ML020670071

From kanterella
Jump to navigation Jump to search
Senior Reactor Operator Initial Examinations Virgil C. Summer Nuclear Station - 50-395/2002-301
ML020670071
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/06/2002
From: Ernstes M
Operator Licensing and Human Performance Branch
To: Byrne S
South Carolina Electric & Gas Co
References
50-395/02-301
Download: ML020670071 (4)


See also: IR 05000395/2002301

Text

March 6, 2002

South Carolina Electric & Gas Company

ATTN: Mr. Steve A. Byrne

Vice President, Nuclear Operations

Virgil C. Summer Nuclear Station

P. O. Box 88

Jenkinsville, SC 29065

SUBJECT:

SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS

VIRGIL C. SUMMER NUCLEAR STATION - 50-395/2002-301

Dear Mr. Byrne:

In a telephone conversation on February 27, 2002, between Mr. Al Koon, Supervisor Nuclear

Operations Training, and Mr. Steven D. Rose, Operations Engineer, arrangements were made

for the administration of licensing examinations at Virgil C. Summer Nuclear Station during the

weeks of September 9, 2002 (operating test) and September 16, 2002 (written examination).

The NRC will prepare the examinations based on the guidelines in Revision 8, Supplement 1, of

NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." Your staff will

be given the opportunity to review the examinations during the week of July 29, 2002. The

facility has agreed to fill in the scenario details (ES-D-2) and the details of the JPMs. The

facility has also agreed to make all of the copies of the examination prior to administration.

To meet the above schedule, it will be necessary for your staff to furnish the reference materials

identified in Attachment 2 of ES-201 by March 18, 2002. Any delay in receiving the required

reference materials, or the submittal of inadequate or incomplete materials, may cause the

examination to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examination is being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary senior reactor

operator license applications (Office of Management and Budget (OMB) approval number 3150-

0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)

(OMB approval number 3150-0090) at least 30 days before the examination date. If the

applications are not received at least 30 days before the examination date, a postponement

SCE&G

2

may be necessary. Signed applications certifying that all training has been completed should

be submitted at least 14 days before the examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number 3150-0018, which expires on April 30, 2003. The

public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per

response, including the time for reviewing instructions, gathering and maintaining the data

needed, and completing and reviewing the collection of information. Send comments on any

aspect of this collection of information, including suggestions for reducing the burden, to the

Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the

Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of

Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Al Koon has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Steven D. Rose at (404) 562-4609, (Internet E-mail:

(SDR2)@NRC.GOV), Lee R. Miller at (404) 562-4676, (Internet E-mail: (LRM2)@NRC.GOV),

or myself at (404) 562-4638, (Internet E-mail: MEE@NRC.GOV).

Sincerely,

/RA/

Michael E. Ernstes, Chief

Operator Licensing and

Human Performance Branch

Division of Reactor Safety

Docket No. 50-395

License No. NPF-12

cc: (See page 3)

SCE&G

3

cc contd:

R. J. White

Nuclear Coordinator Mail Code 802

S.C. Public Service Authority

Virgil C. Summer Nuclear Station

Electronic Mail Distribution

Kathryn M. Sutton, Esq.

Winston and Strawn

Electronic Mail Distribution

Henry J. Porter, Director

Div. of Radioactive Waste Mgmt.

Dept. of Health and Environmental

Control

Electronic Mail Distribution

R. Mike Gandy

Division of Radioactive Waste Mgmt.

S. C. Department of Health and

Environmental Control

Electronic Mail Distribution

Gregory H. Halnon, General Manager

Nuclear Plant Operations (Mail Code 303)

South Carolina Electric & Gas Company

Virgil C. Summer Nuclear Station

Electronic Mail Distribution

Melvin N. Browne, Manager

Nuclear Licensing & Operating

Experience (Mail Code 830)

Virgil C. Summer Nuclear Station

Electronic Mail Distribution

Steve Furstenburg, Training Manager

Virgil C. Summer Nuclear Station

P. O. Box 88 (Mail Code P-40)

Jenkinsville, SC 29065

SCE&G

4

Distribution w/encl:

K. Cotton, NRR

C. Evans (Part 72 Only)

RIDSNRRDIPMLIPB

PUBLIC

OFFICE

RII:DRS

RII:DRS

RII:DRS

RII:DRP

SIGNATURE

/RA/

/RA/

/RA/

/RA/

NAME

SRose

LMiller

MErnstes

KLandis

DATE

2/28/2002

2/ 8/2002

3/5/2002

3/6/2002

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

OFFICIAL RECORD COPY DOCUMENT NAME: C:\\Program Files\\Adobe\\Acrobat 4.0\\PDF Output\\120day letter(SDR).wpd