December 2001 Monthly Operating Report for Seabrook Station
ML020600202
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 01/08/2002
From: St.Pierre G
North Atlantic Energy Service Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NYN-02004
Download: ML020600202 (3)


Text

North Atlantic North Atlantic Energy Service Corporation P.O. Box 300 Seabrook, NH 03874 (603) 474-9521 The Northeast Utilities System January 8, 2002 Docket No. 50-443 NYN-02004 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station December 2001 Monthly Operating Report Enclosed please find Monthly Operating Report 01-12. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of December, 2001 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.

Should you require further information regarding this

matter, Mr. James M. Peschel, Manager - Regulatory Programs, at (603) 773-7194.

please contact Very truly yours, NORTH ATLANTIC ENERGY SERVICE CORP.

C Gene F. St. Pierre Station Director cc:

H. J. Miller, NRC Region I Administrator G. F. Wunder, NRC Project Manager, Project Directorate 1-2 G.T. Dentel, NRC Senior Resident Inspector

OPERATING DATA REPORT DOCKET NO.

50-443 UNIT Seabrook 1 DATE January 1, 2002 COMPLETED BY P.E. Nardone TELEPHONE (603) 773-7074 OPERATING STATUS

1.

Unit Name:

Seabrook Station Unit 1

2.

Reporting Period:

DECEMBER 2001

3.

Licensed Thermal Power (MWt):

3411.0

4.

Design Electrical Rating (Net MWe):

1148.0

5.

Maximum Dependable Capacity (Net MWe):

1155.3

6.

If Changes Occur in Capacity Ratings (Items Number 3 through 5)

Not Applicable Since Last Report, Give Reasons:

This Month Yr-to-Date Cumulative

7.

Number of Hours Reactor Was Critical 744.0 7809.4 86503.9

8.

Hours Generator On-Line 744.0 7704.5 83708.7

9.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

10.

Net Electrical Energy Generated (MWH) 861860 8692240 93885532 1 of 2 OPERATING

SUMMARY

The unit operated at 100% Rated Thermal Power (RTP) for all but thirteen hours this month. It reduced power to 97% RTP to facilitate calibration of a Reactor Protection Temperature Channel. This yielded an availability factor of 100% and a capacity factor of 100.3% based on the MDC value of 1155.3 Net MWe.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-443 UNIT Seabrook I DATE January 1, 2002 COMPLETED BY P.E. Nardone TELEPHONE (603) 773-7074 MONTH: DECEMBER 2001 NO.

DATE TYPE' DURATION REASON 2 METHOD OF SHUTTING CAUSE / CORRECTIVE ACTIONS (HOURS)

DOWN REACTOR 3 COMMENTS 01-13 12/26/01 F

0.0 B/F 5

Reduced power to 97% RTP to complete a calibration on Loop 1 Reactor Protection Temperature channel. Operations procedures required a 2% RTP power reduction with Loops 1, 3 or 4 temperature channels in a tripped condition. This action provides margin against an inadvertent OPAT/OTAT reactor trip due to the Upper Plenum Flow Anomaly. Unit returned to full power operation the following day.

12 3

F:

Forced Reason:

Method:

S:

Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training / License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain) 2 of 2