ML020800285
| ML020800285 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 03/18/2002 |
| From: | Bergendahl H FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 2769 | |
| Download: ML020800285 (2) | |
Text
Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, Ohio 43449-9760 FirstEnergy Nuclear Operating Company Howard W. Bergendahl 419-321-8588 Vice President - Nuclear Fax: 419-321-8337 Docket Number 50-346 License Number NPF-3 Serial Number 2769 March 18, 2002 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
Subject:
Response to Order for Interim Safeguards and Security Compensatory Measures for the Davis-Besse Nuclear Power Station, Unit 1 Ladies and Gentlemen:
The FirstEnergy Nuclear Operating Company has reviewed the Order for Interim Safeguards and Security Compensatory Measures for the Davis-Besse Nuclear Power Station (DBNPS), issued on February 25, 2002. This Order, which modifies the current operating license for the DBNPS, requires a response regarding the implementation of the requirements set forth in Attachment 2 to the Order.
The DBNPS intends to comply with the requirements described in Attachment 2 to the Order. The current status of the DBNPS implementation of each of these requirements is listed in the Enclosure to this response. In instances where compliance has not yet been achieved, a schedule for implementation has been provided, with the exception of Interim Compensatory Measure B.2.a, which will be provided at a later date. For the implementation schedules provided in the Enclosure, complete implementation will be achieved no later than August 31, 2002, as required by the Order.
The information contained in the Enclosure to this letter is considered Safeguards Information under the provisions of 10 CFR 73.21, and is thereby exempt from public disclosure. Upon separation of the Enclosure, this letter is may be handled as decontrolled.
If there are any questions concerning this matter, please contact Mr. Gary A. Skeel, Manager - Security, at 419-249-2322.
SAFEGUARDS INFORMATION When Separated From Attachments, Handle This Document as Decontrolled.
Docket Number 50-346 License Number NPF-3 Serial Number 2769 Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on March 18, 2002.
Howard W. Bergendahl GMW/s Attachments cc: Samuel J. Collins, Director, Office of Nuclear Reactor Regulation James E. Dyer, Regional Administrator, NRC Region III Stephen P. Sands, DB-1 NRC/NRR Project Manager (w/o enclosure)
C. Scott Thomas, DB-1 Senior NRC Resident Inspector Glenn Tracy, Chief, Reactor Safeguards SAFEGUARDS INFORMATION When Separated From Attachments, Handle This Document as Decontrolled.