Perry Nuclear Power Plant FENOC10 Center Road PrO. Box 97 FirstEnergy NuclearOperating 70p0ny Perry, Ohio 44081 February 11, 2002 PY-CEI/NRR-2616L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the January 2002 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Gregory A.D nn Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
OPERATING DATA REPORT UNIT:
Perry_
DATE:
02/07/02
- 1.
Docket: 50-440
- 2.
Unit Name:
Perry Nuclear Power Plant
- 3.
Reporting Period: January 2002
- 4.
Utility
Contact:
T. Phelps
- 5.
Telephone: 440-280-7660
- 6.
Design Electrical Rating (Net MWe):
1260*
- 7.
Maximum Dependable Capacity (Net MWe):
1235**
This Month Yr-to-Date Cumulative
- 8.
Hours Reactor was Critical 744.0 744.0 97,329.2 a
Hou.rs Gnerato',r On-I ine 7440 744.0 94.817.0
- 10.
Unit Reserve Shutdown Hours
- 11.
Net Electrical Energy (MWeH)
The New Design Electrical Rating' The new MDC was effective April 1
"* *A new Design Electrical Rating is
- The new MDC is 1235 MWe 0.0 0.0 0.0 918,229.0 918,229.0 107,518,631.0 is based on the 105% uprate which was completed April of 2001.
1,2001.
based on new net generation definitions Page 1 r
)
UNIT SHUTDOWNS REPORT MONTH - JANUARY 2002 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 02/07/02 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1
Hours 2
3
SUMMARY
- The Perry Plant remained on line the entire month.
- 1. TYPE:
F: Forced S: Scheduled
- 2.
REASON:
A - Equipment Failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &
License Examination F - Administrative G - Operational Error (explain)
H - Other (explain)
- 3.
METHOD:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2