ML020780368
| ML020780368 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/07/2002 |
| From: | Dominion Nuclear Connecticut |
| To: | Document Control Desk, NRC/FSME |
| References | |
| Download: ML020780368 (2) | |
Text
To Facility Address
- DOCUMENT CONTROL DESK
- MP Department : 806
- NUC REGULATORY COMMISSION (0140)
DOCUMENT CONTROL DESK WASHINGTON, DC 20555 From
- NDS Date/Time
- 03/07/02 07:53 Trans No.
- 000027724 Tr Total Items: 00001 CONT DOCUMENTS ansmittal Group Id: 02066KA-3 Please check the appropriate response and return form to sender.
All documents received.
Documents noted above not received (identify those not received).
I no longer require distribution of these documents.
Signature:
T1P9XQ2 Item Facility Type Sub Document Number / Title Sheet Revision Doc Date Copy #
Media Copies
01 PREPARATION AND CONTROL OF EMERGENCY PREPAREDNESS PROGRAM CHANGES PASSPORT DOCUMENT TRANSMITTAL Page:
1 1111111 i i 1i Date :
Approval Date Effective Date Document Action Request sP.r o
[-
Initiated By:
Patti Luckey Date 2128102 Department EPD Ext.:
5474 Document No.:
EPD 111 Rev. No.:
003 Minor 01
Title:
Preparation and Control of Emergency Preparedness Progrm Changes For New Documents only -4 El QA RI Title Manager, EPD
[B Reason for RequestlAction (attach commitments, CRs, ARs, OEs etc) 6Rason2n fjo Continued 0 Select one if performing a change (see MP-o*.-seot2.3to de,,,ni, OW ofane) 0 Intent ChangefrecL.soRk vI El Edit Corr.:
Li Non-Intent Change Otterrevwws ma be rered. See MP-5-DCAP 01.1 at 3 (Only Tech IR, SQR IR and Env. signatureR uird)
Editorial Correction Approval TPC Interim Approval (1) Plant Mgmt Staff Member Print/Sign/Date Plant Mgmt Staff Member - Approval (2) SM/SRO/CFH Print/Sign/Date FE Procedure Request/Feedback Disposition Priority:
I Perform Now 0 Perform Later Activity:
i[] Revision E! Minor Revision 0I Cleanup Rev El Biennial Review
[ Cancellation
,Supercedure El TPC n OTC Fl Place in VOID Reviews Print Sign Date SQR Qualified I i continued 0 Irent Yes No Dept.
El E] EO F*lc"*
ýý
[]Eri)*
E
[
kC b El
~I t?&j6
~
S,4
~
4ý M
0 Eb Licensing Basis 0i Tech Independent 01 An NRRL Update Required
[ YES
- 1. 0 SQR Program Final Review and Approval 2 Final Review and Approval En SORC El RI/DH GRet DLsm.vd*,ooks)
Approval J Disapproval 5 DH/*Rl ISign AkdsldIL.
Meeting No S
&enn lReviewer
/ Date Dept Head / Responsiblefidividual SORC Signature DH I RI Signature Approval Date Approval Date Effective Date:
3/ d/o-z_
MP-05-DC-SAPOI-001 Rev. 003-02 Page of
[]
2/13/02 2/14/02