Exelkn.

Exelon Generation www.exeloncorp.com Nuclear "Quad Cities Generating Station 22710 206th Avenue North Cordova, IL 61242-9740 Tel 309-654-2241 February 08, 2002 SVP-02-009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265

Subject:

Monthly Operating Report In accordance with Generic Letter 97-02 and Technical Specification 5.6.4, "Monthly Operating Reports," we are submitting the Monthly Operating Report for Quad Cities Nuclear Power Station, Units 1 and 2. This report covers the period of January 1, 2002 to January 31, 2002.

Should you have any questions concerning this letter, please contact Mr. W. J. Beck at (309) 227-2800.

Respectfully, Te,thy J. Tulon e Vice President Quad Cities Nuclear Power Station Attachment cc:

Regional Administrator - NRC Region III NRC Senior Resident Inspector - Quad Cities Nuclear Power Station

ATTACHMENT QUAD CITIES NUCLEAR POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT EXELON NUCLEAR AND MIDAMERICAN ENERGY COMPANY FACILITY OPERATING LICENSE NOS. DPR-29 AND DPR-30 NRC DOCKET NOS. 50-254 AND 50-265

TABLE OF CONTENTS I.

Introduction II.

Summary of Operating Experience A.

Unit One B.

Unit Two Ill.

Operating Data Statistics A.

Operating Data Report for January - Quad Cities Unit One B.

Operating Data Report for January - Quad Cities Unit Two IV.

Unit Shutdowns A.

Unit One Shutdowns B.

Unit Two Shutdowns V.

Amendments to Facility License or Technical Specifications VI.

Unique Reporting Requirements A.

Main Steam Relief Valve Operations

I. INTRODUCTION Quad Cities Nuclear Power Station is composed of two Boiling Water Reactors and Steam Turbine/Generators, each with a Maximum Dependable Capacity of 769 MWe Net, located in Cordova, Illinois. The Station is jointly owned by Exelon Nuclear and MidAmerican Energy Company. The Nuclear Steam Supply Systems are General Electric Company Boiling Water Reactors. The Architect/ Engineer was Sargent & Lundy, Incorporated, and the primary construction contractor was United Engineers & Constructors. The Mississippi River is the condenser cooling water source. The plant is subject to license numbers DPR-29 and DPR-30, issued October 1, 1971, and March 21, 1972, respectively; pursuant to Docket Numbers 50-254 and 50-265. The date of initial Reactor criticalities for Units One and Two, respectively were October 18, 1971, and April 26, 1972. Commercial generation of power began on February 18, 1973 for Unit One and March 10, 1973 for Unit Two.

This report was compiled by Ron Baumer and Debbie Cline, telephone numbers 309-227-2811 and 2801, respectively.

II.

SUMMARY

OF OPERATING EXPERIENCE A.

Unit One Unit One operated the month of January at full power with the exception of a load drop on January 06 to exercise control rods. On January 09, Unit One was shutdown due to a failure of the hold down beam for Jet Pump #20. The unit remained shutdown the rest of the month.

B.

Unit Two Unit Two operated the month of January at full power until January 24, when the unit commenced end of life coast down for the upcoming refuel outage, Q2R1 6. During the month, there were two planned load drops for CRD special maneuvers, three unplanned load drops for Turbine Control Valve oscillations and a load drop at the request of the Mid-American load dispatcher.

III. OPERATING DATA STATISTICS A. Unit One Operating Data Report for January 2002 DOCKET NO. :50-254 DATE:

COMPLETED BY:

TELEPHONE:

OPERATING STATU February 15, 2002 Ron Baumer (309) 227-2811 0000 010102

1. REPORTING PERIOD: 2400 013102 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2511 MAX. DEPEND. CAPACITY: 769 DESIGN ELECTRICAL RATING (MWe-NET):

789 Quad Cities Unit One Operating Statistics for January 2002 UNITONE THIS MONTH YTD CUMULATIVE

3.

NUMBER OF HOURS THE REACTOR WAS CRITICAL 210.50 210.50 202243.30

4.

REACTOR RESERVE SHUTDOWN HOURS 533.50 533.50 3955.40

5.

HOURS GENERATOR ON-LINE 210.00 210.00 196948.60

6.

UNIT RESERVE SHUTDOWN HOURS 534.00 534.00 1512.20

7.

GROSS THERMAL ENERGY GENERATED (MWH) 513917.52 513917.52 438365598.60

8.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 169473.00 169473.00 141858998.00

9.

NET ELECTRICAL ENERGY GENERATED (MWH) 157822.00 157822.00 128672211.00

10.

REACTOR SERVICE FACTOR 28.29 28.29 76.64

11.

REACTOR AVAILABILITY FACTOR 28.29 28.29 78.21

12.

UNIT SERVICE FACTOR 28.23 28.23 74.55

13.

UNIT AVAILABILITY FACTOR 28.23 28.23 75.12

14.

UNIT CAPACITY FACTOR (Using MDC) 27.58 27.58 62.80

15.

UNIT CAPACITY FACTOR (Using Design MWe) 26.89 26.89 61.21

III. OPERATING DATA STATISTICS B. Unit Two Operating Data Report for January 2002 DOCKET NO.:50-265 DATE:

COMPLETED BY:

TELEPHONE:

OPERATING STATU

1.

2.

February 15, 2002 Ron Baumer (309) 227-2811 0000 010102 REPORTING PERIOD: 2400 013102 GROSS HOURS IN REPORTING PERIOD: 744 CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2511 MAX. DEPEND. CAPACITY: 769 DESIGN ELECTRICAL RATING (MWe-NET):

789 Quad Cities Unit Two Operating Statistics for January 2002 UNIT TWO THIS MONTH YTD CUMULATIVE

3.

NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.00 744.00 196655.80

4.

REACTOR RESERVE SHUTDOWN HOURS 0.00 0.00 3640.10

5.

HOURS GENERATOR ON-LINE 744.00 744.00 190563.15

6.

UNIT RESERVE SHUTDOWN HOURS 0.00 0.00 1404.90

7.

GROSS THERMAL ENERGY GENERATED (MWH) 1849023.36 1849023.36 423942940.86

8.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 603598.00 603598.00 136219529.00

9.

NET ELECTRICAL ENERGY GENERATED (MWH) 580653.00 580653.00 129438823.00

10.

REACTOR SERVICE FACTOR 100.00 100.00 78.36

11.

REACTOR AVAILABILITY FACTOR 100.00 100.00 79.55

12.

UNIT SERVICE FACTOR 100.00 100.00 75.93

13.

UNIT AVAILABILITY FACTOR 100.00 100.001 76.21

14.

UNIT CAPACITY FACTOR (Using MDC) 101.49 101.49 63.82

15.

UNIT CAPACITY FACTOR (Using Design MWe) 98.92 98.92 62.20

IV. UNIT SHUTDOWNS A. Unit One Shutdowns for January 2002 DOCKET NO.:

DATE:

COMPLETED BY:

TELEPHONE:

50-254 February 15, 2002 Ron Baumer (309) 227-2811 Legend:

(1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

No.

DATE TYPE DURATION REASON METHOD CORRECTIVE F OR S (HOURS)

OF ACTIONS/COMMENTS SHUTTING DOWN REACTOR 2002-01 01/09/02 F

534 A

1 U1 Reactor Shutdown due to Jet Pump #20 hold down beam failure

IV. UNIT SHUTDOWNS B. Unit Two Shutdowns for January 2002 DOCKET NO.:

DATE:

COMPLETED BY:

TELEPHONE:

50-265 February 15, 2002 Ron Baumer (309) 227-2811 No.

DATE TYPE DURATION REASON METHOD CORRECTIVE F OR S (HOURS)

OF ACTIONS/COMMENTS SHUTTING DOWN REACTOR None for the month of January Legend:

(1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

V. AMENDMENTS TO FACILITY LICENSE OR TECHNICAL SPECIFICATIONS There were no Technical Specification changes in January.

VI. UNIQUE REPORTING REQUIREMENTS There were no relief valve actuations for the month of January.