ML020810270

From kanterella
Jump to navigation Jump to search
Meeting Between NRC Staff and FENOC Management Will Discuss the Results of the Nrc'S Assessment of the Safety Performance at Beaver Valley Power Station for the Period April 1, 2001, to December 31, 2001
ML020810270
Person / Time
Site: Beaver Valley
Issue date: 03/21/2002
From: Rogge J
NRC/RGN-I/DRP/PB7
To:
References
Download: ML020810270 (3)


Text

U.S. NUCLEAR REGULATORY COMMISSION No. 02-21 REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING March 21, 2002 Licensee: FirstEnergy Nuclear Operating Company (FENOC)

Facility: Beaver Valley Power Station Docket Nos.: 05000334, 05000412 Time and Date: 1:00 p.m., Tuesday, April 9, 2002 Location: Beaver Valley site Emergency Response Facility Conference Room A Beaver Valley Power Station Shippingport, PA 15077

Purpose:

The NRC staff and FENOC management will discuss the results of the NRCs assessment of the safety performance at Beaver Valley Power Station for the period April 1, 2001, to December 31, 2001. This assessment is described in the annual assessment letter dated March 1, 2002, and can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/bv_2001q4.pdf.

The agenda for this meeting will consist of an overview of the NRCs Reactor Oversight process and a presentation on the annual safety assessment of Beaver Valley Power Station given by NRC staff, followed by an FENOC management response to the assessment. Information relative to this annual safety performance assessment can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/BV1/bv1_chart.html and http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/BV2/bv2_chart.html. Following the meeting there will be a brief break followed by a public Q&A session for those who have additional questions for the NRC.

NRC Attendees: J. Rogge, Chief, Projects Branch 7, DRP D. Kern, Senior Resident Inspector - Beaver Valley, DRP G. Smith, Resident Inspector - Beaver Valley, DRP N. Perry, Senior Project Engineer, DRP J. Herrera, Project Engineer, DRP Licensee Attendees: R. Saunders, President FENOC L. W. Myers, Senior Vice President Beaver Valley L. W. Pearce, General Manager F. von Ahn, Director, Nuclear Engineering R. Donnellon, Director, Maintenance M. Pearson, Director, Services and Projects J. Lash, Director, Personnel Development

2 Note: This meeting is open to the public for observation. The NRC staff will be available at the end of the meeting to answer questions from the public. The NRC encourages public participation by observation of this annual safety performance assessment meeting and by providing questions and comments to the NRC staff following the meeting either in person or in writing. Members of the public are also encouraged to provide comments or questions in writing in advance of the meeting. Comments can be sent to John F. Rogge, Chief, Reactor Projects Branch 7, Division of Reactor Projects at the following address: US Nuclear Regulatory Commission - Region I, 475 Allendale Road, King of Prussia, PA 19406-9866. Attendance by additional personnel should be made known by April 5, 2002, via telephone call to John Rogge at (610) 337-5146.

Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known, preferably at least two business days prior to the meeting.

/RA/

Approved By:

John F. Rogge, Chief Projects Branch 7 Division of Reactor Projects Distribution:

L. W. Myers, Senior Vice President FirstEnergy Nuclear Operating Company Commonwealth of Pennsylvania State of Ohio State of West Virginia PUBLIC Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DRM Division Secretary, RI DNMS Division Secretary, RI Region I Receptionist

3 Distribution (Via E-Mail):

W. Travers, Executive Director for Operations, OEDO W. Kane, Deputy Executive Director for Regulatory Programs, OEDO T. Bergman, Region I Coordinator, OEDO S. Collins, Director, Office of Nuclear Reactor Regulation (NRR)

J. Johnson, Deputy Director, Office of Nuclear Regulatory Research B. Boger, Director, Division of Inspection Program Management, NRR D. Matthews, Director, Division of Regulatory Improvement Programs, NRR J. Zwolinski, Director, Division of Licensing Project Management, NRR F. Congel, Director, Office of Enforcement D. Screnci, Senior Public Affairs Officer, RI N. Sheehan, Field Public Affairs Officer, RI G. Matakas, ORA R. Bores, ORA W. Lanning, DRS R. Crlenjak, DRS E. Adensam, NRR D. Collins, NRR R. Clark, NRR PMNS NRCWEB DOCUMENT NAME: C:\Program Files\Adobe\Acrobat 4.0\PDF Output\BV eocmtgnotice.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI:DRP RI:DRP NAME Perry/JFR f/ Rogge/JFR DATE 03/21/02 03/21/02 OFFICIAL RECORD COPY