ML020600157
| ML020600157 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 02/26/2002 |
| From: | Bergendahl H FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 2766 | |
| Download: ML020600157 (5) | |
Text
FENOC FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, Ohio 43449-9760 Howard W. Bergendahl Fax. 419-321-8337 Vice President - NuclearFa:49318 7
Docket Number 50-346 License Number NPF-3 Serial Letter 2766 February 26, 2002 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
Subject:
Semiannual Fitness-For-Duty Report, July - December, 2001 Ladies and Gentlemen:
Pursuant to 10 CFR 26.71 (d), "Recordkeeping Requirements," First Energy Nuclear Operating Company (FENOC) submits the semiannual Fitness-For-Duty (FFD) report for the period of July through December 2001, for the Davis-Besse Nuclear Power Station, Unit 1 (DBNPS). provides FENOC's DBNPS FFD Program Performance Data. Attachment 2 provides a summary of management actions taken by FENOC based on positive FFD testing results, presumptive positives, and a list of FFD event reports submitted by FENOC.
Should you have any questions or require additional information, please contact Mr. David H.
Lockwood, Manager - Regulatory Affairs, at (419) 321-8450.
Sincerely, BMW/s Attachments cc:
J. E. Dyer, Regional Administrator, NRC Region I S. P. Sands, NRC Project Manager C. S. Thomas, DB-1 Senior Resident Inspector Utility Radiological Safety Board
?\\ C
Docket Number 50-346 License Number NPF-3 Serial Letter 2766 First Energy Nuclear Operating Company Davis-Besse Nuclear Power Station Fitness-For-Duty Report July - December 2001
Docket Number 50-346 License Number NPF - 3 Serial Number 2766 Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 Firt Eery Nuclear OperatingCo an Company Davis-Besse Location December 31, 2001 6 Months Ending (419) 321-8450 Phone D. H. Lockwood. Manager - Regqulatory Affairs Contact Name Cutoffs: Screen/Confirmation (nq/ml)
Marijuana Cocaine Opiates 50/15 300/150 300/300 Appendix A to 10 CFR 26 Amphetamines Phencyclidine Alcohol (%BAC) 1000/500 25/25 0.04 Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 840 0
266 Categories Tested Positive Tested Positive Tested Positive Pre-Access 71 0
204 1/1 Post Accident 0
0 0
0 Observed Behavior 5
1/1 4
0 Random 223 0
55 0/1 Follow-up 19 0
31 0
Other 4
0 0
0 Total 322 1/1*
294 1/2*
Breakdown of Confirmed Positive Tests for Specific Substances Marijuana Cocaine Opiates Amphe-Phency-Alcohol Refusal tamines Clidine to test Licensee Employees 0
0 0
0 0
1 0
Long-Term Contractors 0
0 0
0 0
0 0
Short-Term Contractors 1
1 0
0 0
0 0
Total 1
1 0
0 0
1 0
- Indicates results according to NRC policy for cutoff levels on the left side and Company policy on the right
Docket Number 50-346 License Number NPF - 3 Serial Number 2766 FENOC MANAGEMENT ACTIONS RELATING TO FITNESS-FOR-DUTY FENOC Personnel Referred to EAP Management Sanctions 0
1 FENOC does not perform onsite initial drug screening tests; therefore, there are no unconfirmed positive results on which to base management actions.
FENOC FITNESS-FOR-DUTY REPORTS There were no Fitness-For-Duty reports submitted during this reporting period (July - December 2001).
Contractor Personnel 0
2
Docket Number 50-346 License Number NPF - 3 Serial Number 2766 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Affairs (419) 321-8450 at Davis-Besse of any questions regarding this document or associated regulatory commitments.
COMMITMENTS DUE DATE None N/A