ML020650683
| ML020650683 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 03/04/2002 |
| From: | NRC Region 1 |
| To: | South Carolina Electric & Gas Co |
| Shared Package | |
| ML020650634 | List: |
| References | |
| Download: ML020650683 (2) | |
Text
Summer Inspection / Activity Plan 03/01/2002 - 03/31/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/04/2002 13:10:47 Report 22 5
RP1-PI&R
- PROBLEM IDENTIFICAITON & RESOLUTION Baseline Inspections 02/25/2002 03/01/2002 Identification and Resolution of Problems IP 71152 1
2 RP-SEC
- SECURITY Baseline Inspections 04/15/2002 04/19/2002 Access Authorization Program (Behavior Observation Only)
Baseline Inspections 04/15/2002 04/19/2002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)
Baseline Inspections 04/15/2002 04/19/2002 Performance Indicator Verification IP 71151 1
1 2515/145
- TI 2515/145 RE: BULLETIN 01-01 Safety Issues 04/19/2002 04/25/2002 Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles (NRC Bulletin 2001-01)
3 PS-RP
- RADIATION PROTECTION Baseline Inspections 04/22/2002 04/26/2002 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 04/22/2002 04/26/2002 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 04/22/2002 04/26/2002 Radioactive Material Processing and Transportation IP 7112202 1
Baseline Inspections 04/22/2002 04/26/2002 Performance Indicator Verification IP 71151 1
1 EB2 ISI
- ISI Baseline Inspections 04/29/2002 05/03/2002 Inservice Inspection Activities IP 7111108 1
3 PS-RP
- RADIATION PROTECTION Baseline Inspections 05/06/2002 05/10/2002 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 05/06/2002 05/10/2002 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 05/06/2002 05/10/2002 Radioactive Material Processing and Transportation IP 7112202 1
Baseline Inspections 05/06/2002 05/10/2002 Performance Indicator Verification IP 71151 1
1 BR5-FLD
- FLOOD PROTECTION INSPECTION Baseline Inspections 06/17/2002 06/21/2002 Flood Protection Measures IP 7111106 1
- EMERGENCY INSPECTION Baseline Inspections 08/06/2002 08/10/2002 Alert and Notification System Testing IP 7111402 1
Baseline Inspections 08/06/2002 08/10/2002 Emergency Response Organization Augmentation Testing IP 7111403 1
Baseline Inspections 08/06/2002 08/10/2002 Emergency Action Level and Emergency Plan Changes IP 7111404 1
Baseline Inspections 08/06/2002 08/10/2002 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1
Baseline Inspections 08/06/2002 08/10/2002 Performance Indicator Verification IP 71151 1
1 EB1-SSDI
- SSDI - PRE-INSPECTION VISIT Baseline Inspections 08/19/2002 08/23/2002 Safety System Design and Performance Capability IP 7111121 1
2 OL PREP
- INITIAL EXAM PREP Not Applicable 08/19/2002 08/23/2002 SUMMER/EXAMS AT POWER FACILITIES V23190 1
2 OL EXAM
- INITIAL EXAM Not Applicable 09/09/2002 09/13/2002 SUMMER/EXAMS AT POWER FACILITIES V23190 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Summer Inspection / Activity Plan 03/01/2002 - 03/31/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/04/2002 13:10:47 Report 22 5
EB1-SSDI
- SSDI - INSPECTION Baseline Inspections 09/23/2002 09/27/2002 Safety System Design and Performance Capability IP 7111121 1
5 EB1-SSDI
- SSDI - INSPECTION Baseline Inspections 10/07/2002 10/11/2002 Safety System Design and Performance Capability IP 7111121 1
1 EB2-MR
- EB2-MR Baseline Inspections 11/18/2002 11/22/2002 Maintenance Rule Implementation IP 7111112B 1
1 PS-SEC
- SECURITY Baseline Inspections 01/06/2003 01/10/2003 Access Authorization Program (Behavior Observation Only)
Baseline Inspections 01/06/2003 01/10/2003 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)
Baseline Inspections 01/06/2003 01/10/2003 Performance Indicator Verification IP 71151 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.