Dominon Nuclear Connecticut, Inc., Millstone Nuclear Power Station Units 2 and 3 Answer to Order for Interim Safeguards and Security Compensatory Measures Dated February 25, 2002
ML020810017
Person / Time
Site: Millstone  
Issue date: 03/18/2002
From: Sarver S
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
B 18617
Download: ML020810017 (3)


Text

b)ominion Generation 5000 Do irnmio BoLIcI'C.rd, (Glin Allen, VA 23060 March 18, 2002 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 i Dominion!

Re: 10 CFR 2.202 10 CFR 50.4 Serial No.:

B 18617 NL&OS/DAS: R1 Docket Nos.:

50-336 50-423 License Nos.: DPR-65 NPF-49 Gentlemen:

DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE NUCLEAR POWER STATION UNITS 2 AND 3 ANSWER TO ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES DATED FEBRUARY 25, 2002 In a letter dated March 15, 2002 (Serial No. B 17605), Dominion Nuclear Connecticut (DNC) provided its answer to the Nuclear Regulatory Commission's (NRC) Order for Interim Safeguards and Security Compensatory Measures. Attachments 1 and 2 to that letter were intended to summarize the subsequent actions and provide a response to each of the items in Attachment 2 to the Order for the Millstone Power Station. It has come to our attention that Surry Power Station Attachments 1 and 2 were inadvertently included with the Millstone Power Station letter rather than the intended Millstone attachments during administrative processing for transmittal.

Please replace the inappropriate attachments with Millstone Power Station Attachments 1 and 2.

For completeness, we have also included a copy of the original letter as Attachment 3.

Attachments 1 and 2 to this letter contain Safeguards Information as defined by 10 CFR 73.21, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.

We apologize for any inconvenience. If you have any questions, please contact us.

Very truly yours, Step-hen S. Sarver - Director Nuclear Licensing and Operations Support ATTACHMENTS 1 AND 2 CONTAIN SAFEGUARDS INFORMATION.

UPON SEPARATION THIS PAGE IS DECONTROLLED.

4,,

Attachment I -

Summary of Subsequent Action Items From Attachment 2 (Safeguards Information)

Response To Interim Compensatory Measures For High Threat Environment (Safeguards Information)

Original letter Serial Number B 17605 cc:

U. S. Nuclear Regulatory Commission ATTN: Mr. Glenn Tracy Mail Stop O-6H16 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Samuel J. Collins, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 U. S. Nuclear Regulatory Commission Region I Regional Administrator 475 Allendale Road King of Prussia, PA 19406-1415 ATTACHMENTS I AND 2 CONTAIN SAFEGUARDS INFORMATION.

UPON SEPARATION THIS PAGE IS DECONTROLLED.

SN: B 18617 Docket Nos.: 50-336/423

Subject:

Answer To Order For Interim Safeguards And Security Compensatory Measures Dated February 25, 2002 COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO

) )

)

The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Stephen P. Sarver, who is Director - Nuclear Licensing and Operations Support, of Dominion Resources Services, Inc.

He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this 18th day of March, 2002.

My Commission Expires:

March 31, 2004.

S-* v otaryPublic (SEAL)