ML020580323

From kanterella
Jump to navigation Jump to search
Submittal of Sequoyah Nuclear Plant, Units 1 & 2 Physical Security/Contingency Plan (Psp/Cp), Revision 10. Without Enclosure
ML020580323
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/29/2002
From: Salas P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML020580323 (2)


Text

SAFEGUARDS INFORMATION Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy,_Tennessee 37384-2000 SoddyWDaisrenese 3 738 A200 January 29, 2002 U.S. Nuclear Regulatory Com ATTN:

Document Control Des Washington, D.C. 20555 NAYIN DATE imission 10 CFR 50.54(p)

  • k Gentlemen:

In the Matter of Tennessee Valley Authority Docket Nos. 50-327 50-328 SEQUOYAH NUCLEAR PLANT -

UNITS 1 AND 2 -

PHYSICAL SECURITY /

CONTINGENCY PLAN (PSP/CP),

REVISION 10 This revision to the Sequoyah PSP/CP is being submitted pursuant to 10 CFR 50.54(p).

This revision incorporates alternate methods for verifying military service.

The material enclosed contains safeguards information as defined by 10 CFR 73.21, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.

The material enclosed also contains safeguards material.

Therefore, the material should be withheld from public disclosure in accordance with 10 CFR 2.790(d) (1).

This letter is being sent in accordance with NRC RIS 2001-05.

The information is being sent by certified mail.

The signed receipt will signify that you have received this information and acknowledge that it contains safeguards material that is to be protected in accordance with 10 CFR 73.21.

WHEN SEPARATED FROM THE ATTACHED, THIS PAGE IS DECONTROLLED.

SAFEGUARDS INFORMATION dnnted on recyclel paper

) )

U.S. Nuclear Regulatory Commission Page 2 January 29, 2002 SAFEGUARDS INFORMATION If you have any questions concerning this matter, please telephone me at (423) 843-7170 or J.

D. Smith at (423) 843-6672.

ensi and Industry Affairs Manager Enclosure WHEN SEPARATED FROM THE ATTACHED, THIS PAGE IS DECONTROLLED.

SAFEGUARDS INFORMATION