ML020860195
| ML020860195 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 03/11/2002 |
| From: | Reed C NRC/OCIO/WPDSD/FOIA |
| To: | Poindexter T Winston & Strawn |
| References | |
| FOIA/PA-2001-0256 | |
| Download: ML020860195 (4) | |
Text
NRC FORM 464 Part I U.S. NUCLEAR REGULATORY COMMISSION FOIAIPA RESPONSE NUMBER (6-1998)
( 11.
- 2001-0256 17 0 *RESPONSE TO FREEDOM OF o
INFORMATION ACT (FOIA) / PRIVACY
RESPONSE
FINAL PARTIAL ACT (PA) REQUEST TYPE REQUESTER DATE Thomas C. Poindexter, Esq.
M* I I 2M2 PART I. -- INFORMATION RELEASED No additional agency records subject to the request have been located.
Requested records are available through another public distribution program. See Comments section.
APPENDICES Agency records subject to the request that are identified in the listed appendices are already available for public inspection and copying at the NRC Public Document Room.
'APPENDICES Agency records subject to the request that are identified in the listed appendices are being made available for DD) public inspection and copying at the NRC Public Document Room.
Enclosed is information on how you may obtain access to and the charges for copying records located at the NRC Public Document Room, 2120 L Street, NW, Washington, DC.
4 iAPPENDICES SDD Agency records subject to the request are enclosed.
Records subject to the request that contain information originated by or of interest to another Federal agency have been referred to that agency (see comments section) for a disclosure determination and direct response to you.
4 We are continuing to process your request.
See Comments.
PART L.A -- FEES AMOUNT You will be billed by NRC for the amount listed.
None. Minimum fee threshold not met.
You will receive a refund for the amount listed.
Fees waived.
See comments for details PART I.B -- INFORMATION NOT LOCATED OR WITHHELD FROM DISCLOSURE No agency records subject to the request have been located.
Certain information in the requested records is being withheld from disclosure pursuant to the exemptions described in and for the reasons stated in Part II.
This determination may be appealed within 30 days by writing to the FOIA/PA Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Clearly state on the envelope and in the letter that it is a "FOIA/PA Appeal."
PART I.C COMMENTS (Use attached Comments continuation Paqe if required)
SIGNATURE-FREEDOM OF INFORMATION ACT AND PRIVACY ACT OFFICER.
Carol Ann Reed 7-V This form was designed using InForms PRINTED ON RECYCLED PAPER NRC FORM 464 Part 1 (6-1998)
Re: FOIA-2001-0256 APPENDIX DD RECORDS BEING RELEASED IN THEIR ENTIRETY NO.
DATE
- 1.
02/17/00
- 2.
02/24/00
- 3.
02/28/00
- 4.
03/06/00
- 5.
03/16/00
- 6.
03/20/00
- 7.
03/21/00
- 8.
04/04/00
- 9.
04/10/00 DESCRIPTION/(PAGE COUNT)
E-mail T. Shedlosky, RI, to B. Holian, RI, I. Jung, NRR, J.
Trapp, RI, and P. Eselgroth, RI, Re:
Indian Point Unit 2 SGTR - Licensee Preliminary Risk Estimate (1 page) Items 3, 5 E-mail J. Carrasco, RI, to W. Lanning, RI, Re: S/G Eddy Current-IP2 (10 pages) Item 5 E-mail S. Barber, RI to P. Eselgroth, RI, Re: Preliminary IP2 Tube Inspection Visual Results (1 page) Items 3, 5 Paper copy of computer file named "greenticketgalefRV1.wpd" containing draft letter to Congresswoman Galef with hand-written comments by S.
Long, NRR (3 pages) Items 3, 5 E-mail A. Blough, RI to B. Sheron, IP2 Comms, AIT Group, Re: Research Letter-on IP2 S/g's (1 page) Item 4 E-mail A. Blough, RI, to B. Bateman, B. Sheron, NRR, and D. Screnci, RI, et al. Re: Indian Point 2 restart schedule start-up vs. NRC actions (2 pages). Item 15 E-mail R. Lorson, RI, to J. Trapp, RI, S. Long, NRR, and T.
Shedlosky, RI, Re: Inputs needed for IP@ Tube Degradation Risk Estimate (1 page) Items 3, 5 E-mail J. Trapp, RI, to R. Blough, RI, R. Barrett, NRR, and W. Lanning, RI, Re: Indian Point Unit 2 Senior Management Meeting Preparations, with 2 file attachments: (1) file named "IP2 August 31 Event.wpd" containing document titled "Worksheet for Reactor and Plant System Degraded Conditions" and (2) file named "IP2 EP Issues SDP.wpd" (11 pages) Items 3, 5 E-mail P. Habighorst, RI, to P. Eselgroth, RI, Re: SG Status at IP2 [includes hand-written notes by S. Long, NRR] (2
pages) Items 3, 5
- 10.
06/05/00
- 11.
07/24/00
- 12.
07/25/00
- 13.
07/25/00
- 14.
07/26/00
- 15.
08/07/00
- 16.
08/15/00
- 17.
08/17/00
- 18.
08/30/00
- 19.
09/22/00
- 20.
10/03/00
- 21.
10/03/00 E-mail D. Lew, RI, to B. Bateman, E. Sullivan, E. Murphy, NRR, Re: IP2 SG Inspection w/att Rev 2 of SG inspection plan (4 pages) Item 3 Jim Baumstark's comments, NRC Exit, 1997 Steam Generator inspection. (1 page)
Enforcement Panel Material cover sheet, with attached e mail from G. Matakas with enclosures. (13 pages)
Draft Review of IP2 1997 Steam Generator Eddy Current Program (I. Barnes) (4 pages) Item 2 Comments on July 20, 2000, IP2 Handout (I. Barnes) (2 pages) Item 2 E-mail T. Shedlosky, RI, to R. Barrett, NRR, and S. Long, NRR, Re: IP-2 SGTR Analysis (1 page) Items 3, 5 Unsigned Ltr W. Lanning, RI, to A. Blind, Consolidated Edison, S. Long (NRR) computer file named "ip2sg2000 010rev.5.wpd" containing a draft version of the NRC Special Inspection Report (48 pages) Items 3, 5 Fax T. Shedlosky, RI, to S. Long, NRR, Re: Draft NOV pertaining to risk assessment (10 pages) Items 3, 5 Unsigned Ltr W. Lanning, RI, to A. Blind, Consolidated Edison, S. Long (NRR) computer named "ip2SG2000 101 rev8.wpd" containing a draft version of the NRC Special Inspection Report (45 pages) Items 3, 5 E-mail D. Lew, RI, to R. Blough, RI, A. Madison, NRR, B.
Bateman, NRR, Re: IP2 Regulatory Conference (1 page)
Items 3, 5 E-mail W. Raymond, RI, to J. Trapp, RI, Re: FW: Follow Up NRC Meeting 9/26 - Industry Events (1 page )Items 3, 5 E-mail W. Raymond, RI, to J. Trapp, RI, Re: FW: Final Follow Up for 9/26/00 NRC Meeting, ALTRAN Questions (1 page) Items 3, 5
- 22.
10/03/00
- 23.
10/17/00
- 24.
10/24/00
- 25.
11/01/00
- 26.
12/18/00
- 27.
12/26/00
- 28.
01/02/01
- 29.
01/02/01
- 30.
01/10/01 E-mail W. Raymond, RI, to J. Trapp, RI, Re: FW:SGTR Sequence Writeup for NRC (1 page) Items 3, 5 Draft Indian Point Unit 2 SGT Failure Risk Perspective (2 pages) Item 3 E-mail S. Barber, RI, to B. Holian, RI, and P. Eselgroth, RI, Re: Final Decision for the IP2 SG "Red" Finding (1 page)
Items 3, 5 E-mail B. Holian, RI, to S. Long, NRR, Re: Thank you...and
'aqua-bluish words' [includes hand-written marginal comments by S. Long, NRR (2 pages) Items 3, 5 E-mail B. Holian, RI, to S. Long, NRR, Re: Re:Con Ed Appeal Date (1 page) Items 3, 5 E-mail J. Trapp, RI, to S. Long, NRR, Re: Risk Assessment for IP2 SGTR & Loss of Bus 6A (2 pages) with WordPerfect file named"Ask the ET.wpd" (1 page)Items 3, 5 E-mail S. Long, NRR, to P. O'NEILL and S. Weerakkody, RES, Re: Fwd: Risk Assessment of IP2 SGTR & Loss of Bus 6A, with 2 attachments: (1) e-mail J. Trapp, RI, to S.
Long, NRR, 12/26/00, "Risk Assessment of IP2 SGTR &
Loss of Bus 6A" and (2) WordPerfect document dated "August 17, 2000, Revised September 21, 2000" titled "Risk Assessment for Indian Point Unit 2 A Hypothetical Case Loss of Safeguards Electrical Bus 6A Coincident with a Steam Generator Tube Rupture" (38 pages) Items 3, 5 E-mail J. Trapp, RI, to S. Long, NRR, Re: Re: Combination of IP2 LOSP and SGTR Events (2 pages)Items 3, 5 Allegation Review Board Disposition Record (5 pages) Item 2