Research Reactor Center University of Missouri-Columbia Research Park Columbia, MO 65211 PHONE (573) 882-4211 FAX (573) 882-6360 February 12, 2002 Mr. Alexander Adams, Jr.
U.S. Nuclear Regulatory Commission Mail Stop 012-D3 Washington, DC 20555-0001
SUBJECT:
Monthly Operations Summary Enclosed is a copy of MURR's monthly operations summary for January 2002.
questions, please contact me at (573) 882-5264.
If you have any Sincerely, Paul S. Hobbs, PE Reactor Manager PSH/djr Enclosure 0
rV V
AN EQUAL OPPORTuNITY/ADA INSTITUTION
ýýe n 000x-
!9 011
ýý
'eo -1 ý4
UNIVERSITY OF MISSOURI RESEARCH REACTOR OPERATIONS MONTHLY
SUMMARY
January 2002 Prepared by:
Operations Staff
INTRODUCTION The reactor operated continuously in January with the following exceptions: four shutdowns for scheduled maintenance and refueling; two unscheduled shutdowns.
On January 20, a manual scram was initiated by the Lead Senior Reactor Operator due to erratic indication on Reactor Inlet Temperature Instrument 980B.
On January 26, a manual scram was initiated by the Lead Senior Reactor Operator due to a recurrence of the erratic indication on Reactor Inlet Temperature Element 980B.
Licensee Event Report No. 02-01, providing a description of these events and the corrective actions taken, is being prepared and will be submitted within the technical specification thirty day time requirement.
MAJOR MAINTENANCE ITEMS
- 1. Completing modification record 01-09, "Installation of Emergency Lighting Panel No. 1."
- 2. Loading new pool deionization bed "P".
- 3. Rebuilding primary heat exchanger 503A drain valve 515A.
- 5. Completing modification record 01-09, addendum 1, "Relocation and Replacement of Emergency Lighting Panel No. 2."
- 6. Replacing Reactor Inlet Temperature Instrument 980B meter relay unit, transmitter, and RTD.
- 7. Completing modification record 01-11, "Replace K Relay Sockets with an Improved Design."
UNSCHEDULED SHUTDOWNS Date No.
IYPe Cause 1/20/02 1132 Manual Scram Erratic Reactor Inlet Temp. Indication On January 20, a manual scram was initiated by the Lead Senior Reactor Operator upon discovering that Reactor Inlet Temperature Instrument 980B indication had become erratic. Electronics technicians were called in to assist with trouble-shooting. Compliance Procedure CP-8B, which tests the 980 A and B temperature instrument safety system functions, was performed satisfactorily. The instrument indication returned to normal shortly after the shutdown and the malfunction could not be duplicated. The 980B meter relay unit was replaced and Compliance Procedure CP-8B was performed satisfactorily. The reactor was subsequently refueled and returned to normal operation. During the next scheduled maintenance shutdown, on January 21, the calibration of the 980 temperature instruments was again checked by electronics technicians and found to be satisfactory.
1/26/02 1133 Manual Scram Erratic Reactor Inlet Temp. Indication On January 26, the Lead Senior Reactor Operator initiated a manual scram after discovering that Reactor Inlet Temperature Element 980B indication had again become erratic. A calibration check performed by electronics technicians showed no indication of failure and the calibration data were within established specifications. Electronics technicians replaced the 980B transmitter and Resistance Temperature Detector (RTD) unit. CP-8B was performed satisfactorily. No further problems with erratic indications have occurred.
Licensee Event Report No. 02-01, providing a description of these events and the corrective actions taken, is being prepared and will be submitted within the technical specification thirty day time requirement.
3
MAINTENANCE ACTIVITIES 1/7/02 Refueled - removed core 01-6 1, loaded core 02-01.
1/10/02 Completed Modification Record No. 0 1-09, "Installation of Emergency Lighting Panel No. 1."
1/13/02 Loaded new pool deionization bed "P."
1/14/02 Refueled - removed core 02-01, loaded core 02-02.
Rebuilt primary heat exchanger 503A drain valve 515A.
Completed DI-201 valve and flange gasket refurbishment.
1/16/02 Completed modification record No. 01-09 addendum 1 "Relocation and Replacement of Emergency Lighting Panel No. 2."
1/20/02 Refueled - removed core 02-02, loaded core 02-03.
Replaced Reactor Inlet Temperature Instrument 980B meter relay unit.
1/21/02 Refueled - removed core 02-03, loaded core 02-04.
1/26/02 Refueled - removed core 02-04, loaded core 02-05.
Replaced Reactor Inlet Temperature Instrument 980B transmitter and RTD unit.
1/28/02 Refueled - removed core 02-05, loaded core 02-06.
Completed modification record No. 01-11 "Replace K Relay Sockets with an Improved Design."
4
OPERATIONS
SUMMARY
HOURS OPERATED THIS PERIOD 656 TOTAL HOURS OPERATED 240,399 HOURS AT FULL POWER THIS PERIOD 653 TOTAL HOURS AT FULL POWER 237,167 INTEGRATED POWER THIS PERIOD 272 MWD TOTAL INTEGRATED POWER 93,016 MWD 5