ML020670241
| ML020670241 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point (DPR-031, DPR-041) |
| Issue date: | 03/04/2002 |
| From: | Son Ninh Division Reactor Projects II |
| To: | Stall J Florida Power & Light Co |
| References | |
| Download: ML020670241 (2) | |
Text
Turkey Point Inspection / Activity Plan 03/01/2002 - 03/31/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/04/2002 14:26:42 Report 22 1
EB2-ISI
- INSERVICE INSPECTION Baseline Inspections 04/01/2002 04/05/2002 Inservice Inspection Activities IP 7111108 4
1 PB3-AWP
- ADVERSE WEATHER INSPECTION Baseline Inspections 06/24/2002 06/28/2002 Adverse Weather Protection IP 7111101 3, 4 1
PB3-PI&R
- FLOOD PROTECTION INSPECTION Baseline Inspections 06/24/2002 06/28/2002 Flood Protection Measures IP 7111106 3, 4 2
PB3-PI&R
- PI&R INSPECTION Baseline Inspections 08/05/2002 08/09/2002 Identification and Resolution of Problems IP 71152B 3, 4 3
PB3-PI&R
- PI&R INSPECTION Baseline Inspections 08/19/2002 08/23/2002 Identification and Resolution of Problems IP 71152B 3, 4 1
PS-SEC
- SECURITY Baseline Inspections 09/09/2002 09/13/2002 Access Authorization Program (Behavior Observation Only)
IP 7113001 3, 4 Baseline Inspections 09/09/2002 09/13/2002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)
IP 7113002 3, 4 Baseline Inspections 09/09/2002 09/13/2002 Performance Indicator Verification IP 71151 3, 4 3
OL-PREP
- INITIAL EXAM PREP Not Applicable 09/16/2002 09/20/2002 TURKEY POINT/EXAMS AT POWER REACTOR V23185 3
1 EB1-SSDI
- SSDI - PRE-INSPECTION VISIT Baseline Inspections 09/23/2002 09/27/2002 Safety System Design and Performance Capability IP 7111121 3, 4 3
OL EXAM
- INITIAL EXAM Not Applicable 10/07/2002 10/18/2002 TURKEY POINT/EXAMS AT POWER REACTOR V23185 3
5 EB1-SSDI
- SSDI - INSPECTION Baseline Inspections 10/28/2002 11/01/2002 Safety System Design and Performance Capability IP 7111121 3, 4 5
EB1-SSDI
- SSDI - INSPECTION Baseline Inspections 11/18/2002 11/22/2002 Safety System Design and Performance Capability IP 7111121 3, 4 1
PS-RP
- RADIATION PROTECTION Baseline Inspections 12/02/2002 12/06/2002 Access Control to Radiologically Significant Areas IP 7112101 3, 4 Baseline Inspections 12/02/2002 12/06/2002 Performance Indicator Verification IP 71151 3, 4 3
EB2-MODS - MODS & 50.59 INSPECTION Baseline Inspections 01/13/2003 01/17/2003 Evaluation of Changes, Tests, or Experiments IP 7111102 3, 4 Baseline Inspections 01/13/2003 01/17/2003 Permanent Plant Modifications IP 7111117B 3, 4 2
OL-EP
- EMERGENCY EXERCISE Baseline Inspections 02/17/2003 02/21/2003 Exercise Evaluation IP 7111401 3, 4 Baseline Inspections 02/17/2003 02/21/2003 Emergency Action Level and Emergency Plan Changes IP 7111404 3, 4 Baseline Inspections 02/17/2003 02/21/2003 Performance Indicator Verification IP 71151 3, 4 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Turkey Point Inspection / Activity Plan 03/01/2002 - 03/31/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/04/2002 14:26:42 Report 22 1
EB2-ISI
- INSERVICE INSPECTION Baseline Inspections 03/10/2003 03/14/2003 Inservice Inspection Activities IP 7111108 3
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.