February 2002 Monthly Operating Report for South Texas Project Units 1 & 2
ML020840319
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/11/2002
From: Mallen F
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
G02, NOC-AE-02001285, ST131415048
Download: ML020840319 (14)


Text

Nuclear Operating Company South Texas Projcct N1uclear Operating Company PO Boa 289 Wadsworth, Texas 77483 V

March 11, 2002 NOC-AE-02001285 File No. G02 ST131415048 10CFR50.71 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for February 2002 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for February 2002.

If you should have any questions on this matter, please contact R. L. Hill at (361) 972-7667.

Sincerely, F. H. Mallen Manager, Planning & Controls Attachments:

1) STPEGS Unit 1 Monthly Operating Report - February 2002
2) STPEGS Unit 2 Monthly Operating Report - February 2002

NOC-AE- 02001285 File No.: G02 STI No.:31415048 Page 2 Cc:

Ellis W. Merschoff Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mohan C. Thadani U. S. Nuclear Regulatory Commission Project Manager, 1 White Flint North 11555 Rockville Place Rockville, MD 20852-2738 Mail Stop: O-7D1 Cornelius F. O'Keefe U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code MN 16 Wadsworth, TX 77483 A. H. Gutterman, Esquire Morgan, Lewis & Bockius 1800 M. Street, N.W.

Washington, DC 20036-5869 M. T. Hardt/W. C. Gunst City Public Service P. 0. Box 1771 San Antonio, TX 78296 A. Ramirez/C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 Jon C. Wood Matthews & Branscomb 112 East Pecan, Suite 1100 San Antonio, Texas 78205-3692 Institute of Nuclear Power Operations - Records Center 700 Galleria Parkway Atlanta, GA 30339-5957 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 R. L. Balcom/D. G. Tees Reliant Energy, Inc.

P. 0. Box 1700 Houston, TX 77251 C. A. Johnson/A. C. Bakken, Uif AEP - Central Power and Light Company P. 0. Box 289, Mail Code: N5022 Wadsworth, TX 77483 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT FEBRUARY 2002 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 Approved By:

I

-?

E.D. HALP IN' Date

MONTHLY

SUMMARY

South Texas Project Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKET NO.

50-498 UNIT 1

DATE Mar. 5, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1.

REPORTING PERIOD: 02/1/02-02/28/02 GROSS HOURS IN REPORTING PERIOD: 672

2.

CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None

4.

REASONS FOR RESTRICTION (IF ANY): N/A

5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.

19.

THIS MONTH YR TO DATE CUMULATIVE NUMBER OF HOURS REACTOR CRITICAL 672.0 1,416.0 91,365.9 REACTOR RESERVE SHUTDOWN HOURS 0

0 0

HOURS GENERATOR ON LINE 672.0 1,416.0 89,735.8 UNIT RESERVE SHUTDOWN HOURS 0

0 0

GROSS THERMAL ENERGY GENERATED (MWH) 2,559,711 5,399,284 334,697,624 NET ELECTRICAL ENERGY GENERATED (MWH) 850,795 1,793,66 109,141,780 REACTOR SERVICE FACTOR (%)

100.0 100.0 77.1 REACTOR AVAILABILITY FACTOR (%)

100.0 100.0 77.1 UNIT SERVICE FACTOR (%)

100.0 100.0 75.7 UNIT AVAILABILITY FACTOR (%)

100.0 100.0 75.7 UNIT CAPACITY FACTOR - Using MDC (%)

101.2 101.3 73.7 UNIT CAPACITY FACTOR - Using DER (%)

101.2 101.3 73.7 UNIT FORCED OUTAGE RATE (%)

0.0 0.0 14.1 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-498 UNIT 1

DATE Mar. 5, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH FEBRUARY DAY DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1269 1268 1269 1269 1263 1267 1263 1267 1271 1273 1270 1272 1276 1270 1271 1271 16 17 18 19 20 21 22 23 24 25 26 27 28 AVERAGE DAILY POWER LEVEL (MWe-Net) 1271 1266 1185 1264 1270 1270 1271 1270 1269 1269 1270 1270

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-498 UNIT 1

DATE Mar. 5, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH FEBRUARY 1

F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4

IEEE 805-1983 5

IEEE 803-1983 1

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)

Shutting Event Code Code Down Report #

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT FEBRUARY 2002 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 Approved By:

c E.D. HALPIN E.D.HAL~NI at-e

MONTHLY

SUMMARY

South Texas Project Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKETNO.

50-499 UNIT 2

DATE Mar. 5, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1.

REPORTING PERIOD: 02/1/02-02/28/02 GROSS HOURS IN REPORTING PERIOD: 672

2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None

4.

REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE NUMBER OF HOURS REACTOR CRITICAL 672.0 1,416.0 89,230.0 REACTOR RESERVE SHUTDOWN HOURS 0

0 0

HOURS GENERATOR ON LINE 672.0 1,416.0 87,043.7 UNIT RESERVE SHUTDOWN HOURS 0

0 0

GROSS THERMAL ENERGY GENERATED (MWH) 2,563,467 5,402,307 324,562,838 NET ELECTRICAL ENERGY GENERATED (MWH) 844,157 1,778,917 105,737,038 REACTOR SERVICE FACTOR (%)

100.0 100.0 80.2 REACTOR AVAILABILITY FACTOR (%)

100.0 100.0 80.2 UNIT SERVICE FACTOR (%)

100.0 100.0 78.2 UNIT AVAILABILITY FACTOR (%)

100.0 100.0 78.2 UNIT CAPACITY FACTOR - Using MDC (%)

100.4 100.5 76.0 UNIT CAPACITY FACTOR - Using DER (%)

100.4 100.5 76.0 UNIT FORCED OUTAGE RATE (%)

0.0 0.0 13.8 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.

19.

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO.

50-499 UNIT 2

DATE Mar. 5, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH FEBRUARY AVERAGE DAILY POWER LEVEL (MWe-Net) 1253 1252 1262 1262 1254 1245 1261 1253 1258 1259 1260 1254 1257 1256 1258 1258 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 18 19 20 21 22 23 24 25 26 27 28 1257 1254 1254 1257 1254 1257 1258 1256 1254 1256 1257 1258 DAY 15 16

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-499 UNIT 2

DATE Mar. 5, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH FEBRUARY 1

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)

Shutting Event Code Code Down Report #

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD 1

F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4

IEEE 805-1983 5

IEEE 803-1983

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.