February 2002 Monthly Operating Report for Vogtle, Units 1 & 2
ML020870324
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/14/2002
From: Beasley J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LCV-1593-B
Download: ML020870324 (7)


Text

  • . Barnie Beasley, Jr., P.E.

Vice President Vogtle Project Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway PO. Box 1295 Birmingham, Alabama 35201 Tel 205.992.7110 Fax 205.992.0403 March 14, 2002 Docket Nos.

50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - FEBRUARY 2002 Enclosed are the February 2002 monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.

Sincerely, JBB/JLL Enclosures E 1-VEGP Unit 1 Monthly Operating Report - February 2002 E2-VEGP Unit 2 Monthly Operating Report - February 2002 cc:

Southern Nuclear Operating Company Mr. M. Sheibani SNC Document Management U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. R. R. Assa, Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle SOUTHERN COMPANY Energy to Serve Your World" LCV-1593-B

/ý<V.

ENCLOSURE I VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR FEBRUARY 2002 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-i UNIT SHUTDOWNS and NARRATIVE REPORT Page E 1-2

OPERATING DATA REPORT Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-424 VEGP UNIT 1 March 1,2002 Andrew R. Cato (706) 826-3823 Operating Status

1. Reporting Period:
2. Design Electrical Rating (Net MWe):
3. Maximum Dependable Capacity (Net MWe):

February - 2002 1169 1148 This Month Number Of Hours Reactor Was Critical:

Hours Generator On Line:

Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (MWHe):

672.0 672.0 0.0 795,885 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES E1-1

4.
5.
6.

7.

Year To Date 1416.0 1416.0 0.0 1,678,075 Cumulative 116,025.5 114,568.6 0.0 128,124,141 Date Tag No.

Event Description N/A N/A N/A

UNIT SHUTDOWNS Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-424 VEGP UNIT 1 March 1,2002 Andrew R. Cato (706) 826-3823 Reporting Period:

February - 2002 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.

Date S: Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:

(2) METHOD:

A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain)
3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS:

EVENT CAUSE:

CORRECTIVE ACTION:

CRITICAL PATH WAS:

NARRATIVE REPORT February 01, 2002 00:00 Unit at 100% power with no significant operating problems.

February 24, 2002 10:35 Unit began planned coastdown in preparation for refueling outage.

February 28, 2002 23:59 Unit at 97.7% power with no significant operating problems.

E1-2

ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR FEBRUARY 2002 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2

OPERATING DATA REPORT Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-425 VEGP UNIT 2 March 1, 2002 Andrew R. Cato (706) 826-3823 Operating Status

1. Reporting Period:
2. Design Electrical Rating (Net MWe):
3. Maximum Dependable Capacity (Net MWe):

February - 2002 1169 1149 This Month Number Of Hours Reactor Was Critical:

Hours Generator On Line:

Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (MWHe):

672.0 672.0 0.0 799,259 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES E2-1

4.
5.
6.

7.

Year To Date 1416.0 1416.0 0.0 1,684,054 Cumulative 102,469.8 101,656.7 0.0 114,476,520 Date Tag No.

Event Description N/A N/A N/A

UNIT SHUTDOWNS Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-425 VEGP UNIT 2 March 1, 2002 Andrew R. Cato (706) 826-3823 Reporting Period:

February - 2002 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.

Date S: Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:

(2) METHOD:

A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain)
3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS:

EVENT CAUSE:

CORRECTIVE ACTION:

CRITICAL PATH WAS:

NARRATIVE REPORT February 01, 2002 00:00 Unit at 100% power with no significant operating problems.

February 28, 2002 23:59 Unit at 100% power with no significant operating problems.

E2-2