public meeting was held between Calvert Cliffs Nuclear Power Plant, Inc.

(CCNPPI) and the Nuclear Regulatory Commission (NRC) staff. The purpose of the meeting was to discuss the licensees proposed implementation of a digital upgrade to the post-accident monitoring system (PAMS) for Calvert Cliffs, Unit Nos. 1 and 2. Enclosure 1 is the list of attendees and Enclosure 2 contains the slides from the meeting.

CCNPPI provided an overview of the upgrade project including the licensing approach.

CCNPPI has evaluated the modification under 10 CFR 50.59 and concluded that, because the components that will be changed are for indication only and have no active function, the change does not require prior NRC review and approval. CCNPPI will be using the Westinghouse Common Qualified Platform as described in Topical Report (TR) CENPD-396-P, Rev. 01, "Common Qualified Platform" Appendix 1 which describes the Post Accident Monitoring System. The topical report is still under review by the staff. Westinghouse anticipates that the staffs review of its topical report will be completed by October 2002. CCNPPI plans to implement the PAMS modification in Unit 2 during the spring 2003 refueling outage and in Unit 1 during the spring 2004 outage.

Enclosures:

As stated cc w/encls: See next page

April 3, 2002 LICENSEE:

Calvert Cliffs Nuclear Power Plant, Inc.

FACILITY:

Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2

SUBJECT:

SUMMARY

OF MARCH 21, 2002, MEETING WITH CALVERT CLIFFS NUCLEAR POWER PLANT, INC. TO DISCUSS PARTIAL REPLACEMENT OF POST-ACCIDENT MONITORING SYSTEM INSTRUMENTATION On March 21, 2002, a public meeting was held between Calvert Cliffs Nuclear Power Plant, Inc.

(CCNPPI) and the Nuclear Regulatory Commission (NRC) staff. The purpose of the meeting was to discuss the licensees proposed implementation of a digital upgrade to the post-accident monitoring system (PAMS) for Calvert Cliffs, Unit Nos. 1 and 2. Enclosure 1 is a list of attendees and Enclosure 2 contains the slides from the meeting.

CCNPPI provided an overview of the upgrade project including the licensing approach.

CCNPPI has evaluated the modification under 10 CFR 50.59 and concluded that, because the components that will be changed are for indication only and have no active function, the change does not require prior NRC review and approval. CCNPPI will be using the Westinghouse Common Qualified Platform as described in Topical Report (TR) CENPD-396-P, Rev. 01, "Common Qualified Platform" Appendix 1 which describes the Post Accident Monitoring System. The topical report is still under review by the staff. Westinghouse anticipates that the staffs review of its topical report will be completed by October 2002. CCNPPI plans to implement the PAMS modification in Unit 2 during the spring 2003 refueling outage and in Unit 1 during the spring 2004 outage.

Enclosures:

As stated cc w/encls: See next page DISTRIBUTION:

PUBLIC OGC PDI-1 R/F ACRS/ACNW DSkay JZwolinski/TMarsh SLittle JMunday EMarinos DMcCain KMortensen TBergman, RGI MChiramal BPlatchek, RGI CGraham Package: ML020980231 : ML020940328 ACCESSION NO.: ML020880646 OFFICE PM:PDI-1 E LA:PDI-1 SC:PDI-1 NAME DSkay SLittle JMunday DATE 4/02/2002 4/3/02 4/3/02 Official Record Copy

Calvert Cliffs Nuclear Power Plant Unit Nos. 1 and 2 cc:

President Calvert County Board of Commissioners 175 Main Street Prince Frederick, MD 20678 James Petro, Esquire Counsel Constellation Power Source 111 Market Street Baltimore, MD 21202 Jay E. Silberg, Esquire Shaw, Pittman, Potts, and Trowbridge 2300 N Street, NW Washington, DC 20037 Mark Geckle Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 287 St. Leonard, MD 20685 Mr. Richard I. McLean, Manager Nuclear Programs Power Plant Research Program Maryland Dept. of Natural Resources Tawes State Office Building, B3 Annapolis, MD 21401 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Kristen A. Burger, Esquire Maryland Peoples Counsel 6 St. Paul Centre Suite 2102 Baltimore, MD 21202-1631 Patricia T. Birnie, Esquire Co-Director Maryland Safe Energy Coalition P.O. Box 33111 Baltimore, MD 21218 Mr. Loren F. Donatell NRC Technical Training Center 5700 Brainerd Road Chattanooga, TN 37411-4017

Calvert Cliffs Nuclear Power Plant Unit Nos. 1 and 2 cc:

President Calvert County Board of Commissioners 175 Main Street Prince Frederick, MD 20678 James Petro, Esquire Counsel Constellation Power Source 111 Market Street Baltimore, MD 21202 Jay E. Silberg, Esquire Shaw, Pittman, Potts, and Trowbridge 2300 N Street, NW Washington, DC 20037 Mark Geckle Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 287 St. Leonard, MD 20685 Mr. Richard I. McLean, Manager Nuclear Programs Power Plant Research Program Maryland Dept. of Natural Resources Tawes State Office Building, B3 Annapolis, MD 21401 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Kristen A. Burger, Esquire Maryland Peoples Counsel 6 St. Paul Centre Suite 2102 Baltimore, MD 21202-1631 Patricia T. Birnie, Esquire Co-Director Maryland Safe Energy Coalition P.O. Box 33111 Baltimore, MD 21218 Mr. Loren F. Donatell NRC Technical Training Center 5700 Brainerd Road Chattanooga, TN 37411-4017

MEETING WITH CALVERT CLIFFS NUCLEAR POWER PLANT, INC.

THURSDAY, MARCH 21, 2002 NAME ORGANIZATION Barry Thurston Constellation Doug Lenker Constellation Jim McQuighan Constellation Steve Dobler Constellation Donna Moeller Constellation Steve Paul Bechtel John Duryea Westinghouse Denny Popp Westinghouse Donna Skay NRR/ DLPM Angelos Marinos NRR/ EEIB Keith Mortensen NRR/ EEIB Matt Chiramal NRR/ EEIB Christopher Graham NRR/ EEIB