ML020650735

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan 03/01/02 - 03/31/03
ML020650735
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/04/2002
From:
NRC Region 1
To:
Virginia Electric & Power Co (VEPCO)
Shared Package
ML020650701 List:
References
Download: ML020650735 (2)


Text

Page 1 of 2 Surry 03/04/2002 13:09:02 Inspection / Activity Plan Report 22 03/01/2002 - 03/31/2003 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL PREP - INITIAL EXAM PREP 3 1 V23181 SURRY/EXAMS AT POWER FACILITIES 03/04/2002 03/08/2002 Not Applicable OL EXAM - INITIAL EXAM 3 1 V23181 SURRY/EXAMS AT POWER FACILITIES 03/18/2002 03/29/2002 Not Applicable EB1-SSDI - SSDI - PRE-INSPECTION VISIT 2 1, 2 IP 7111121 Safety System Design and Performance Capability 03/25/2002 03/29/2002 Baseline Inspections EB2 ISI - ISI 1 2 IP 7111108 Inservice Inspection Activities 04/01/2002 04/05/2002 Baseline Inspections LIC REN - CONTAINMENT INSP FOR LICENSE RENEWAL 1 2 IP 71002 License Renewal Inspection 04/01/2002 04/05/2002 Other Routine 95001 - 95001 SUPPLEMENTAL INSPECTION EDG ISSUES 1 1, 2 IP 95001 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 04/08/2002 04/12/2002 Supplemental Program S/G ISI - EB2 S/G ISI 1 2 IP 7111108 Inservice Inspection Activities 04/15/2002 04/19/2002 Baseline Inspections BR5-FLD - FLOOD PROTECTION INSPECTION 1 1, 2 IP 7111106 Flood Protection Measures 05/06/2002 05/10/2002 Baseline Inspections MB LR - VEPCO LR 4 1, 2 IP 71002 License Renewal Inspection 05/13/2002 05/17/2002 Other Routine EB2-MR - EB2-MR 1 1, 2 IP 7111112B Maintenance Rule Implementation 06/03/2002 06/07/2002 Baseline Inspections EB1-SSDI - SSDI - INSPECTION 5 1, 2 IP 7111121 Safety System Design and Performance Capability 06/10/2002 06/14/2002 Baseline Inspections EB1-SSDI - SSDI - INSPECTION 5 1, 2 IP 7111121 Safety System Design and Performance Capability 06/24/2002 06/28/2002 Baseline Inspections OL EP - EMERGENCY INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 07/29/2002 08/02/2002 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 07/29/2002 08/02/2002 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/29/2002 08/02/2002 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 07/29/2002 08/02/2002 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 07/29/2002 08/02/2002 Baseline Inspections PS-RP - RADIATION PROTECTION 3 1, 2 IP 7112103 Radiation Monitoring Instrumentation 08/19/2002 08/23/2002 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 08/19/2002 08/23/2002 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program 08/19/2002 08/23/2002 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Surry 03/04/2002 13:09:02 Inspection / Activity Plan Report 22 03/01/2002 - 03/31/2003 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS-SEC - SECURITY 1 1, 2 IP 7113001 Access Authorization Program (Behavior Observation Only) 09/09/2002 09/13/2002 Baseline Inspections 1, 2 IP 7113002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization) 09/09/2002 09/13/2002 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/09/2002 09/13/2002 Baseline Inspections ISFSI - EB2 ISFSI 1 1, 2 IP 60855 Operation Of An ISFSI 11/12/2002 11/15/2002 Other Routine PS-RP - RADIATION PROTECTION 1 1, 2 IP 60855 Operation Of An ISFSI 11/18/2002 11/22/2002 Other Routine 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 11/18/2002 11/22/2002 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 11/18/2002 11/22/2002 Baseline Inspections EB1-FP - FP - PRE-INSPECTION VISIT 5 1 IP 7111105T Fire Protection 01/06/2003 01/10/2003 Baseline Inspections EB1-FP - FP - INSPECTION 4 1, 2 IP 7111105T Fire Protection 01/27/2003 01/31/2003 Baseline Inspections EB1-FP - FP - INSPECTION 4 1, 2 IP 7111105T Fire Protection 02/10/2003 02/14/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.