ML020650333
| ML020650333 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 02/12/2002 |
| From: | Mallen F South Texas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NOC-AE-02001261 | |
| Download: ML020650333 (14) | |
Text
Nuclear Operating Company South Texas Pro/&ct Nuclear Operallng Company PO Box 289 Wvadsworth, Trxas 77483 February 12, 2002 NOC-AE-02001261 File No. G02 ST131403045 10CFR50.71 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for January, 2002 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for January 2002.
If you should have any questions on this matter, please contact R. L. Hill at (361) 972-7667.
Sincerely, F. H. Mallen Manager, Planning & Controls Attachments: 1) STPEGS Unit 1 Monthly Operating Report - January 2002
- 2) STPEGS Unit 2 Monthly Operating Report - January 2002
NOC-AE- 02001261 File No.: G02 STI No.:31403045 Page 2 cc:
Ellis W. Merschoff Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mohan C. Thadani U. S. Nuclear Regulatory Commission Project Manager, 1 White Flint North 11555 Rockville Place Rockville, MD 20852-2738 Mail Stop: O-7D1 Cornelius F. O'Keefe U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code MN 16 Wadsworth, TX 77483 A. H. Gutterman, Esquire Morgan, Lewis & Bockius 1800 M. Street, N.W.
Washington, DC 20036-5869 M. T. Hardt/W. C. Gunst City Public Service P. 0. Box 1771 San Antonio, TX 78296 Jon C. Wood Matthews & Branscomb 112 East Pecan, Suite 1100 San Antonio, Texas 78205-3692 Institute of Nuclear Power Operations - Records Center 700 Galleria Parkway Atlanta, GA 30339-5957 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 R. L. Balcom/D. G. Tees Reliant Energy, Inc.
P. 0. Box 1700 Houston, TX 77251 C. A. Johnson/A. C. Bakken, III AEP - Central Power and Light Company P. 0. Box 289, Mail Code: N5022 Wadsworth, TX 77483 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 A. Ramirez/C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT JANUARY 2002 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 Approved By:
a o
?
E.D. HALPIN Date
MONTHLY
SUMMARY
South Texas Project Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.
OPERATING DATA REPORT DOCKET NO.
50-498 UNIT 1
DATE Feb. 4, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS
- 1.
REPORTING PERIOD: 01/1/02-01/31/02 GROSS HOURS IN REPORTING PERIOD: 744
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6
- 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
- 4.
REASONS FOR RESTRICTION (IF ANY): N/A
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
19.
THIS MONTH YR TO DATE CUMULATIVE NUMBER OF HOURS REACTOR CRITICAL 744.0 744.0 90,693.9 REACTOR RESERVE SHUTDOWN HOURS 0
0 0
HOURS GENERATOR ON LINE 744.0 744.0 89,063.8 UNIT RESERVE SHUTDOWN HOURS 0
0 0
GROSS THERMAL ENERGY GENERATED (MWH) 2,839,573 2,839,573 332,137,913 NET ELECTRICAL ENERGY GENERATED (MWH) 942871 942,871 108,290,985 REACTOR SERVICE FACTOR (%)
100.0 100.0 77.0 REACTOR AVAILABILITY FACTOR (%)
100.0 100.0 77.0 UNIT SERVICE FACTOR (%)
100.0 100.0 75.6 UNIT AVAILABILITY FACTOR (%)
100.0 100.0 75.6 UNIT CAPACITY FACTOR - Using MDC (%)
101.3 101.3 73.5 UNIT CAPACITY FACTOR - Using DER (%)
101.3 101.3 73.5 UNIT FORCED OUTAGE RATE (%)
0.0 0.0 14.2 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-498 UNIT 1
DATE Feb. 4, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH JANUARY DAY DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 1266 2
1267 3
1268 4
1270 5
1262 6
1271 7
1274 8
1271 9
1269 10 1263 11 1263 12 1266 13 1269 14 1267 15 1267 16 1266 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL (MWe-Net) 1268 1270 1270 1269 1268 1271 1270 1265 1266 1267 1267 1257 1258 1268 1271
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-498 1
Feb. 4,2002 R.L. Hill 361.972.7667 REPORT MONTH JAUNARY 1
F: Forced S: Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)
Shutting Event Code Code Down Report #
Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD
PORVS AND SAFETY VALVE
SUMMARY
There were no PORV or Safety Valves challenged during the reporting period.
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT JANUARY 2002 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 ApprovedBy:
E.D. HKPIN Date
MONTHLY
SUMMARY
South Texas Project Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.
OPERATING DATA REPORT DOCKETNO.
50-499 UNIT 2
DATE Feb. 4, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS
- 1.
REPORTING PERIOD: 01/1/02-01/31/02 GROSS HOURS IN REPORTING PERIOD: 744
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6
- 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
- 4.
REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE NUMBER OF HOURS REACTOR CRITICAL 744.0 744.0 88,558.0 REACTOR RESERVE SHUTDOWN HOURS 0
0 0
HOURS GENERATOR ON LINE 744.0 744.0 86,371.7 UNIT RESERVE SHUTDOWN HOURS 0
0 0
GROSS THERMAL ENERGY GENERATED (MWH) 2,838,840 2,838,840 321,999,372 NET ELECTRICAL ENERGY GENERATED (MWH) 934,760 934,760 104,892,881 REACTOR SERVICE FACTOR (%)
100.0 100.0 80.0 REACTOR AVAILABILITY FACTOR (%)
100.0 100.0 80.0 UNIT SERVICE FACTOR (%)
100.0 100.0 78.1 UNIT AVAILABILITY FACTOR (%)
100.0 100.0 78.1 UNIT CAPACITY FACTOR - Using MDC (%)
100.5 100.5 75.8 UNIT CAPACITY FACTOR - Using DER (%)
100.5 100.5 75.8 UNIT FORCED OUTAGE RATE (%)
0.0 0.0 13.8 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
19.
AVERAGE DAILY UNIT POWER LEVEL DOCKETNO.
50-499 UNIT 2
DATE Feb. 4, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH JANUARY DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1260 1257 1256 1256 1259 1257 1257 1256 1258 1256 1262 1258 1258 1258 1258 1259 15 16 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1257 1258 1239 1257 1256 1252 1251 1260 1256 1259 1252 1259 1261 1254 1258
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-499 2
Feb. 4, 2002 R.L. Hill 361.972.7667 REPORT MONTH JANUARY 1
F: Forced S: Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)
Shutting Event Code Code Down Report #
Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD
PORVS AND SAFETY VALVE
SUMMARY
There were no PORV or Safety Valves challenged during the reporting period.