Kewaunee Nuclear Power Plant N490 Highway 42 Kewaunee, WI 54216-9511 920.388.2560 Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241 920.755.2321 Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC-02-021 March 7, 2002 10 CFR 50.54(w)(2)
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:
Docket 50-305 Operating Licensing DPR-43 Kewaunee Nuclear Power Plant Report on On-Site Property Damage Insurance This letter is sent in accordance with the requirements of 10 CFR 50.54(w)(2) which requires that all licensees report on April 1 of each year to the Commission their present levels of on-site property damage insurance or financial protection.
The amount of on-site primary property damage insurance which joint owners currently maintain with NEIL on the Kewaunee Nuclear Power Plant is $500,000,000.
In addition, we also have NEIL II excess property insurance in the amount of $1,300,000,000.
To our knowledge, this amount of insurance coverage complies with the requirements of 10 CFR 50.54(w)(1).
Thomas Coutu Manager-Kewaunee Plant DSN cc -
NRC Senior Resident Inspector US NRC, Region III Mr. Dave Nalepka, D2 Risk Management Mr. Ira Dinitz, US NRC Committed to Nuclear Excellence