Revised November 2001 Monthly Operating Report for Perry Nuclear Power Plant, Unit 1
ML020580451
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 02/11/2002
From: Dunn G
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, PY-CEI/NRR-2615L
Download: ML020580451 (3)


Text

Perry Nuclear Power Plant 10 Center Road FE OCP.O.

Box 97 FirstEnergy N-clear Operting C pany Perry, Ohio 44081 Feburary 11, 2002 PY-CEI/NRR-2615L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is a re-issue of November 2001 Monthly Operating Report for Perry Unit 1. Page 1 contains the Operating Data Report and page 2 contains the Unit Shutdowns Report. This report was submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report" on December 12, 2001. This report is being resubmitted as the previous letter had the incorrect month's data attached.

I apologize for any inconvenience this may have caused. If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Gregory A. Dunn Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector

OPERATING DATA REPORT UNIT:

Perry_

DATE:

12/10/01 Docket: 50-440 Unit Name:

Perry Nuclear Power Plant Reporting Period: November 2001 Utility

Contact:

T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

1.
2.
3.
4.
5.
6.

7-Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)

This Month 720.0 720.0 0.0 907_234.0 Yr-to-Date 6,285.4

r. nwt sz 0.0 7066.780.0 Cumulative 95,894.0 93,446.0 0.0 105.887.737.0
  • The New Design Electrical Rating is based on the 105% uprate which was completed April of 2001.
    • The new MDC was effective April 1,2001.

Page 1 1266*

1241 **

8.
9.
10.

11.

UNIT SHUTDOWNS REPORT MONTH - NOVEMBER 2001 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 12/10/01 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1

Hours 2

3

SUMMARY

The Perry plant began the month on line. The unit remained on line the entire month of November, 2001
1. TYPE:

F: Forced S: Scheduled

2. REASON:

A - Equipment Failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

License Examination F - Administrative G - Operational Error (explain)

H - Other (explain)

3. METHOD: