MONTHYEARIR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 IR 05000277/20240022024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24060A1192024-02-29029 February 2024 Notification of Conduct of a Fire Protection Team Inspection 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24185A1772024-07-0303 July 2024 Request for Additional Information IR 05000277/20244012023-10-0505 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML22118A3312022-04-28028 April 2022 NRR E-mail Capture - Peach Bottom - Formal RAI for Proposed Alternative I5R-14, Revision 1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 IR 05000277/20224032022-01-21021 January 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000277/2022403 and 05000278/2022403 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21035A2222021-02-0404 February 2021 Notification of Conduct of a Fire Protection Team Inspection ML21091A1782021-02-0202 February 2021 Ti 2515/194 Inspection Documentation Request ML21012A1302021-01-12012 January 2021 Request for Additional Information - TSTF-505 ML20357A0972020-12-21021 December 2020 Request for Additional Information - TSTF-505 ML20296A3342020-10-21021 October 2020 ISI Remote Inspection - Supplemental Request for Information ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20070R2282020-03-10010 March 2020 Request for Additional Information - RR ML19303D1662019-10-31031 October 2019 Requests for Additional Information for the Environmental Review of the Peach Bottom Subsequent License Renewal Application - Set 2 (EPID No. L-2018-RNW-0013)- RAIs ML19232A1752019-08-20020 August 2019 Request for Additional Information - TSTF-500 Implementation LAR ML19140A2832019-05-15015 May 2019 Email - Peach Bottom Atomic Power Station, Units 2 and 3 Second Round RAI Request - Set 1 ML19140A2822019-05-15015 May 2019 027 Pb FU RAI Subsequent to Clarification Call - Cu Greater than 15 Zn Holston (Jg) ML19253D2932019-05-0707 May 2019 002 Attachment 4D Confirmation Water Chemistry Chereskin Revised (002) ML19249C7252019-05-0303 May 2019 SLRA Requests for Additional Information - Set 2 May 3, 2019 ML19108A4282019-04-10010 April 2019 RAIs SLRA Set 1_ERO(Rev 1) ML19079A0232019-03-19019 March 2019 Licensed Operator Positive Fitness-For-Duty Test ML19058A2902019-02-27027 February 2019 Request for Additional Information - High Pressure Service Water One Time TS Change ML19037A4832019-02-0606 February 2019 NRR E-mail Capture - Clarification Questions Associated with Staff Assessment of Peach Bottom Seismic Probabilistic Risk Assessment Report Dated August 28, 2018 ML19028A0062019-01-25025 January 2019 Secondary Containment LAR Requests for Additional Information ML19017A0472019-01-16016 January 2019 Request for Additional Information - High Pressure Service Water One Time TS Change ML18348B0292018-12-13013 December 2018 Subsequent License Renewal Severe Accident Mitigation Alternatives Requests for Additional Information ML19010A3832018-12-0707 December 2018 Additional Documents Needed for Peach Bottom SLR Environmental Review ML18324A6742018-11-15015 November 2018 Request for Additional Information (FINAL)- LAR to Allow 2SRV/SVs OOS at High Pressure ML18312A4072018-11-0808 November 2018 Request for Additional Information (Public) - LAR to Allow 2SRV/SVs OOS at High Pressure ML18276A0202018-10-0202 October 2018 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan for Limerick and Peach Bottom ML18240A1742018-08-28028 August 2018 Request for Additional Information (Final) - Adopt TSTF-500 Battery TS Changes LAR ML18239A1322018-08-27027 August 2018 Request for Additional Information Final - Relief Request I5R-04 ML18228A6762018-08-14014 August 2018 Request for Additional Information - Adopt TSTF-500 Battery TS Changes LAR ML18226A2012018-08-14014 August 2018 Request for Additional Information - Relief Request I5R-05 ML18214A2812018-08-0202 August 2018 Request for Additional Information Draft - Relief Request I5R-02 ML18200A2742018-07-17017 July 2018 Request for Additional Information 2nd Round (Final) - Adopt 50.69 License Amendment ML18192A1192018-07-10010 July 2018 Request for Additional Information 2nd Round (Final) - Adopt 50.69 License Amendment ML18178A4772018-06-27027 June 2018 Request for Additional Information 2nd Round - Adopt 50.69 License Amendment ML18096B5062018-04-0606 April 2018 Request for Additional Information Exelon Generation Company, LLC Requested Amendment to Adopt 10 CFR 50.69 for Risk-informed Categorization and Treatment of Structures, Systems and Components ML18094B0832018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to P. Duke RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for Salem and Hope Creek, and Peach Bottom ISFSIs Docket Nos. 72-48 and 72-29) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17317B5502017-11-0909 November 2017 Licensed Operator Positive Fitness-For-Duty Test 2024-07-03
[Table view] |
Text
Mr. Michael P. Gallagher Director-Licensing Exelon Corporation 200 Exelon Way Kennett Square, PA 19348
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3
Dear Mr. Gallagher:
By letter dated July 2, 2001, Exelon Generation Company, LLC (Exelon), submitted for Nuclear Regulatory Commission (NRC) review an application, pursuant to 10 CFR Part 54, to renew the operating licenses for the Peach Bottom Atomic Power Station, Units 2 and 3. The NRC staff is reviewing the information contained in this license renewal application and has identified, in the enclosure, areas where additional information is needed to complete its review. Specifically, the enclosed request for additional information (RAI) is from Section 3.5 Aging Management of Containment, Structures, and Component Supports.
Please provide a schedule by letter, or electronic mail for the submittal of your response within 30 days of the receipt of this letter. Additionally, the staff would be willing to meet with Exelon prior to the submittal of the response to provide clarification of the staffs request for additional information.
Sincerely, Raj K. Anand, Project Manager License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278
Enclosure:
As stated cc w/encl: See next page
Mr. Michael P. Gallagher Director-Licensing Exelon Corporation 200 Exelon Way Kennett Square, PA 19348
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3
Dear Mr. Gallagher:
By letter dated July 2, 2001, Exelon Generation Company, LLC (Exelon), submitted for Nuclear Regulatory Commission (NRC) review an application, pursuant to 10 CFR Part 54, to renew the operating licenses for the Peach Bottom Atomic Power Station, Units 2 and 3. The NRC staff is reviewing the information contained in this license renewal application and has identified, in the enclosure, areas where additional information is needed to complete its review. Specifically, the enclosed request for additional information (RAI) is from Section 3.5 Aging Management of Containment, Structures, and Component Supports.
Please provide a schedule by letter, or electronic mail for the submittal of your response within 30 days of the receipt of this letter. Additionally, the staff would be willing to meet with Exelon prior to the submittal of the response to provide clarification of the staffs request for additional information.
Sincerely, Raj K. Anand, Project Manager License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278
Enclosure:
As stated cc w/encl: See next page DISTRIBUTION: See next page Document Name:C:\MYFILES\Copies\Final RAI Sec 3_5.wpd OFFICE PM:RLSB LA SC: DE SC:RLEP PD:RLEP NAME RKAnand EGHylton K. Manoly/C. Munson PTKuo CIGrimes DATE 01/ /02 01/ /02 01/ /02 01/ /02 01/ /02 OFFICIAL RECORD COPY
DISTRIBUTION:
HARD COPY RLSB RF E. Hylton E-MAIL:
PUBLIC J. Johnson W. Borchardt D. Matthews C. Carpenter C. Grimes B. Zalcman J. Strosnider (RidsNrrDe)
E. Imbro G. Bagchi K. Manoly C. Munson B. Elliott W. Bateman J. Calvo C. Holden P. Shemanski S. Rosenberg G. Holahan B. Boger D. Thatcher G. Galletti B. Thomas J. Moore R. Weisman M. Mayfield A. Murphy W. McDowell S. Droggitis N. Dudley RLEP Staff
Division of Regulatory Improvement Programs COVER PAGE DATE: January 28, 2002
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 ORIGINATOR: R. Anand SECRETARY: S. Chey
!!!DRIP ROUTING LIST!!!
NAME DATE
- 1. R. Anand / /02
- 2. E. Hylton / /02
- 3. K. Manoly/ C. Munson / /02
- 4. P. T. Kuo / /02
- 5. C. Grimes / /02 DOCUMENT NAME: C:\MYFILES\Copies\Final RAI Sec 3_5.wpd ADAMS ACCESSION NUMBER: ML DATE ENTERED: / /01 FORM 665 ATTACHED and filled out: YES NO COMMITMENT FORM ATTACHED: YES NO
Peach Bottom Atomic Power Station, Units 2 and 3 cc:
Chief-Division of Nuclear Safety Mr. Edward Cullen PA Dept. of Environmental Protection Vice President & General Counsel P.O. Box 8469 Exelon Generation Company, LLC Harrisburg, PA 17105-8469 300 Exelon Way Kennett Square, PA 19348 Board of Supervisors Peach Bottom Township Mr. J. Doering R. D. #1 Site Vice President Delta, PA 17314 Peach Bottom Atomic Power Station 1848 Lay Road Public Service Commission of Maryland Delta, PA 17314 Engineering Division 6 St. Paul Center Mr. G. Johnston Baltimore, MD 21202-6806 Plant Manager Peach Bottom Atomic Power Station Mr. Richard McLean 1848 Lay Road Power Plant and Environmental Review Division Delta, PA 17314 Department of Natural Resources B-3, Tawes State Office Building Mr. A. Winter Annapolis, MD 21401 Regulatory Assurance Manager Peach Bottom Atomic Power Station Dr. Judith Johnsrud 1848 Lay Road National Energy Committee, Sierra Club Delta, PA 17314 433 Orlando Avenue State College, PA 16803 Resident Inspector U.S. Nuclear Regulatory Commission Manager-Financial Control & Co-Owner Affairs Peach Bottom Atomic Power Station Public Service Electric and Gas Company P.O. Box 399 P.O. Box 236 Delta, PA 17314 Hancocks Bridge, NJ 08038-0236 Regional Administrator, Region I Mr. Frederick W. Polaski U.S. Nuclear Regulatory Commission Manager License Renewal 475 Allendale Road Exelon Corporation King of Prussia, PA 19406 200 Exelon Way Kennett Square, PA 19348 Mr. Roland Fletcher Department of Environment Radiological Health Program 2400 Broening Highway Baltimore, MD 21224 Correspondence Control Desk Exelon Generation Company, LLC 200 Exelon Way, KSA 1-N-1 Kennett Square, PA 19348
Mr. Jeffrey A. Benjamin Vice President-Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Charles Pardee Senior Vice President Mid-Atlantic Regional Operating Group Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Mr. John Skolds Chief Operating Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. William Bohlke Senior Vice President, Nuclear Services Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. James Meister Senior Vice President, Operations Support Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Alan Nelson Nuclear Energy Institute 1776 I Street, Suite 400 Washington, DC 20006
REQUEST FOR ADDITIONAL INFORMATION PEACH BOTTOM UNITS 2 AND 3 3.5 AGING MANAGEMENT OF CONTAINMENT, STRUCTURES, AND COMPONENT SUPPORTS RAI 3.5-1 Considering the vulnerability of concrete components, the staff has required previous license renewal applicants to implement an aging management program to manage the aging of concrete components. The staff position is that cracking, loss of material, and change in material properties are plausible and applicable aging effects for concrete components inside containment as well as for other structures outside containment. For inaccessible concrete components the staff does not require aging management if the applicant is able to show that the soil/water environment is nonaggressive; however, for all other concrete components inspection through an aging management program is required. Provide justification for concluding that there are no applicable aging effects for each of the concrete components, including concrete block walls, listed in Section 3.5 of the LRA.
RAI 3.5-2 Considering the vulnerability of steel components, the staff has required all previous license renewal applicants to implement an aging management program to manage the aging of steel components. The staff position is that loss of material is a plausible and applicable aging effect for steel components inside containment as well as for other structures outside containment. For steel imbedded in concrete in inaccessible areas, the staff does not require aging management if the applicant is able to show that the soil/water environment is nonaggressive. Provide justification for concluding that there are no applicable aging effects for each of the following steel components:
- 1. all carbon steel components inside containment (i.e., structural supports, pipe whip restraints, missile barriers, and radiation shields)
- 2. all carbon steel components in outdoor, sheltered, buried, and water environments outside containment:
- a. reactor building (Table 3.5-2)
- b. radwaste building and reactor auxiliary bay (Table 3.5.3)
- c. turbine building and main control room complex (Table 3.5.4)
- d. emergency cooling tower and reservoir (Table 3.5.5)
- e. station blackout structure and foundation (Table 3.5.6)
- f. yard structures (Table 3.5.7)
- g. nitrogen storage building (Table 3.5.9)
- h. diesel generator building (Table 3.5.10)
- i. circulating water pump structure (Table 3.5.11)
- j. recombiner building (Table 3.5.12)
- k. component supports (Table 3.5.13)
- l. hazard barriers and elastomers (Table 3.5.14)
- m. miscellaneous steel (Table 3.5.15)
- n. electrical and instrumentation enclosures and raceways (Table 3.5.16)
RAI 3.5-3 No aging effects are identified in Table 3.5.1- 3.5.14 in the LRA for the components listed below:
- 1. Bronze/graphite pressure suppression chamber lubrite plates (Table 3.5-1)
- 2. Cast iron sluice gates in raw water (Table 3.5-11)
- 3. Grout (Table 3.5-13)
- 4. Bronze/graphite lubrite plates (Table 3.5-13)
- 5. Neoprene Reactor Building blowout panel seals (Table 3.5-14)
- 6. Silicone Reactor Building metal siding gap seals (Table 3.5-14)
Lubrite plates are susceptible to loss of mechanical function, cast iron sluice gates in raw water are susceptible to loss of material, grout is susceptible to cracking, and neoprene and silicone seals are susceptible to change in material properties and cracking. Provide justification for concluding that there are no aging effects for each of these components.
3.5.1 Containment Structure RAI 3.5.1-1 The environment inside containment may accelerate the aging (i.e., cracking loss of material, change in material properties) of the structural steel and concrete components listed in Table 3.5-1 of the LRA. Please provide information regarding the operating temperature (range),
humidity, cumulative radiation (neutron, gamma) and medium (nitrogen, water, etc) for all the components in Table 3.5-1.
RAI 3.5.1-2 The reactor pedestal, foundation, and floor slab support the reactor vessel, interior floors, equipment, and piping in the drywell. Since these concrete components are also subjected to the harsh environment of containment (i.e., high temperatures and radiation), the staff considers cracking and possibly change in material properties to be plausible and applicable aging effects.
Please provide justification as to how their intended functions will be maintained without some type of aging management program during the period of extended operation.
RAI 3.5.1-3 The sacrificial shield wall performs the function of providing shielding as well as support for earthquake ties, which are required to stabilize the drywell during a postulated earthquake. The shield wall is subjected to varying temperatures (expansion and contraction), vibratory loads during SRV discharges (steam environment), and significant radiation. As such, the staff considers cracking, loss of material, and possibly change in material properties to be plausible and applicable aging effects for the sacrificial shield wall. Please provide justification as to how their intended functions will be maintained without some type of aging management program during the period of extended operation.
RAI 3.5.1-4 The columns, saddle supports, and seismic restraints associated with the pressure suppression chamber are affected by the expansion and contraction of the major diameter of the torus induced by SRV discharges and temperature transients. In one case, the staff has seen pullout of the anchor-bolts of the column supports due to such movements. The staff considers loss of material for the carbon steel components of the suppression chamber and loss of mechanical function of their associated lubrite plates to be plausible and applicable aging effects.
Please provide justification as to how their intended functions will be maintained without some type of aging management program during the period of extended operation.