ML020700447

From kanterella
Jump to navigation Jump to search
Transmittal of Emergency Planning Facility Manual and Drill and Exercise Manual
ML020700447
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 02/14/2002
From:
Northeast Nuclear Energy Co (NNECO)
To:
Document Control Desk, NRC/FSME
References
Download: ML020700447 (3)


Text

TIPCKf To DOCUMENT CONTROL DESK Facility MP Department

806 TRANSMITTAL Address
NUC REGULATORY COMMISSION (0140)

DOCUMENT CONTROL DESK WASHINGTON, DC 20555 Page:

1 From

NDS CONT DOCUMENTS i i ilte Date/Time
02/28/02 11:37 Trans No.
000027457 Transmittal Group Id: 02059KA-6 Total Items: 00002 Item Facility Type Sub Document Number/ Title Sheet Revision Doc Date Copy #

Media Copies

  • 0001 MP PROC EP EPDI 06 003 01 P

01 EMERGENCY PLANNING FACILITY MANUAL

  • 0002 MP PROC EP EPDI 07 008 01 P

01 DRILL AND EXERCISE MANUAL Marked (*) documents require your acknowledgement.

Acknowledgement Date :

Signature:

Please check the appropriate response and return form to sender.

All documents received.

I Documents noted above not received (identify those not received).

I no longer require distribution of these documents.

Date:

Signature:

PASSPORT DOCUMENT

Approval Date Effective Date Document Action Request sPG#

020206-122355

[A Initiated By:

Tom Rigney Date 2/5102 Department EPD Ext.:

6586 Document No.:

EPDI 07 Rev. No.:

008 Minor 01

Title:

Drill and Exercise Manual For New Documents only - [] QA RI Title Manager, EPD

[ ]

Reason for Request/Action (attach commitments, CRs, ARs, OEs etc)

Superceded by MP-26-MMM program Continued 0 Select one if performing a change (See MP-OS-C-SAPO1 sec 2.3 to detennine type of change)

Z Intent Change(reotsoRw,,e, RcaE. seaeo El Edit Corr.:

E Non-Intent Change Oerreviews may be re*,e. See UP-05-DC-FAP 01.1 all 3 (Onfy Tech IR, SQR IR and Env. signature Required)

Editorial Correction Approval TPC Interim Approval (1) Plant Mgmt Staff Member Print/Sign/Date Plant Mgmt Staff Member - Approval (2) SM/SRO/CFH Print/Sign/Date E

Procedure Request/Feedback Disposition Priority:

S Perform Now 0] Perform Later Activity:

l DRevision DE Minor Revision

[]Cleanup Rev 0 Biennial Review I Cancellation

[I Supercedure C

l...e..

V.......................

[]TPC n] OTC n] Place in VOID Reviews Print Sign Date SQR Qualified

. I continued 0 r,____

Yes No Dept.

E]

[] E RCD

[@

Kathleen Burgess

_[D

[

[]

EPD Licensing Basis

[]

Tech Independent

[

An NRRL Update Required

[ YES

1. E SQR Program Final Review and Approval 2 Final Review and Approval El SORC El RIIDH (ReuansGo*s, Handbooks)

Approval [

Disapproval E_

DH / RI Sign A.A.l02-Meeting No e.ent Reviewer/Date Dept He;d eRefpo T Individual SORC Signature DH / RI Signature Approval Date Approval Date Effective Date: 2 b /C/ Z_

MP-05-DC-SAPO1-001 Rev. 003-02 Page__

of F, I 2/13/02 2/14/02

Approval Date Effective Date IDocument Action Request isPG#

020206-151035 Initiated By:

Tom Dembek Date 215102 Department EPD Ext.:

4223 Document No.:

EPDI 06 Rev. No.:

0 Minor -00 Tilie: Emergency Planning Facility Manual For New Documents only -- [IQA RI Title Manager, EPD Reason for Request/Action (attach commitments, CRs, ARs, OEs etc)

Superceded by MP-26-EPA-FAP05 Continued ]

Select one if performing a change (See MP-o5-Dc-SAi sed 2.3 to determine type of change) 10 Intent Change msRks Rwvss=ReuLt El Edit Corr.:

I-Non-Intent Change Odwenwevte*ma beerd SeeP.-OS.C-FAPO.fa A3 (Only Tech IR, SQR IR and Env. 4nature Required)

Editorial Correction Approval TPC Interim Approval (1) Plant Mgmt Staff Member Print/Sign/Date Plant Mgmt Staff Member -Approval (2) SMISRO/CFH Print/Sign/Date Procedure Request/Feedback Disposition Priority:

0 Perform Now 0 Perform Later Activity:

El Revision El Minor Revision E] Cleanup Rev

[E Biennial Review

[ Cancellation El Supercedure S......................

]

T'PC

[

OTC El Place in VOID Reviews Print Sign Date SQR Qualified I K continued

  • eft Yes No Dept.

E]

E3 IJ E

RCD 0

Kathleen Burgess

[0.

E]r EPD Licensing Basis

[]

E_

Tech independent

[

Kathleen Burgess EPD An NRRL Update Required 0 YES

1. 0 SQR Program Final Review and Approval 2 Final Review and Approval El SORC E] 1RIIDH (was cots. Hadbooks)

Approval [

Disapproval E]

DH / Rl Sign

,j 4* 0 Z.__

Meeting No ent eviewerI Date Dept Head

  • Resensible Individual SORC Signature DH I RI Signature

],;A),&ro ?-

Approval Date Approval Date Effective Date: 2 /1/o0-z-MP-05-DC-SAP01-001 Rev. 003-02 Page of I]l 2/13/02 2/14/02