ML020650457
| ML020650457 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 02/15/2002 |
| From: | Faggert P Dominion Virginia Power |
| To: | Darton T Office of Nuclear Reactor Regulation, State of VA |
| References | |
| Download: ML020650457 (12) | |
Text
Pamelia F. Faggcrt
~D m no 0
Dominion Vice President and Chief Environ1entdl Officer 5000 Dominion Boulevard. Glen Allen. VA 23060 Phone: 804-273-3467 CERTIFIED MAIL February 15, 2002 Mr. Terry H. Darton Air Permit Manager DEQ - Fredericksburg Satellite Office 806 Westwood Office Park Fredericksburg, VA 22401 RE: Converting North Anna Power Station's Exclusionary General Permit to a State Operating Permit
Dear Mr. Darton:
This letter is in response to your letter dated January 29, 2002 requesting either a State Operating Permit (SOP) Application by February 7, 2002 or Title V Permit Application by June 30, 2002 for the North Anna Power Station (Registration Number 40726). The deadline for the SOP was extended to February 15, 2002 in an e-mail from Mr. Dean Gossett of your office to Mr. Andy Gates of Dominion.
Dominion is applying for a SOP for the North Anna Power Station. In order to obtain a SOP, Dominion proposes to limit the hours of operation of the auxiliary boilers and emergency generators to keep the facility-wide nitrogen oxide (NO,) emissions below the major source threshold of 100 tpy. All other criteria pollutants are below NO. emission levels.
To maintain operational flexibility, Dominion proposes to limit the hours of each of three groups of equipment. In other words, Dominion would prefer to have an emission limit "bubble" for each group of emission units rather than a specific hourly limit for each unit. A precedent for this approach exists with Dominion's Possum Point facility in which two combustion turbines were recently given an annual limit for the total hours of operation for both turbines. The proposed annual limits are as follows:
ES-1 Auxiliary Boiler 4A &
ES-2 Auxiliary Boiler 4B 500 Hours Total Combined ES-3 Blackout Generator 500 Hours Total ES-4 Emergency Diesel Generator ES-5 Emergency Diesel Generator ES-6 Emergency Diesel Generator ES-7 Emergency Diesel Generator 1,000 Hours Total Combined co i
Mr. Terry H. Darton February 15, 2002 Page 2 All other emission units at the North Anna Power Station are exempt from air permitting according to 9 VAC 5-80-720. Attachment A contains an emissions summary for the proposed annual limits for ES-I through ES-7. Attachment B contains the SOP Application Form 7. If you have any questions or desire additional information, please call Andy Gates at (804) 273 2950.
Sincerely, Pamela F. Faggert cc:
U. S. Nuclear Regulatory Commission Region I1 Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 Docket Nos. 50-338/50-339 License Nos. NPF-4/NPF-7 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Docket Nos. 50-338/50-339 License Nos. NPF-4/NPF-7 Mr. M.J. Morgan NRC Senior Resident Inspector North Anna Power Station
ATTACHMENT A North Anna Power Station Auxiliary Boiler I Emergency Generator Emissions Summary
- Pound per hour emission rates are based on AP-42 emission factors.
- Based on hourly limits in permit dated October 20, 1993, as amended.
ATTACHMENT B
COMMONWEALTH OF VIRGINIA Department of Environmental Quality AIR PERMIT APPLICATION General information CHECK ALL FORMS THAT APPLY AND LIST ALL ATTACHED DOCUMENTS.
MAP AND LOCALITIES LIST (information), Pages iii-iv CONFIDENTIAL INFORMATION, Page v FORMULA-BASED HAZARDOUS AIR POLLUTANT INFORMATION, Page vi HAZARDOUS AIR POLLUTANT LIST (informationi, Pages vii-viii
_ REQUEST FOR LOCAL GOVERNMENT CERTIFICATION FORM, Page Ix "1
CONTENTS AND DOCUMENT CERTIFICATION, Page 1 1 GENERAL INFORMATION, Page 2 1 GENERAL INFORMATION [continued), Page 3 1 FUEL.BURNING EQUIPMENT, Page 4
-- PROCESSING, Page 5 INKS, COATINGS, STAINS, AND ADHESIVES, Page 6 INCINERATORS, Page 7
- VOLATILE ORGANIC COMPOUND/PETROLEUM STORAGE TANKS, Page 8
-VOLATILE ORGANIC COMPOUND/PETROLEUM STORAGE TANKS CONTINUED, Page 9
-- LOADING RACKS AND OIL-WATER SEPARATORS, Page 10 1 STACK PARAMETERS AND FUEL DATA, Page 11 AIR POLLUTION CONTROL AND MONITORING EQUIPMENT.
PAGE 12
_-AIR POLLUTION CONTROL/SUPPLEMENTAL INFORMATION, PAGE 13 1 CRITERIA POLLUTANT EMISSIONS, Page 14 TOXIC OR HAP OR OTHER EMISSIONS, Page 15 1 OPERATING PERIODS, Page 16 LIST ATTACHED DOCUMENTS MAP
-FACILITY SITE PLAN -
PROCESS FLOW DIAGRAM/SCHEMATIC MSDS SHEETS 1 ESTIMATED EMISSIONS
SUMMARY
__ STACK TESTS AIR MODEL DATA _ LOCAL GOVERNING BODY CERTIFICATION FORM Note added form sheets above; also indicate the number of copies of each form in blank provided.
DOCUMENT CERTIFICATION FORM (see other side for instructions) certify under penalty of law that this document and all attachments [as noted above] were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering and evaluating the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
SIGNATURE:
NAME:
TITLE:
COMPANY:
D. A. Heacock Site Vice President Virginia Electric and Power Company REGISTRATION NUMBER:
40726
References:
Virginia Regulations, 9 VAC 5-80-10.D.4. See reverse of this form for instructions.
I1 DATE:
d1__ %.*-5 *.
COMMONWEALTH OF VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY AIR PERMIT APPLICATION GENERAL INFORMATION PERSON COMPLETING FORM DEGTINM C. C. Taylor, Director - Electric Environmental Services 02115/2002 40726 REASON(S)
FOR SUBMISSION:
0 OPERATING PERMIT
[] RENEWAL OF OPERATING PERMIT (CURRENT PERMIT EXPIRATION DATE:
LI MODIFICATION THIS PERMIT IS APPLIED FOR PURSUANT TO THE LI NEW SOURCE FOLLOWING PROVISION(S)
OF THE VIRGINIA REGULATIONS OR FEDERAL REGULATIONS (IF KNOWN):
O9 VAC 5-80-10 (NEW AND MOD.
SOURCES)
SEXEMPTION 9 VAC 5-80-20 (PSD, MAJOR SOURCES) 9 VAC 5-80-30 (NON-ATTAINMENT MAJOR SOURCES)
L1 REGISTRATION UPDATE x 9 VAC 5-80-40 (STATE OPERATING PERMITS) l OWNERSHIP OR NAME CHANGE -
EFFECTIVE DATE:
(COMPLETE PAGES I AND 2 ONLY)
OTHER (SPECIFY)
"COMPANY AND DIVISION NAME:
Virginia Electric and Power Company, North Anna Power Station MAILING ADDRESS:
5000 DominiOn Boulevard, Glen Allen, Virginia 23060 TELEPHONE NUMBER:
NUMBER OF EMPLOYEES AT SITE:
PROPERTY AREA AT SITE:
(804) 273-2929 Approx. 1,000 1,855 Acres EXACT SOURCE LOCATION - INCLUDE NAME OF CITY (COUNTY) AND FULL STREET ADDRESS ORDIRECTIONS:
North end of Route 700, Louisa County, Virginia PERSON TO COTC ON 1:
AIOLLUTION1 MATT ERS - NAME AND TITLE:
POE NUMBER:
(804) 273 - 3467 Pamela F. Faggert Vice President and Chief Environmental Officer FAX NUMBER, IF AVAILABLE:
FFOR OFFICIAL USE ONLY ECOUNTY CODE:
PLANT ID NUMBER:
UMNMES FORM REVISED March 15,1996 2
COMMONWEALTH OF VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY AIR PERMIT APPLICATION GENERAL INFORMATION (continued)
COMPANY NAME Virginia Electric and Power Company IS THE FACILITY TO BE PERMITTED AS A PORTABLE PLANT?
YES__ NO X DESCRIBE THEPRODUCTS MANUFACTURED AND/ORSERVIU_-v r-crirvnrVF-.-
ofDelectricit for sale LIST THE STANDARD INDUSTRIAL CLASSIFICATION (SIC) CODE(S) FOR THE FACILITY:
4
[9 F]
71 F11 PRIMARY SIC PLEASE LIST ALL THE FACILITIES IN VIRGINIA UNDER COMMON OWNERSHIP OR CONTROL BY THE OWNER OF THIS FACILITY:
Numerous facilities throughout the eastern 213 of Virginia MILESTONES. This section is to be completed if the permit application includes a new emissions unit or modification to existing operations.
MILESTONES*
STARTING DATE ESTIMATED COMPLETION DATE New equipment installation N/A Modification of existing N/A process or equipment Start-up dates N/A For new or modified installations to be constructed in phased schedule, give construction/installation starting and completion date for each phase.
3 REVISED March 15, 1996 FORM 7
FUEL-BURNING EQUIPMENT AND STATIONARY COMBUSTION ENGINES (EXCEPT INCINERATORS)
(BOILERS, TURBINES, GASIDIESEL ENGINES, KILNS, ETC.):
COMPNY NME irgnaEectric and Power Company DATE 0211512002!
REGISTRATION NUMBER 40726 I
l r !'
Ct Code A - Equipment 12 BOILER TYPE:
I
- 1. Pulverized Coal-Wet Bottom 1
- 2. Pulverized Coal - Dry Bottom S
- 3. Pulverized Coal - Cyclone Furnace 1
- 4. Spreader Stoker 1
- 5. Chain or Travelling Grate Stoker 1'
- 6. Underfeed Stoker 0
- 7. Hand Fired Coal 1
- 8. Oil, Tangentially Fired 1
- 9. Oil, Horizontally Fired (except rotary cup) 1
- 10. Gas, Tangentially Fired 1
- 11. Gas, Horizontally Fired S
FOR MODIFICATION CODES SEE INSTRUCTIONS ON NEXT PAGE.
ode A (continued)
Wood with Flyash Reinjection
- 3. Wood without Flyash Reinjection
- 4. Other Specify TATIONARY ENGINE TYPE:
- 5. Combustion Turbine
- 6. Internal Combustion Engine
- 7. Other Specify ITHER COMBUSTION UNITS:
- 8. Oven I Kiln
- 9. Rotary Kiln
- 8. Process Furnace
- 9. Other Specify Code B - Usage
- 1. Steam Production
- 2. Drying / Curing
- 3. Space Heating
- 4. Process Heat
- 5. Food Processing
- 6. Electrical Generation
- 7. Mechanical Work
- 99. Other 4
FORM 7 REVISED March 15, 1996 Sheet 1 of 2
Code A - Equipment Code A (continued)
BOILER TYPE:
- 12. Wood with Flyash Reinjection
- 1. Pulverized Coal -Wet Bottom
- 13. Wood without Flyash Reinjection
- 2. Pulverized Coal - Dry Bottom
- 14. Other Specify
- 3. Pulverized Coal - Cyclone Furnace STATIONARY ENGINE TYPE:
- 4. Spreader Stoker
- 15. Combustion Turbine
- 5. Chain or Travelling Grate Stoker
- 16. Internal Combustion Engine
- 6. Underfeed Stoker
- 17. Other Specify
- 7. Hand Fired Coal OTHER COMBUSTION UNITS:
- 8. Oil, Tangentially Fired
- 18. Oven / Kiln
- 9. Oil, Horizontally Fired (except rotary cup)
- 19. Rotary Kiln
- 10. Gas, Tangentially Fired
- 18. Process Furnace
- 11. Gas, Horizontally Fired
- 99. Other Specify FOR MODIFICATION CODES SEE INSTRUCTIONS ON NEXT PAGE.
REVISED March 15, 1996 Code B - Usage
- 1. Steam Production
- 2. Drying / Curing
- 3. Space Heating
- 4. Process Heat
- 5. Food Processing
- 6. Electrical Generation
- 7. Mechanical Work
- 99. Other 4
FORM 7 Sheet 2 of 2 FUEL-BURNING EQUIPMENT AND STATIONARY COMBUSTION ENGINES (EXCEPT INCINERATORS)
(BOILERS, TURBINES, GASIDIESEL ENGINES, KILNS, ETC.):
COMPANY NAME Virginia Electric and Power Company DATE 0211512002 REGISTRATION NUMBER 40726 M
MAXIMUM MAXIMUM RATED OUTPUT APPROPRIATE TO 0
RATED SOURCE TYPE D
INPUT HEAT C
CAPACITY EQUIPMENT MANUFACTURER AND 0
FOR EACH TYPE OF OUTPUT UNIT MODEL NUMBER, IF KNOWN; D
FUEL EQUIPMENT STEAM BRAKE ELECTRICAL USAGE REF.
OTHERWISE, TYPE OF EQUIPMENT E
(MILLION TYPE OF (USE QUANTITY HORSEPOWER POWER (USE NO.
(DATE OF MANUFACTURE OR CONSTRUCTION)
BTUIHR)
FUEL CODE A)
(Iblhr)
(BHP)
(KW)
CODE B)
ES-Emergency diesel generator No. 2 /
3,250 kW 5
Fairbanks Morse, Inc.
0 35.1 Diesel Fuel 16 continuous 6
Oil
._output ES-Emergency diesel generator No.2 /
3,250 kW 6
Fairbanks Morse, Inc.
0 35.1 Diesel Fuel 16 continuous 6
Oil output ES-Emergency diesel generator No.2 1 3,250 kW 7
Fairbanks Morse, Inc.
0 35.1 Diesel Fuel 16 continuous 6
Oil output.
STACK PARAMETERS AND FUEL DATA:
COMPANY NAME Virginia Electric and Power Company DATE 0211512002 REGISTRATION NUMBER 40726 VENT/STACK OR EXHAUST DATA FUEL(S) DATA MAX.
MAX.
MAX.
VENT/
EXIT RATED EXPECTED EXPECTED HIGHER STACK VENT EXIT EXIT GAS GAS EXIT BURNED/
BURNED/
BURNED!
HEATING UNIT VENT]
CONFIG.
STACK DIA.
VELOCITY VOLUME GAS HOUR DAY YEAR VALUE MAX.
REF.
STAC (USE HEIGHT TEMP.
TYPE OF (SPECIFY (SPECIFY (SPECIFY (SPECIFY MAX. %
NO.
K NO.
CODE K)
(feet)
(feet)
(fpm)
(acfm)
('F)
FUEL UNITS)
UNITS)
UNITS)
UNITS)
SULFUR ASH Distillate (Diesel 647.9 15,550 323,950 140,000 ES-1 EP-1 1
80 7
714 27,496 518 or No. 2) gal gal gal Btulgal 0.2 trace Distillate (Diesel 647.9 15,550 323,950 140,000 ES-2 EP-2 1
80 7
714 27,496 518 or No. 2) gal gal gal Btulgal 0.2 trace Distillate (Diesel 261.4 6,274 130,700 140,000 ES-3 EP-3 3
30 2.17 8,440 31,044 800 or No. 2) gal gal gal Btulgal 0.2 trace ES-4 EP-4 ES-5 EP-5 Distillate 250,800 ES-6 EP-6 (Diesel 250.8 6,020 gal 140,000 ES-7 EP-7 2
15 2
4,042 12,700 800 or No. 2) gal (ea) gal.(ea)
(total)
Btulgal 0.2 trace Code K - Vent/Stack Confiouration
- 1. Unobstructed vertical discharge
- 2. Obstructed vertical discharge (e.g., raincap)
- 3. Horizontal or downward discharge (e.g., T-stack)
- 99. Other (specify)
REVISED March 15, 1996 11 FORM 7
CRITERIA POLLUTANT EMISSIONS:
COMPANY NAME Virginia Electric and Power Company DATE 02/15/2002 REGISTRATION NUMBER 40726 Code M - Emission Estimate Method (provide detailed calculations Including assumed control efficiency of control euipment to support reported values.)
- 1. Stack Test (include a copy of summary)
- 2. Material Balance (include calculations)
- 3. Emission Factor (identify source) and include calculations
- 99. Other (describe)
TSP, PMlo, and VOCs should also be split up by component and reported under TOXIC OR HAZARDOUS POLLUTANTS.
FORM 7 REVISED March 15, 1996 14
OPERATING PERIODS: (Optional use, to establish restriction on operating hours.)
COMPANY NAME Virginia Electric and Power Company DATE 02115/2002 REGISTRATION NUMBER 40726 MAXIMUM FACILITY OPERATING SCHEDULE HOURS PER DAY DAYS PER WEEK WEEKS PER YEAR 24 7
52 16 REVISED March 15, 1996 FORM 7