ML020740404
| ML020740404 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 03/05/2002 |
| From: | Gallagher M AmerGen Energy Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 5928-02-20036, TS 4.19.5.b TR-151, Rev 0 | |
| Download: ML020740404 (2) | |
Text
AmerGen.
AmerGen Energy Company, LLC Telephone: 717 944-7621 An Exelon/British Energy Company Three Mile Island Unit i Route 441 South, P.O. Box 480 Middletown, PA 17057 March 5, 2002 5928-02-20036 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Subject:
Three Mile Island, Unit 1 (TMI Unit 1)
Facility Operating License No. DPR-50 NRC Docket No. 50-289 Cycle 14 Refueling (T1 R14) Inservice Inspection (IS1)
Summary Report Submittal of the Owner's Data Reports for Inservice Inspections is required by the American Society of Mechanical Engineers (ASME) Code,Section XI., "NIS-1 Owner's Data Report for Inservice Inspections," covers the 1 R1 4 OTSG examinations and other ISI examinations conducted between December 21, 1999 and December 6, 2001. The report includes the Second Ten Year ISI Interval examinations performed in accordance with the 1986 Code Edition with no addenda, augmented examinations of the reactor vessel shell welds in accordance with the 1989 Code Edition and Third ISI Interval examinations in accordance with the ASME Code,Section XI, 1995 Edition with addenda through 1996. to Enclosure 1, Topical Report (TR) No. 151, "Report on the 2001 Outage 1 R14 Eddy Current Examinations of the TMI-1 OTSG Tubing," provides the results from the OTSG tube inservice inspections (ISI) in accordance with Technical Specification 4.19.5.b., "Form NIS-2 Owner's Report for Repairs or Replacements,"
includes the NIS-2 Forms covering repairs or replacements where documentation was completed between December 21, 1999 and March 6, 2002. NIS-2 Reports completed after March 6, 2002 will be included with our next submittal following the Cycle 15 Refueling Outage (T1 R15).
Results from containment examinations performed in accordance with ASME Section Xl, Subsection IWE are included in this submittal. No containment IC
March 5, 2002 5928-02-20036 Page 2 of 2 examinations in accordance with Subsection IWL have been performed since our last submittal.
Respectfully, Michael P. Gallagher Director - Licensing and Regulatory Affairs Enclosures cc: H. J. Miller, USNRC, Regional Administrator, Region I T. G. Colburn, USNRC, Senior Project Manager, TMI Unit I J. D. Orr, USNRC, Senior NRC Resident Inspector, TMI Barry K. Bobo, Hartford Steam Boiler I&I Co. of CT File No. 02032