ML020810233
| ML020810233 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 03/12/2002 |
| From: | Barnes G Exelon Nuclear |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML020810233 (1) | |
Text
Exelon.
Exelon Gereration Company, LLC wwwlexeloncorp cor Nuclear LaSalle County Station 2601 North 21`Road Marseilles, IL 61341-9757 March 12, 2002 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 LaSalle County Station, Unit 2 Facility Operating License No. NPF-18 NRC Docket No. 50-374
Subject:
Unit 2 Cycle 9 Core Operating Limits Report (COLR)
Exelon Generation Company (EGC), LLC, in accordance with LaSalle County Station Technical Specifications (TS) Section 5.6.5, "Core Operating Limits Report,"
is submitting a revision to the Core Operating Limits Report (COLR). The revision is due to a change in minimum critical power ratio (MCPR) operating limits and power dependent limiting heat generation rate (LHGR) factor multipliers for LaSalle County Station Unit 2 Cycle 9 operations. The new limits are based on nominal control rod scram speeds, and a core exposure limit of 14,000 megawatt-days/metric ton uranium (MWD/MTU). Additionally, associated administrative changes have also been incorporated.
Should you have any questions concerning this submittal, please contact Mr.
William Riffer, Regulatory Assurance Manager, at (815) 415-2800.
Respectfully,
./
George P. Barnes Site Vice President LaSalle County Station Attachment cc:
Regional Administrator - NRC Region III NRC Senior Resident Inspector - LaSalle County Station