J. D. Woodard Southern Nuclear SAFEGUARDS INFORMATION Executive Vice President Operating Company, Inc.

(THIS PAGE IS DECONTROLLED IF 40 Inverness Center Parkway DETACHED FROM SGI PAGES IN Post Office Box 1295 ENCLOSURE)

Birmingham, Alabama 35201 Tel 205.992.5086 SOUTHERNA N

COMPANY March 18, 2002 Energy to Serve YourWorld' Docket Nos.

50-348 NEL-02-0060 50-364 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Order For Interim Safeguards and Security Compensatory Measures Joseph M. Farley Nuclear Plant, Units 1 & 2 Licensee Response Pursuant to Sections HLI.B and III.C.

Dear Ladies and Gentlemen:

By letter dated February 25, 2002, Southern Nuclear Operating Company (SNC) received the subject Order for Interim Safeguards and Security Compensatory Measures. SNC recognizes the modifications that Order Sections III.B. and III.C. have made to the Facility Operating Licenses NPF-2 and NPF-8 for the Farley Nuclear Plant (FNP). In accordance with the Order and 10 CFR 50.4, SNC is submitting herein its Response to the Order for FNP within the requisite twenty days1. As reflected in the enclosed response, the twenty days allotted for the response required by Sections III.B. and III.C. of the Order have not been adequate for the completion of all the evaluation and analysis necessary for SNC to fully address all of the issues requiring a response. In accordance with the authority of the Director, NRR to "relax or rescind any of the... conditions" set forth in Section III of the Order upon a showing of good cause, SNC requests permission to supplement its response as appropriate upon completion of these evaluations and analyses.

Southern Nuclear Operating Company (SNC) has submitted an Answer to the Order pursuant to Section IV of the Order and 10 CFR 2.202 under separate cover. SNC's Answer is incorporated by reference in this Response. In addition, SNC has requested an extension of time in which to answer and to request a hearing relative to the Order pursuant to a letter dated March 18, 2002 from J. D. Woodard to Samuel J. Collins Director, NRR.

SAFEGUARDS INFORMATION (THIS PAGE IS DECONTROLLED IF DETACHED FROM SGI PAGES IN ENCLOSURE)

'p

SAFEGUARDS INFORMATION (THIS PAGE IS DECONTROLLED IF DETACHED FROM SGI PAGES IN ENCLOSURE)

U.S. Nuclear Regulatory Commission Page 2 As presented in the Order, SNC has voluntarily and responsibly implemented significant additional security measures following the events of September 11, 2001. SNC recognizes the need for increased security awareness and augmented action in the present generalized US Nuclear Regulatory Commission high-level threat environment. SNC will continue to meet the objectives of Security Level IH described in NRC Information Notice 98-35, and maintain the effectiveness of existing security measures taken in response to the events of September 11, 2001.

In accordance with 10 CFR 2.202(a)(2) for an Answer to an Order, the following affirmation is required:

J. D. Woodard states he is Executive Vice President of Southern Nuclear Operating Company and is authorized to execute this oath on behalf of Southern Nuclear Operating Company, and to the best of his/her knowledge and belief, the facts set forth in this letter are true.

Respectfully submitted, J.,SD.oVdard So Nuclear Operating Company Sworn to and subscribed before me this /'L'day ofZ4Z.,c'.

2002.

My commission expires:__

JDW/JMG

Enclosure:

Response to Section III.B. and llI.C. of the Order - Joseph M. Farley Nuclear Plant (NOTE: Contains Safeguards Information)

SAFEGUARDS INFORMATION (THIS PAGE IS DECONTROLLED IF DETACHED FROM SGI PAGES IN ENCLOSURE)

SAFEGUARDS INFORMATION (THIS PAGE IS DECONTROLLED IF DETACHED FROM SGI PAGES IN ENCLOSURE)

U. S. Nuclear Regulatory Commission Page 3 sl:

Response Letter.doc cc:

Southern Nuclear Operating Company Mr. D. N. Morey, Vice President - Farley (letter only)

Mr. D. E. Grissette, General Manager - Farley (letter only)

U. S. Nuclear Regulatory Commission, Washington, DC Mr. F. Rinaldi, Licensing Project Manager - Farley (letter only)

Document Control Desk (original) (NOTE: Contains Safeguards Information)

U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator (NOTE: Contains Safeguards Information)

Mr. T. P. Johnson, Senior Resident Inspector - Farley (letter only)

SAFEGUARDS INFORMATION (THIS PAGE IS DECONTROLLED IF DETACHED FROM SGI PAGES IN ENCLOSURE)