Bryce L. Shriver Vice President - Nuclear Site Operations PPL Susquehanna, LLC 707 Salem Boulevard P.O. Box 467 Berwick, PA 18603-0467 Tel.570.542.3120 Fax 570.542.1504 blshriver@pplweb.com
- . I j
PPI T
I TM February 13, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-137 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005445 FILE: R41-2A The January 2002 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yours, Bryce L. Shriver JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. S. Hansell NRC Sr. Project Manager, Mr. R. G. Schaaf
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 2-12-02 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susquehanna Steam Electric Station (U1)
- 2.
Reporting Period:
January 2002
- 3.
Design Electrical Rating (Net MWe):
1100
- 4.
Maximum Dependable Capacity (Net MWe):
1090 Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 744 744 744 0
789,507 Yr.-to-Date 744 744 744 0
789,507
- 5.
- 6.
- 7.
- 8.
9.
Cumulative 163,513 135,046.2 132,904.0 0
136,016,416 NOTES:
Page 1 of 1
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 2/12/02 J. J. Hennings (570) 542-3747 REPORT MONTH January 2002 No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3
No shutdowns this month.
Summary: Unit 1 reached the end of full power capability for cycle 12, and began coast down on January 12, 2002. Unit 1 - 12 refueling outage will begin in early March.
- 2.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
- 3.
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other
- 1.
F. Forced S. Scheduled Page 1 of 1
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Date:
02-12-02 Completed by:
J. J. Hennings Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 02-12-02 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susquehanna Steam Electric Station (U2)
- 2.
Reporting Period:
January 2002
- 3.
Design Electrical Rating (Net MWe):
1117
- 4.
Maximum Dependable Capacity (Net MWe):
1111 Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 744 744 744 0
833,588 NOTES:
Page 1 of 1
- 5.
- 6.
- 7.
- 8.
9.
Yr.-to-Date 744 744 744 0
833,588 Cumulative 148,753 128,401.0 126,510.7 0
131,638,418
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 02-12-02 J. I. Hennings (570) 542-3747 REPORT MONTH January 2002 No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting to Prevent Recurrence Down Reactor 3
No Shutdowns this month.
Summary: Unit 2 reduced power to 78% on January 19 for a Control rod Sequence Exchange. The unit returned to 100%
power on January 20.
2.
3.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other 1.
F. Forced S. Scheduled Page 1 of 1
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Completed by:
J. J. Hennings Date:
02-12-02 Telephone:
(570) 542-3747 Challenaes to Main Steam Safety Relief Valves None.