ML020850284
From kanterella
Jump to navigation
Jump to search
Letter Sequence Other | |
---|---|
MONTHYEARML0208502842002-04-11011 April 2002
[Table View]Relief, Approval of Inservice Inspection Relief Request - Use of ASME Code Case N-597 (TAC MB1693 and MB1694) Project stage: Other 2002-04-11 |
ML020850284 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 04/11/2002 |
From: | Stephen Dembek NRC/NRR/DLPM/LPD4 |
To: | Rueger G Pacific Gas & Electric Co |
References | |
TAC MB1693, TAC MB1694 | |
Download: ML020850284 (8) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:Code Relief or Alternative
MONTHYEARML20249C8502020-10-22022 October 2020
[Table view]Proposed Alternative NDE-RCS-SE-2R22 to the Requirements of the ASME Code ML19176A0082019-06-28028 June 2019 Request for Relief from the Inservice Inspection Program Requirements of ASME Code, Section XI, for Steam Generator and Pressurizer Nozzle Inside Radius Sections ML19023A0262019-01-25025 January 2019 Request for Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-4 ML17263A0592017-10-0606 October 2017 Diablo Canyon Power Plant, Unit 2 - Relief Requests to Allow Use of Proposed Alternatives to Implement Requirements of ASME Code, for Reactor Pressure Vessel Welds for the Third ISI Interval (CAC Nos. MF9386, MF9387, MF9388, MF9389, and MF9390) ML17138B1152017-05-18018 May 2017 10 CFR 50.55a Request for Approval of Alternative - RI-ISI-2 ML17037D2672017-03-0909 March 2017 Relief Request NDE-RCS-SE-1R20 to Allow Use of Alternate Depth Sizing Criteria for the Fourth Inservice Inspection ML16207A3972016-07-27027 July 2016 Relief Request NDE-SIF-U1, Allow Use of Alternate Examination Volume Coverage Requirements, Class 2 Seal Injection Welds, for the Third 10-Year Inservice Inspection Interval ML16056A5132016-03-0707 March 2016 Relief Request FLIG-U1, Request to Extend Third 10-Year Inservice Inspection Interval for Reactor Vessel Stud Hole Ligament Examinations ML16055A2812016-02-26026 February 2016 Relief Request NDE-FWNS-U1/U2 to Allow Use of Alternate Examination Volume Coverage Requirements, Third 10-Year Inservice Inspection Interval ML16013A3402016-01-27027 January 2016 Relief Request NDE-PNS-U2A, ASME Code Section XI Requirements to Allow Use of Alternate Exam Volume Coverage Requirements, for the Third 10-year Inservice Inspection Interval ML15337A0212015-12-0808 December 2015 Relief Request NDE-SG-MS-IR - Relief from Exam Requirements for Main Steam Nozzles in Replacement Steam Generators, Third 10-Year Inservice Inspection Interval ML15299A0342015-11-0404 November 2015 Relief Request NDE-RCS-SE-2R19, Use of Alternate Sizing Qualification Criteria Through a Protective Clad Layer, Third 10-Year Inservice Inspection Interval DCL-15-118, Response to NRC Request for Additional Information Regarding Relief Request FLIG-U12015-10-12012 October 2015 Response to NRC Request for Additional Information Regarding Relief Request FLIG-U1 ML15261A0072015-09-18018 September 2015 Request for Relief PRS-3, Proposed Alternative to Requirements for System Leakage Testing Class 1 Piping Vent, Drain, and Test Isolation Devices, for the Third 10-year Inservice Inspection Interval (TAC MF6520-MF6521) DCL-15-086, ASME Section XI Inservice Inspection Program Request for Relief PRS-32015-07-28028 July 2015 ASME Section XI Inservice Inspection Program Request for Relief PRS-3 ML15187A0352015-07-15015 July 2015 Relief Request REP-SI, Revision 2, Proposed Alternative for Repair/Replacement Activities for Certain Safety Injection Pump Welded Attachments, Remaining Useful Life +20 Years ML15168A0242015-06-19019 June 2015 Request for Alternative RPV-U1 - Extension to Allow Use of Alternate Reactor Inspection Interval Requirements for the Third 10-Year Inservice Inspection Interval DCL-15-075, Relief Request REP-SI - Supplement2015-06-18018 June 2015 Relief Request REP-SI - Supplement ML14251A4682014-09-16016 September 2014 Relief Request NDE-SFW-13, ASME Code Section XI, Request for Alternative to Allow Use of Alternate Examination Requirements, Third 10-Year Inservice Inspection Interval ML14196A0952014-08-0404 August 2014 Request for Relief from ASME Code Requirements for Mechanical Clamping Devices for Class 2 and 3 Piping Pressure Boundary ML14104B6132014-05-14014 May 2014 Relief Request NDE-PNS-U2, Requirements for Examination Coverage of ASME Class 1 Pressurizer Nozzle-to-Head Welds, Third 10-Year Inservice Inspection Interval ML13350A1512014-01-0303 January 2014 Relief Request NDE-RCS-SE-1R18, Alternative to ASME Code, Section XI, App. Viii, Suppl. 2 and 10 as Modified by CC N-695 and CC N-696, to Allow Use of Alternative Depth-Sizing Criteria ML13192A3542013-09-12012 September 2013 Relief Request RVFLNG-INT3 - Alternative to ASME Code Pressure Test Requirements for Class 1 Reactor Vessel Flange Leakoff Lines, Third 10-Year Inservice Inspection Interval (TAC MF0408-MF0409) ML13232A3082013-08-28028 August 2013 Relief Request REP-1 U2, Revision 2, Alternative to Code Requirements for Pressurizer Structural Weld Overlays, for the Third 10-Year Inservice Inspection Interval DCL-13-038, ASME Section XI Inservice Inspection Program Relief Request NDE-RCS-SE-1R18 to Allow Use of Alternative Depth Sizing Criteria2013-04-11011 April 2013 ASME Section XI Inservice Inspection Program Relief Request NDE-RCS-SE-1R18 to Allow Use of Alternative Depth Sizing Criteria ML1106003562011-03-29029 March 2011 Relief Request NDE-RCS-SE-2R16, Alternative to Requirements of ASME Code, Section XI, Supplement 10 as Modified by Code Case N-695, Qualification Requirements for Dissimilar Metal Piping Welds ML0801100012008-02-0606 February 2008 Approval of Relief Request REP-1 U2, Revision 1, for the Application of Weld Overlay on Dissimilar Metal Welds of Pressurizer Nozzles ML0716200722007-06-25025 June 2007 Relief Requests NDE-SLH U2 and NDE-LSL U2 for Second 10-year Inservice Inspection Interval Re Reactor Vessel Shell Weld Inspections ML0707803692007-03-29029 March 2007 Relief Request NDE-SBR for the Second 10-Year Interval Inservice Inspection and Examination Program for Snubbers DCL-07-032, Response to NRC Request for Additional Information Regarding ASME Section XI Inservice Inspection Program Relief Requests NDE-SLH U2 and NDE-LSL U22007-03-23023 March 2007 Response to NRC Request for Additional Information Regarding ASME Section XI Inservice Inspection Program Relief Requests NDE-SLH U2 and NDE-LSL U2 ML0621200382006-09-20020 September 2006 Relief, Relief Request for Relief NDE-SLH (TAC No. MC9474) - Reactor Pressure Vessels Welds DCL-06-069, Residual Heat Removal Weld RB-119-11 - Flaw Analytical Evaluation Results2006-06-0606 June 2006 Residual Heat Removal Weld RB-119-11 - Flaw Analytical Evaluation Results ML0608203592006-04-0404 April 2006 Relief, Relief Request for Second Inservice Inspection Interval for Steam Generator Welds, MC9473 ML0603302512006-01-30030 January 2006 Relief Requests 1, 2, and 3 Approval ML0526603312005-10-26026 October 2005 Diablo Canon Pp, Units 1 & 2 - Approval of Requests for Relief from the (ASME) Boiler and Pressure Vessel Code (Code) Section XI Inservice Inspection Program Requirements (Tac Nos MC6693 & MC6694) ML0208502842002-04-11011 April 2002 Relief, Approval of Inservice Inspection Relief Request - Use of ASME Code Case N-597 (TAC MB1693 and MB1694) 2020-10-22 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML020850284&oldid=2708573"