ML020660429
| ML020660429 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 02/28/2002 |
| From: | Tennessee Valley Authority |
| To: | NRC/RGN-II |
| Shared Package | |
| ML020660410 | List: |
| References | |
| IR-02-001 | |
| Download: ML020660429 (2) | |
Text
Browns Ferry Inspection / Activity Plan 03/04/2002 - 03/31/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 02/28/2002 14:18:07 Report 22 1
EB2-ISI
- INSERVICE INSPECTION Baseline Inspections 03/28/2002 04/01/2002 Inservice Inspection Activities IP 7111108 3
1 OL-EP
- EMERGENCY PLANNING INSPECTION Baseline Inspections 04/15/2002 04/19/2002 Alert and Notification System Testing IP 7111402 1, 2, 3 Baseline Inspections 04/15/2002 04/19/2002 Emergency Response Organization Augmentation Testing IP 7111403 1, 2, 3 Baseline Inspections 04/15/2002 04/19/2002 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2, 3 Baseline Inspections 04/15/2002 04/19/2002 Performance Indicator Verification IP 71151 1, 2, 3 1
EB2-HS
- HEAT SINK Baseline Inspections 07/08/2002 07/12/2002 Heat Sink Performance IP 7111107B 1, 2, 3 1
PS-SEC
- SECURITY Baseline Inspections 07/08/2002 07/12/2002 Access Authorization Program (Behavior Observation Only)
IP 7113001 1, 2, 3 Baseline Inspections 07/08/2002 07/12/2002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)
IP 7113002 1, 2, 3 Baseline Inspections 07/08/2002 07/12/2002 Performance Indicator Verification IP 71151 1, 2, 3 1
PS-RP
- RADIATION PROTECTION Baseline Inspections 07/10/2002 07/12/2002 Radiological Environmental Monitoring Program IP 7112203 1, 2, 3 3
PS-RP
- RADIATION PROTECTION Baseline Inspections 07/22/2002 07/26/2002 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 Baseline Inspections 07/22/2002 07/26/2002 Radiation Monitoring Instrumentation IP 7112103 1, 2, 3 Baseline Inspections 07/22/2002 07/26/2002 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2, 3 Baseline Inspections 07/22/2002 07/26/2002 Radiological Environmental Monitoring Program IP 7112203 1, 2, 3 Baseline Inspections 07/22/2002 07/26/2002 Performance Indicator Verification IP 71151 1, 2, 3 1
EB1-SSDI
- SSDI - PRE-INSPECTION VISIT Baseline Inspections 09/30/2002 10/04/2002 Safety System Design and Performance Capability IP 7111121 1, 2, 3 1
PB6LAYUP
- UNIT 1 SYSTEM LAYUP Other Routine 10/07/2002 10/11/2002 Review Of Quality Assurance For Extended Construction Delays IP 92050 1
5 EB1-SSDI
- SSDI - INSPECTION Baseline Inspections 12/09/2002 12/13/2002 Safety System Design and Performance Capability IP 7111121 1, 2, 3 2
OL-EXAM
- INITIAL EXAM Not Applicable 12/16/2002 12/20/2002 BROWNS FERRY/EXAMS AT POWER FACILITIES V23184 1
5 EB1-SSDI
- SSDI - INSPECTION Baseline Inspections 01/13/2003 01/17/2003 Safety System Design and Performance Capability IP 7111121 1, 2, 3 1
PS-SEC
- SECURITY Baseline Inspections 02/10/2003 02/14/2003 Access Authorization Program (Behavior Observation Only)
IP 7113001 1, 2, 3 Baseline Inspections 02/10/2003 02/14/2003 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)
IP 7113002 1, 2, 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Browns Ferry Inspection / Activity Plan 03/04/2002 - 03/31/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 02/28/2002 14:18:07 Report 22 1
PS-SEC
- SECURITY Baseline Inspections 02/10/2003 02/14/2003 Performance Indicator Verification IP 71151 1, 2, 3 3
PS-RP
- RADIATION PROTECTION Baseline Inspections 02/24/2003 02/28/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 Baseline Inspections 02/24/2003 02/28/2003 ALARA Planning and Controls IP 7112102 1, 2, 3 Baseline Inspections 02/24/2003 02/28/2003 Radioactive Material Processing and Transportation IP 7112202 1, 2, 3 Baseline Inspections 02/24/2003 02/28/2003 Performance Indicator Verification IP 71151 1, 2, 3 1
EB2-ISI
- INSERVICE INSPECTION Baseline Inspections 03/03/2003 03/07/2003 Inservice Inspection Activities IP 7111108 2
3 PS-RP
- RADIATION PROTECTION Baseline Inspections 03/10/2003 03/14/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 Baseline Inspections 03/10/2003 03/14/2003 ALARA Planning and Controls IP 7112102 1, 2, 3 Baseline Inspections 03/10/2003 03/14/2003 Radioactive Material Processing and Transportation IP 7112202 1, 2, 3 Baseline Inspections 03/10/2003 03/14/2003 Performance Indicator Verification IP 71151 1, 2, 3 1
PB6-FP
- FLOOD PROTECTION Baseline Inspections 03/24/2003 03/28/2003 Flood Protection Measures IP 7111106 1, 2, 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.