|
---|
Category:Annual Report
MONTHYEARML13088A1642013-03-25025 March 2013 GE Hitachi Nuclear Energy - Annual Report for EVESR, 2012 ML12097A5152011-12-31031 December 2011 General Electric Co., Annual Financial Report for the Year 2011- Page 29 Through End ML12097A5142011-12-31031 December 2011 General Electric Co., Annual Financial Report for the Year 2011- Cover Through Page 28 ML0909303012009-03-31031 March 2009 Annual Report No. 50 for Getr, 2008 ML0909303002009-03-31031 March 2009 Annual Report No. 41 for EVESR, 2008 ML0809201312008-03-28028 March 2008 GE Hitachi Nuclear Energy - Annual Report for Getr, 2007 ML0608603132006-03-23023 March 2006 GE Energy, Annual Report for Getr, 2005, Report No. 47 ML0508704752005-03-10010 March 2005 General Electric Test Reactor Annual Report No. 46 for the Year 2004 ML0507301522005-03-10010 March 2005 Annual Report for EVESR, 2004 ML0409701852004-03-30030 March 2004 Annual Report for EVESR, 2003 ML0309205722003-03-21021 March 2003 Annual Report No. 35 for 2002 ML0309202242003-03-21021 March 2003 Annual Report for 2002 ML0208604552002-03-12012 March 2002 General Electric Test Reactor - Annual Report No. 43 for 2001 ML0208604502002-03-12012 March 2002 Esada-Vallecitos Experimental Superheat Reactor (Deactivated) Annual Report No. 34 for the Year 2001 2013-03-25
[Table view] Category:Letter
MONTHYEARIR 05000018/20240022024-10-29029 October 2024 GE Hitachi Nuclear Energy - NRC Inspection Report 05000018/2024-002, 05000070/2024002, 05000183/2024002, and 050-00073/2024002 ML24299A0682024-10-25025 October 2024 GEH Notification of GE Company Stock Beneficial Ownership Filing ML24284A1182024-10-10010 October 2024 GEH - Notification of GE Company Stock Beneficial Ownership Filing ML24271A1572024-09-27027 September 2024 Notification of Planned Closing, Trust Fund Balance at Transfer and Proof of Insurance ML24270A2242024-09-26026 September 2024 License Amendment Request - Historic and Cultural Resources Review Vallecitos Boiling Water Reactor and General Electric Test Reactor ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24165A2812024-06-13013 June 2024 Northstar Vallecitos, LLC, Documentary Evidence of Insurance Vallecitos Nuclear Center ML24157A0882024-06-0505 June 2024 GE-Hitachi Nuclear Energy Americas, LLC, Vallecitos Nuclear Center (Vnc) Organization Change ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000018/20240012024-05-29029 May 2024 GE Hitachi Nuclear Energy - NRC Inspection Report 05000018/2024-001, 050 00070/2024-001, 050-00183/2024-001, and 050-00073/2024-001 ML24039A0192024-04-25025 April 2024 Order Approving Transfer of the Vallecitos Nuclear Center Licenses and Conforming License Amendments ML24088A2392024-03-28028 March 2024 GE-Hitachi Nuclear Energy Americas, LLC, NRC Notice Before Actions Necessary to Accomplish the Indirect Transfers of Control Are Completed - Step Two ML24051A1802024-02-22022 February 2024 Boiling Water Reactor License Termination Plan Request for Additional Information - Letter ML24032A1082024-02-0101 February 2024 GEH Notification of GE Company Stock Beneficial Ownership Filing ML24022A3232024-01-22022 January 2024 Geha/Northstar Response to NRC Request for Additional Information Regarding Direct Transfer of Vnc Licenses IR 05000018/20230022024-01-0909 January 2024 GE Hitachi Nuclear Energy - NRC Inspection Report 05000018/2023002, 05000070/2023002, and 05000183/2023002 ML23345A1222023-12-21021 December 2023 Request for Additional Information Regarding the Direct Transfer of Control of Vallecitos Nuclear Center Licenses and Conforming License Amendments ML23345A0812023-12-11011 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A1312023-12-0404 December 2023 GE-Hitachi Nuclear Energy Americas, LLC, Additional Information to Geha and GNF-A Application for Order Consenting to Indirect Transfer of Control (Reference 1) ML23334A2222023-11-30030 November 2023 GE Hitachi Nuclear Energy - NRC Notice Before Actions Necessary to Accomplish the Indirect Transfers of Control Are Completed ML23283A3292023-11-30030 November 2023 NRC Issuance of Order Consenting to Indirect Transfer of Control of Ge/Geha/Gnfa Licenses ML23279A1322023-11-13013 November 2023 GE Hitachi Nuclear Energy - Vallecitos Nuclear Center, Getr Decommissioning Plan – (License Number TR-1, Docket Number 50-70) ML23310A1132023-11-0909 November 2023 FRN-Notice of Consideration of Approval of Direct Transfer of Control of Vallecitos Nuclear Center Licenses Conforming License Amendments Opportunity for a Hearing Transmittal Letter ML23305A0522023-11-0101 November 2023 GE Hitachi Nuclear Energy Additional Supplemental Information - Revised Exhibit H ML23275A1742023-10-26026 October 2023 Acceptance Review of Application for Consent to Direct Transfer of Control of Vallecitos Nuclear Center Licenses and Conforming License Amendments ML23292A3362023-10-19019 October 2023 Northstar Vallecitos, LLC, Supplemental Information - Financial Qualifications ML23276B3952023-10-13013 October 2023 The U.S. Nuclear Regulatory Commission Staff Assessment of Ge/Geha/Gnfa Reponses to Acceptance Observations Application for the U.S. Nuclear Regulatory Commission Consent to Indirect Transfer of Licenses ML23269A1062023-09-26026 September 2023 GEH Description of Process for Decommissioning the Vallecitos Nuclear Center (Vnc) Shutdown Reactors - Getr Decommissioning Plan ML23261A5922023-09-15015 September 2023 GE-Hitachi Nuclear Energy Americas, LLC, License Termination Plan for the Vallecitos Boiling Water Reactor License DPR-1 ML23257A2492023-09-14014 September 2023 Cultural Resources Report ML23248A2322023-09-0505 September 2023 GE Hitachi Nuclear Energy - Supplemental Information - Proposed Conforming Amendments & License Conditions ML23244A2472023-09-0101 September 2023 GE-Hitachi Nuclear Energy Americas, LLC and Northstar Vallecitos, LLC, Application for Consent to Direct Transfers of Control of Licenses and Related Conforming License Amendments ML23229A5122023-08-17017 August 2023 GE-Hitachi Nuclear Energy Americas, LLC, Response to NRC Staff Observations Enclosed with NRC Acceptance Letter (Reference 2) Related to GE, Geha and GNF-A Application (Reference 1) ML23191A8592023-07-27027 July 2023 Acceptance Letter GE GNFA and Geha Application for NRC Consent to Indirect Transfer of Licenses ML23150A0962023-05-30030 May 2023 GE Hitachi Nuclear Energy, Nuclear Center (Vnc) Organization Change ML23152A1162023-05-30030 May 2023 Application for Order Consenting to Indirect Transfer of Control with Respect to Reactor Licenses, Materials Licenses, and Export Licenses, and Notification Regarding Other Approvals IR 05000018/20230012023-05-0505 May 2023 GE Hitachi Nuclear Energy - NRC Inspection Report 05000018/2023001, 05000070/2023001, and 05000183/2023001 ML23123A0752023-04-12012 April 2023 Response to NRC Request for Inspection Documents ML23104A4172023-03-31031 March 2023 GNF-AGEH Financial Assurance of Decommissioning Funds - Surety Bond Riders Cover Letter and Affidavit ML23090A1802023-03-31031 March 2023 GEH - Financial Assurance Status Reports ML23083B3402023-03-24024 March 2023 GEH Annual Shutdown Reactor Reports for the Year 2022 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23054A3332023-02-23023 February 2023 GEH Notification of GE Company Stock Beneficial Ownership Filing ML23018A2832023-01-19019 January 2023 GE-Hitachi Nuclear Energy Americas, LLC Response to NRC Inspection Report 050-00018/2022-002; 050-00070/2022-002; 050-00183/2022-002 and Notice of Violation ML22339A1742022-12-13013 December 2022 GE Hitachi Nuclear Energy NRC Inspection Report 05000018/2022002 05000070/2022002 and 05000183/2022002 IR 05000018/20220022022-12-13013 December 2022 GE Hitachi Nuclear Energy NRC Inspection Report 05000018/2022002 05000070/2022002 and 05000183/2022002 ML22335A5262022-12-0101 December 2022 (Vnc) Organization Change ML22326A3522022-11-22022 November 2022 Limited Post Shutdown Decommissioning Activities Report Update ML22300A2102022-10-27027 October 2022 GE-Hitachi Nuclear Energy Americas, LLC, Nuclear Center (Vnc) Submittal of Radiological Emergency Plan (REP) Revision 2 ML22265A0442022-09-26026 September 2022 GE Hitachi Vallecitos Nuclear Center, U.S. Nuclear Regulatory Commissions Analysis of GE Hitachis Decommissioning Funding Status Reports for the Shutdown Power Reactors Vallecitos Boiling Water Reactor (License No. DPR-1, Docket No. 50-18) 2024-09-27
[Table view] |
Text
GE NuclearEnergy GeneralElectricCompany Vallecitos Nuclear Center 6705 Vallecitos Road. Sunol, C4 94586 March 12, 2002 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Annual Report for 2001
Reference:
License DR-10, Docket 50-183 Gentlemen:
Enclosed are three signed copies of Annual Report No. 34 for the deactivated ESADA Vallecitos Experimental Superheat Reactor located at Vallecitos Nuclear Center in Sunol, California.
If there are any questions or additional information is required, please contact the undersigned at 925-862-4455.
Sincerely, Senior Licensing Engineer Enclosures (3)
AQ;20 Ako0
GE NuclearEnergy Vallecitos Nuclear Center General Electric Company Sunol, California ESADA-VALLECITOS EXPERIMENTAL SUPERHEAT REACTOR (DEACTIVATED)
ANNUAL REPORT NO. 34 FOR THE YEAR 2001 LICENSE DR-10 DOCKET 50-183 MARCH 2002
ESADA-Vallecitos Experimental Superheat Reactor (Deactivated)
Annual Report No. 34 General Electric Company has maintained the ESADA Vallecitos Experimental Superheat Reactor (EVESR) in a deactivated status under the authority of Amendment No. 3 to License DR-10, Docket 50-183, issued June 11, 1976. In this annual report, a summary of the status of the facility for the period of January 1, 2001 to December 31, 2001 is presented, as required by paragraph 3.E.2. of the license.
1.0
SUMMARY
The facility remains in essentially the same condition described in Annual Report No. 33. Entry into the containment building was made for routine radiation surveys, a general examination of conditions throughout the building, and a maintenance project. In accordance with written procedures, the Facility Manager controls access to the containment building.
Radiation levels remain essentially unchanged.
2.0 STATUS OF FACILITY The facility continues to be in deactivated status. The plugs to the reactor vessel and head storage shield, the wooden cover over the fuel storage pool, and the locked covers for the personnel and equipment hatchways remain in-place except during maintenance or inspection activities.
3.0 RADIATION AND CONTAMINATION Complete radiation and contamination surveys of the facility indicate that levels remain low.
Results of the surveys are presented in Table 1. The radiation/contamination levels listed are representative but not necessarily maximum values.
4.0 ACTIVITIES Routine inspections were conducted during this report period. There were no preventive or corrective maintenance activities performed having safety significance during the reporting Page 1 of 3
EVESR Annual Report No. 34 period.
5.0 ORGANIZATION The management and operations organization for the EVESR is described in Technical Specification IX of License DR-10. Although the organizational structure remains the same, the General Manager has changed due to the retirement of G.L. Stimmell. The new General Manager is L.M. Quintana.
6.0 CONCLUSION
The General Electric Company concludes that the deactivated ESADA-Vallecitos Experimental Superheat Reactor is being maintained in a safe shutdown condition. The inspections, access control, and administratively controlled activities ensure maximum protection for the public health and safety. The procedures will be continued to maintain this high level of protection.
GENERAL ELECTRIC COMPANY Vallecitos Operations F.A. Arlt, Manager Facilities Maintenance Page 2 of 3
EVESR Annual Report No. 34 Table 1 Radiation and Contamination Level Data ESADA-Vallecitos Experimental Superheat Reactor (Deactivated)
Contamination Levels Surface Smears Airborne Radiation Levels Beta-Gamma* Beta-Gammat (mR/h Gamma) (cpm/fte X103) (g+/-Ci/cc x 10-")
Date of Measurement: 12/00 12/01 12/00 12/01 12/00 12/01 Reactor Enclosure Top of spent fuel pool (main 0.7 <1 -- -- -- -
floor) 549-ft level (main floor) <1-1.5 <1 500 400 0.009 0.014 534-ft level <1-4 <1-3 -- -- -- -
519-ft level <1-4 <1 .... 0.015 0.025 503-ft level (maximum pipe 0.5 <0.5 ...-- -
reading) 487-ft level (basement) <1 <1 0.002 0.004 Note:
Radiation levels, surface smears, and air samples may vary from survey to survey as they are taken in general areas rather than at specific locations.
"For conversion to d/m, assume an instrument efficiency of 20%.
t 24-hour decayed values Page 3 of 3