2002 Annual Assessment Meeting Invitation Letter - Millstone
ML020770477
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/08/2002
From: Cowgill C
NRC/RGN-I/DRP/PB6
To: Bassilakis R, Besade J, Christopher Cook, Demarinis N, Eccard P, Fraser W, Hauber D, Hewett E, Juliano V, Peters M, Prague E, Sherrard J, Stillman A, Urban D, Winslow G
- No Known Affiliation, Citizens Awareness Network, Citizens Regulatory Commission, Fish Unlimited, State of CT, Town of Groton, CT, Town of New London, CT, Town of Niantic, CT, Town of Waterford, CT, Town of Waterford, CT, Public Library
References
Download: ML020770477 (15)


Text

March 8, 2002 Vince Juliano Waterford Library 49 Rope Ferry Road Waterford, CT 06385

SUBJECT:

MILLSTONE NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Juliano:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Power in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of the Millstone Nuclear Power Station.

The meeting will be held at 1:30 p.m. on Thursday, March 21, 2002, Millstone Nuclear Power Station, L. F. Sillin Jr. Nuclear Training Center, Simulator Training Building, Rope Ferry Road, Route 156, Waterford, CT, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Dominion our assessment of their safety performance of Millstone and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Millstone Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from April 1, 2001 through December 31, 2001. We described our assessment results in a letter to Dominion on March 4, 2002; a copy of that letter is attached.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Millstone Nuclear Power Station through the NRC Web site. This information may be accessed at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 21, 2002. In the interim, please do not hesitate to contact me at 610-337-5233, if I can be of further assistance to you.

Sincerely,

/RA/

Curtis J. Cowgill, Chief Projects Branch 6 Division of Reactor Projects

Attachment:

As Stated

March 8, 2002 First Selectman Paul Eccard 15 Rope Ferry Road Waterford, CT 06385

SUBJECT:

MILLSTONE NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Eccard:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Power in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of the Millstone Nuclear Power Station.

The meeting will be held at 1:30 p.m. on Thursday, March 21, 2002, Millstone Nuclear Power Station, L. F. Sillin Jr. Nuclear Training Center, Simulator Training Building, Rope Ferry Road, Route 156, Waterford, CT, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Dominion our assessment of their safety performance of Millstone and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Millstone Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from April 1, 2001 through December 31, 2001. We described our assessment results in a letter to Dominion on March 4, 2002; a copy of that letter is attached.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Millstone Nuclear Power Station through the NRC Web site. This information may be accessed at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 21, 2002. In the interim, please do not hesitate to contact me at 610-337-5233, if I can be of further assistance to you.

Sincerely,

/RA/

Curtis J. Cowgill, Chief Projects Branch 6 Division of Reactor Projects

Attachment:

As Stated

March 8, 2002 First Selectman Wayne Fraser P.O. Drawer 519 Niantic, CT 06357

SUBJECT:

MILLSTONE NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Fraser:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Power in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of the Millstone Nuclear Power Station.

The meeting will be held at 1:30 p.m. on Thursday, March 21, 2002, Millstone Nuclear Power Station, L. F. Sillin Jr. Nuclear Training Center, Simulator Training Building, Rope Ferry Road, Route 156, Waterford, CT, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Dominion our assessment of their safety performance of Millstone and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Millstone Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from April 1, 2001 through December 31, 2001. We described our assessment results in a letter to Dominion on March 4, 2002; a copy of that letter is attached.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Millstone Nuclear Power Station through the NRC Web site. This information may be accessed at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 21, 2002. In the interim, please do not hesitate to contact me at 610-337-5233, if I can be of further assistance to you.

Sincerely,

/RA/

Curtis J. Cowgill, Chief Projects Branch 6 Division of Reactor Projects

Attachment:

As Stated

March 8, 2002 The Honorable Dolores Hauber Mayor, Town of Groton 45 Fort Hill Road Groton, CT 06340

SUBJECT:

MILLSTONE NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mayor Hauber:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Power in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of the Millstone Nuclear Power Station.

The meeting will be held at 1:30 p.m. on Thursday, March 21, 2002, Millstone Nuclear Power Station, L. F. Sillin Jr. Nuclear Training Center, Simulator Training Building, Rope Ferry Road, Route 156, Waterford, CT, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Dominion our assessment of their safety performance of Millstone and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Millstone Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from April 1, 2001 through December 31, 2001. We described our assessment results in a letter to Dominion on March 4, 2002; a copy of that letter is attached.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Millstone Nuclear Power Station through the NRC Web site. This information may be accessed at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 21, 2002. In the interim, please do not hesitate to contact me at 610-337-5233, if I can be of further assistance to you.

Sincerely,

/RA/

Curtis J. Cowgill, Chief Projects Branch 6 Division of Reactor Projects

Attachment:

As Stated

March 8, 2002 The Honorable Ernie Hewett Mayor of New London 181 State Street New London, CT 06320

SUBJECT:

MILLSTONE NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mayor Hewett:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Power in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of the Millstone Nuclear Power Station.

The meeting will be held at 1:30 p.m. on Thursday, March 21, 2002, Millstone Nuclear Power Station, L. F. Sillin Jr. Nuclear Training Center, Simulator Training Building, Rope Ferry Road, Route 156, Waterford, CT, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Dominion our assessment of their safety performance of Millstone and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Millstone Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from April 1, 2001 through December 31, 2001. We described our assessment results in a letter to Dominion on March 4, 2002; a copy of that letter is attached.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Millstone Nuclear Power Station through the NRC Web site. This information may be accessed at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 21, 2002. In the interim, please do not hesitate to contact me at 610-337-5233, if I can be of further assistance to you.

Sincerely,

/RA/

Curtis J. Cowgill, Chief Projects Branch 6 Division of Reactor Projects

Attachment:

As Stated

March 8, 2002 The Honorable Catherine W. Cook State Senator 43 Pequot Avenue Mystic, CT 06355

SUBJECT:

MILLSTONE NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. Cook:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Power in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of the Millstone Nuclear Power Station.

The meeting will be held at 1:30 p.m. on Thursday, March 21, 2002, Millstone Nuclear Power Station, L. F. Sillin Jr. Nuclear Training Center, Simulator Training Building, Rope Ferry Road, Route 156, Waterford, CT, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Dominion our assessment of their safety performance of Millstone and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Millstone Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from April 1, 2001 through December 31, 2001. We described our assessment results in a letter to Dominion on March 4, 2002; a copy of that letter is attached.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Millstone Nuclear Power Station through the NRC Web site. This information may be accessed at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 21, 2002. In the interim, please do not hesitate to contact me at 610-337-5233, if I can be of further assistance to you.

Sincerely,

/RA/

Curtis J. Cowgill, Chief Projects Branch 6 Division of Reactor Projects

Attachment:

As Stated

March 8, 2002 The Honorable Nancy DeMarinis State Representative 898 Shennecossett Road Groton, CT 06340

SUBJECT:

MILLSTONE NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. DeMarinis:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Power in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of the Millstone Nuclear Power Station.

The meeting will be held at 1:30 p.m. on Thursday, March 21, 2002, Millstone Nuclear Power Station, L. F. Sillin Jr. Nuclear Training Center, Simulator Training Building, Rope Ferry Road, Route 156, Waterford, CT, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Dominion our assessment of their safety performance of Millstone and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Millstone Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from April 1, 2001 through December 31, 2001. We described our assessment results in a letter to Dominion on March 4, 2002; a copy of that letter is attached.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Millstone Nuclear Power Station through the NRC Web site. This information may be accessed at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 21, 2002. In the interim, please do not hesitate to contact me at 610-337-5233, if I can be of further assistance to you.

Sincerely,

/RA/

Curtis J. Cowgill, Chief Projects Branch 6 Division of Reactor Projects

Attachment:

As Stated

March 8, 2002 The Honorable Melodie Peters State Senator 10 Totoket Road Quaker Hill, CT 06375

SUBJECT:

MILLSTONE NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. Peters:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Power in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of the Millstone Nuclear Power Station.

The meeting will be held at 1:30 p.m. on Thursday, March 21, 2002, Millstone Nuclear Power Station, L. F. Sillin Jr. Nuclear Training Center, Simulator Training Building, Rope Ferry Road, Route 156, Waterford, CT, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Dominion our assessment of their safety performance of Millstone and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Millstone Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from April 1, 2001 through December 31, 2001. We described our assessment results in a letter to Dominion on March 4, 2002; a copy of that letter is attached.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Millstone Nuclear Power Station through the NRC Web site. This information may be accessed at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 21, 2002. In the interim, please do not hesitate to contact me at 610-337-5233, if I can be of further assistance to you.

Sincerely,

/RA/

Curtis J. Cowgill, Chief Projects Branch 6 Division of Reactor Projects

Attachment:

As Stated

March 8, 2002 The Honorable Edith Prague State Senator 145 Route 87 Columbia, CT 06237

SUBJECT:

MILLSTONE NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. Prague:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Power in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of the Millstone Nuclear Power Station.

The meeting will be held at 1:30 p.m. on Thursday, March 21, 2002, Millstone Nuclear Power Station, L. F. Sillin Jr. Nuclear Training Center, Simulator Training Building, Rope Ferry Road, Route 156, Waterford, CT, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Dominion our assessment of their safety performance of Millstone and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Millstone Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from April 1, 2001 through December 31, 2001. We described our assessment results in a letter to Dominion on March 4, 2002; a copy of that letter is attached.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Millstone Nuclear Power Station through the NRC Web site. This information may be accessed at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 21, 2002. In the interim, please do not hesitate to contact me at 610-337-5233, if I can be of further assistance to you.

Sincerely,

/RA/

Curtis J. Cowgill, Chief Projects Branch 6 Division of Reactor Projects

Attachment:

As Stated

March 8, 2002 The Honorable Diana Urban State Representative 146 Babcock Road North Stonington, CT 06359

SUBJECT:

MILLSTONE NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. Urban:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Power in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of the Millstone Nuclear Power Station.

The meeting will be held at 1:30 p.m. on Thursday, March 21, 2002, Millstone Nuclear Power Station, L. F. Sillin Jr. Nuclear Training Center, Simulator Training Building, Rope Ferry Road, Route 156, Waterford, CT, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Dominion our assessment of their safety performance of Millstone and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Millstone Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from April 1, 2001 through December 31, 2001. We described our assessment results in a letter to Dominion on March 4, 2002; a copy of that letter is attached.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Millstone Nuclear Power Station through the NRC Web site. This information may be accessed at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 21, 2002. In the interim, please do not hesitate to contact me at 610-337-5233, if I can be of further assistance to you.

Sincerely,

/RA/

Curtis J. Cowgill, Chief Projects Branch 6 Division of Reactor Projects

Attachment:

As Stated

March 8, 2002 The Honorable Andrea Stillman State Representative 5 Coolidge Court Waterford, CT 06385

SUBJECT:

MILLSTONE NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. Stillman:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Power in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of the Millstone Nuclear Power Station.

The meeting will be held at 1:30 p.m. on Thursday, March 21, 2002, Millstone Nuclear Power Station, L. F. Sillin Jr. Nuclear Training Center, Simulator Training Building, Rope Ferry Road, Route 156, Waterford, CT, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Dominion our assessment of their safety performance of Millstone and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Millstone Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from April 1, 2001 through December 31, 2001. We described our assessment results in a letter to Dominion on March 4, 2002; a copy of that letter is attached.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Millstone Nuclear Power Station through the NRC Web site. This information may be accessed at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 21, 2002. In the interim, please do not hesitate to contact me at 610-337-5233, if I can be of further assistance to you.

Sincerely,

/RA/

Curtis J. Cowgill, Chief Projects Branch 6 Division of Reactor Projects

Attachment:

As Stated

March 8, 2002 Mr. James Sherrard 66 Algonquin Drive Mystic, CT 06355

SUBJECT:

MILLSTONE NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Sherrard:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Power in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of the Millstone Nuclear Power Station.

The meeting will be held at 1:30 p.m. on Thursday, March 21, 2002, Millstone Nuclear Power Station, L. F. Sillin Jr. Nuclear Training Center, Simulator Training Building, Rope Ferry Road, Route 156, Waterford, CT, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Dominion our assessment of their safety performance of Millstone and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Millstone Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from April 1, 2001 through December 31, 2001. We described our assessment results in a letter to Dominion on March 4, 2002; a copy of that letter is attached.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Millstone Nuclear Power Station through the NRC Web site. This information may be accessed at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 21, 2002. In the interim, please do not hesitate to contact me at 610-337-5233, if I can be of further assistance to you.

Sincerely,

/RA/

Curtis J. Cowgill, Chief Projects Branch 6 Division of Reactor Projects

Attachment:

As Stated

March 8, 2002 Rosemary Bassilikas Citizens Awareness Network 54 Old Turnpike Road Haddam, CT 06438

SUBJECT:

MILLSTONE NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. Bassilikas:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Power in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of the Millstone Nuclear Power Station.

The meeting will be held at 1:30 p.m. on Thursday, March 21, 2002, Millstone Nuclear Power Station, L. F. Sillin Jr. Nuclear Training Center, Simulator Training Building, Rope Ferry Road, Route 156, Waterford, CT, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Dominion our assessment of their safety performance of Millstone and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Millstone Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from April 1, 2001 through December 31, 2001. We described our assessment results in a letter to Dominion on March 4, 2002; a copy of that letter is attached.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Millstone Nuclear Power Station through the NRC Web site. This information may be accessed at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 21, 2002. In the interim, please do not hesitate to contact me at 610-337-5233, if I can be of further assistance to you.

Sincerely,

/RA/

Curtis J. Cowgill, Chief Projects Branch 6 Division of Reactor Projects

Attachment:

As Stated

March 8, 2002 Geri Winslow Citizens Regulatory Commission 30 Mullen Hill Rd.

Waterford, CT 06384

SUBJECT:

MILLSTONE NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. Winslow:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Power in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of the Millstone Nuclear Power Station.

The meeting will be held at 1:30 p.m. on Thursday, March 21, 2002, Millstone Nuclear Power Station, L. F. Sillin Jr. Nuclear Training Center, Simulator Training Building, Rope Ferry Road, Route 156, Waterford, CT, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Dominion our assessment of their safety performance of Millstone and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Millstone Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from April 1, 2001 through December 31, 2001. We described our assessment results in a letter to Dominion on March 4, 2002; a copy of that letter is attached.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Millstone Nuclear Power Station through the NRC Web site. This information may be accessed at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 21, 2002. In the interim, please do not hesitate to contact me at 610-337-5233, if I can be of further assistance to you.

Sincerely,

/RA/

Curtis J. Cowgill, Chief Projects Branch 6 Division of Reactor Projects

Attachment:

As Stated

March 8, 2002 J. Besade Fish Unlimited 12 5th Avenue Waterford, CT 06385

SUBJECT:

MILLSTONE NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Besade:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Power in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of the Millstone Nuclear Power Station.

The meeting will be held at 1:30 p.m. on Thursday, March 21, 2002, Millstone Nuclear Power Station, L. F. Sillin Jr. Nuclear Training Center, Simulator Training Building, Rope Ferry Road, Route 156, Waterford, CT, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Dominion our assessment of their safety performance of Millstone and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Millstone Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from April 1, 2001 through December 31, 2001. We described our assessment results in a letter to Dominion on March 4, 2002; a copy of that letter is attached.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Millstone Nuclear Power Station through the NRC Web site. This information may be accessed at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 21, 2002. In the interim, please do not hesitate to contact me at 610-337-5233, if I can be of further assistance to you.

Sincerely,

/RA/

Curtis J. Cowgill, Chief Projects Branch 6 Division of Reactor Projects

Attachment:

As Stated