ML020790008
| ML020790008 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 02/27/2002 |
| From: | Deheen V Energy Northwest |
| To: | Energy Northwest, Office of Nuclear Security and Incident Response |
| References | |
| Download: ML020790008 (4) | |
Text
NORTH WEST INTEROFFICE MEMORANDUM DATE:
February 27, 2002 TO:
Distribution FROM:
Procedure Control, A-WNP-2 (927A)
SUBJECT:
PLANT PROCEDURES MANUAL - VOLUME SWP PACKAGE NO. 2002-109
REFERENCE:
The following Procedure(s) have been revised/approved and are to be inserted in your controlled copy of the Manual and the superseded revisions are to be destroyed:
Procedure SWP-CHE-05 SWP-DOC-01 Rev.
2 2
Title/Comments CHEMICAL CONTROL PROGRAM DOCUMENT CONTROL Also included in this package are EDITORIAL CHANGES, please replace the pages located in your manual with the attached pages:
Procedure SWP-OPS-05 SWP-EPP-01 Pa2e(s) 10 3
To verify receipt or cancellation of the subject Procedure(s), please sign, date and returni thifs receipt to Procedure Control, MD 927A within TEN (10) WORKING DAYS of the date of this IOM.
Energy Northwest Procedure Control (Mail Drop 927A)
PO Box 968 Richland, WA 99352 Signature of Manual Holder Controlled Copy Number ADq5 Date
DISTRIBUTION - SITE WIDE PROCEDURES Control Copy Location 2
- Control Room (IOM to CRS) 3
- Shift Manager 5
Licensed Training 6
- Simulator 12 PEC Library 20 Chemistry Supervisor 25 Bruce Bond 26 Region IV, NRC (SWP-EPP-01 Only) 28 Region IV, NRC (SWP-EPP-01 Only) 30 EOF Support Engineering Library 31
- TSC Emergency Response 35 NRC Resident Inspector (SWP-EPP-01 Only) 52 State of WA, Military Dept. (SWP-EPP-01 Only) 55 Federal Emerg. Mgmt. Agency (SWP-EPP-01 Only) 57 BC Dept. of Emerg. Mgmt. (SWP-EPP-01 Only) 63 Emergency Training (SWP-EPP-01 Only) 64
- Radwaste Control Room 66
- Simulator Shift Manager 75 Dept. of Health Rad Prot. (SWP-EPP-01 Only) 80 GSB Library 87 Document Control Desk, NRC (SWP-EPP-01 Only)
+ + 90
- Joint Information Center (SWP-EPP-01 Only) 114 EP Manager (SWP-EPP-01, SWP-FFD-01 Only) 118 Procedure Development Group 127-130 (4)
Licensed Training 132 Licensed Training 144
- Work Control 146 FEMA RX Liaison (SWP-EPP-01 Only) 155
- Maintenance Library 164 Oregon St. Dept. of Energy (SWP-EPP-01 Only) 215
- Ops Production Center (SWP-MAI-01) 217 WNP-1 Records (SWP-REC-01 Only) 218 U.S. NRC (SWP-EPP-01 Only) 219-221 (3)
Licensed Training 223 Franklin County Emerg. Mgmt. (SWP-EPP-01 Only)
N/A Sharon Grunst (SWP-PRO-01, PRO-02 & PRO-03)
N/A M Avery (OPS PRF & Summary of Changes Only)
N/A Rose Morse (memo only)
N/A Records Processing
+ + Procedure Control assures delivery is arranged/nmade to J.Ittner
- Level 1 File P:\\SWP-DIST (1a 0807/97)
Mail Drop 927A 927A 1027 1027 PEC 927A 911 1050 927A 988C PE30 927A 1027 927A PE30 PE30 901A 1027 1027 927A 927A 927A 817 1027 927A 1022 927A 964Y
DATE: 02/27/02 EDITORIAL SWP-EPP-01
3.0 RESPONSIBILITIES
{R-1582, R-1583, R1604}
3.1 The Plant General Manager (PGM) has overall responsibility for Energy Northwest emergency protective response to nuclear emergencies.
3.2 The Vice President for Operations Support and Public Information Officer has the responsibility and authority to implement Energy Northwest emergency preparedness program for the PGM.
3.3 Appropriate divisional vice presidents have the responsibility to approve assignment of emergency response organization (ERO) members to the ERO.
3.4 Appropriate management has the responsibility to support implementation of corrective actions relative to Columbia Generating Station Emergency Preparedness identified by critique and audit findings.
3.5 The Supervisor, Emergency Preparedness is responsible to identify and administer an ERO that fulfills the commitments and intents of the Columbia Generating Station Emergency Plan. Additionally, the Supervisor, Emergency Preparedness:
Proposes assignment of personnel with appropriate skills to the ERO.
Has overall responsibility for implementation and maintenance of the Emergency Preparedness Training Program.
0 Assigns responsibility for development, implementation, and maintenance of emergency preparedness training materials.
Reviews and approves emergency preparedness training materials.
Ensures program meets required internal and external program and quality requirements, including offsite agency interface.
0 Ensures adverse findings by audit/inspection groups are addressed and resolved.
0 Ensures a review of emergency response personnel qualification status is conducted quarterly.
Maintains and implements a schedule of drills and exercises.
PROCEDURE NUMBER REVISION PAGE SWP-EPP-01 7
3 of 16