Summary of November 6-8, 2001 Public Meeting with NMC Staff to Discuss and Quantify Certain Human Failure Events (Hfes) Relevant to Hypothetical Pressurized Thermal Shock (PTS) Events at PnpML020570292 |
Person / Time |
---|
Site: |
Palisades |
---|
Issue date: |
02/25/2002 |
---|
From: |
Woods H NRC/RES/DRAA/PRAB |
---|
To: |
|
---|
References |
---|
TAC MB3219 |
Download: ML020570292 (3) |
|
|
---|
Category:Meeting Summary
MONTHYEARML24303A1162024-11-0606 November 2024 Summary of Meeting with Holtec Decommissioning International, LLC Regarding LAR Request to Approve the Biasi Critical Heat Flux Correlation for Use with the Main Steam Line Break Analysis to Support Potential ML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24257A0582024-09-26026 September 2024 Summary of August 1, 2024, Hybrid Public Meeting on the Potential Palisades Nuclear Plant Restart ML24212A0592024-08-0606 August 2024 May 15, 2024, Summary of Meeting with Holtec Decommissioning International,Llc Regarding LAR to Approve Biasi Critical Heat Flux Correlation for Use with Main Steam Line Break Analysis to Support Potential Reauthorization of Power Operation ML24166A2912024-06-25025 June 2024 April 29, 2024, Summary of Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit a Quality Assurance Program Manual to Support Potential Reauthorization of Power Operations at Palisades Nuclear Plant ML24141A0632024-05-23023 May 2024 Summary of April 17, 2024, Hybrid Public Outreach Meeting ML24089A2472024-04-0808 April 2024 March 18, 2024, Summary of Pre-Submittal Meeting with Holtec Decommissioning International, LLC Regarding Proposed Emergency Plan for Resumption of Power Operations at the Palisades Nuclear Plant ML24051A0942024-02-27027 February 2024 Summary of February 6, 2024, Pre-Submittal Meeting with Holtec Decommissioning International, LLC Regarding Technical Specifications Administrative Controls and Quality Assurance Program ML24016A0052024-01-23023 January 2024 Summary of Meeting with Holtec Decommissioning International, LLC, Regarding Power Operations Technical Specifications ML23303A2132023-11-0101 November 2023 Summary of Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit a License Transfer Request as Part of a Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML23263A0012023-09-27027 September 2023 Summary of August 29, 2023, Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit an Exemption Request as Part of a Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclea ML23171B1222023-06-22022 June 2023 Summary of Meeting with Holtec Decommissioning International, LLC Regarding Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML23107A1212023-04-20020 April 2023 Summary of Meeting with Holtec Decommissioning International, Llc Regarding Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML22292A2612022-10-31031 October 2022 PSDAR Meeting Summary ML22132A0892022-05-12012 May 2022 Summary of the April 26, 2022, Public Outreach to Discuss the NRC 2021 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML21200A2262021-07-19019 July 2021 Summary of the July 1, 2021, Public Outreach to Discuss the NRC 2020 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML21145A0482021-06-0202 June 2021 Summary of May 12, 2021, Teleconference with Entergy Nuclear Operations, Inc. to Discuss Potential License Amendment Request Related to Permanently Defueled Technical Specifications for Palisades Nuclear Plant ML21012A0382021-01-14014 January 2021 December 8, 2020, Summary of Public Teleconference with Entergy Nuclear Operations Inc. Regarding Pre-submittal of a License Transfer Application to Holtec International for Palisades Nuclear Plant ML20309A2372020-11-0606 November 2020 Summary of Public Teleconference with Entergy Nuclear Operations, Inc. to Discuss Future Request for One-Time Exemption from Certain Requirements of 10 CFR 50, Appendix E, Section Iv.F. at Palisades Nuclear Plant (EPID L-2020-LRM-0091 ML20304A1442020-11-0202 November 2020 Summary of September 21, 2020, Public Teleconference with Entergy Nuclear Operations Inc. Regarding a Proposed Alternative for Repair of Reactor Vessel Head Penetrations for Palisades Nuclear Plant ML20280A6952020-10-13013 October 2020 Letter - Palisades Nuclear Plant- Summary of September 11, 2020, Conference Call with Entergy Nuclear Operations Inc. Regarding the Fall 2020 Steam Generator Tube Inspections at Palisades Nuclear Plant EPID L-2020-LRO-0051 ML20280A6962020-10-13013 October 2020 20200912 NRC Mid Outage Q and a for Phone Call for Palisades 1R27 (Revised) ML20280A6972020-10-13013 October 2020 20200910 NRC Mid Outage Q and a for Phone Call for Palisades 1R27-Entergy Responses ML20231A2202020-08-17017 August 2020 Summary of Public Webinar to Discuss the NRC 2019 End-Of-Cycle Plant Performance Assessment of the Palisades Nuclear Plant ML19296D0632019-11-0101 November 2019 August 2019 Palisades NEIMA 108 Public Meeting Summary ML19136A2552019-05-16016 May 2019 Summary of the Public Outreach/Open House to Discuss the NRC 2018 End-of-Cycle Plant Performance Assessment of the Palisades Nuclear Plant ML18351A2382018-12-18018 December 2018 Summary of Public Teleconference Call with Entergy Nuclear Operations. Inc., Regarding Emergent Alternative Request for Repair of Central Rod Drive Nozzles at Palisades Nuclear Plant ML18340A0072018-12-0606 December 2018 Summary of Call with Entergy Nuclear Operations, Inc. - Verbal Authorization of Request for Alternative for the Repair of Reactor Vessel Closure Head Penetrations ML18268A2802018-09-26026 September 2018 Summary of Public Teleconference Call with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Relocate Surveillance Frequencies to Licensee Control ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML18113A6592018-04-23023 April 2018 Summary of Open House to Discuss the 2017 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML18008A2302018-01-10010 January 2018 Summary of Public Teleconference Meeting with Entergy Nuclear Operations, Inc., Regarding Request to Extend Enforcement Discretion for Tornado-Generated Missile Non-Conformances at Palisades Nuclear Plant ML17335A0262017-12-0505 December 2017 Summary of November 27, 2017 Public Meeting with Entergy Nuclear Operations, Inc. Regarding Request to Extend Enforcement Discretion for Tornado Missle Non-Confomances ML17338B0502017-12-0505 December 2017 Summary of November 28, 2017, Public Meeting with Entergy Nuclear Operations, Inc. Regarding a Potential Request Associated with an Alternative to the Reexamination Frequency for a Relevant Condition ML17227A2742017-08-14014 August 2017 Summary of the July 26, 2017, Public Meeting Regarding Palisades Nuclear Plant ML17173A7672017-07-28028 July 2017 Summary of 6/20/2017 Meeting with Entergy to Discuss Plan for Decommissioning Licensing Actions of Palisades, Pilgrim, Indian Point, Units 2 and 3, and Vermont Yankee ML17164A3112017-06-27027 June 2017 Summary of 06/12/2017, Pre-Submittal Meeting with Entergy Nuclear Operations, Inc. to Discuss Palisades Nuclear Plant Post Shutdown Emergency Plan and Administrative Technical Specification License Amendment Request ML17160A1812017-06-14014 June 2017 Summary of Conference Call with Palisades Nuclear Plant Regarding the Spring 2017 Steam Generator Inspections ML17080A1492017-03-23023 March 2017 Summary of March 20, 2017, Public Meeting with Entergy Nuclear Operations, Inc. Regarding the Cyber Security Plan Implementation Schedule ML16344A0862016-12-20020 December 2016 Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding National Fire Protection Association Standard 805 ML16277A6772016-10-11011 October 2016 Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding the Proposed Closure Plant for Generic Safety Issue 191, Assessment of Debris Accumulation on Pressurized Water Reactor (PWR) Sump Performance ML16182A5142016-06-30030 June 2016 Summary of the June 23, 2016, Public Meeting Regarding Palisades Nuclear Plant ML16127A1722016-05-0505 May 2016 6/23/16 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Palisades Nuclear Plant Performance for the 2015 Calendar Year ML16035A4252016-03-0101 March 2016 Summary of January 25, 2016, Pre-Application Teleconference Meeting with Entergy Nuclear Operations to Discuss a Forthcoming License Amendment Request Regarding Steam Generator Cold Leg Alternate Repair Criteria at Palisades Nuclear Plant ( ML15294A2972015-10-27027 October 2015 Steam Generator Tube Inspection Discussion During Palisades 2015 (RF24) Outage (Preliminary Information) ML15294A2922015-10-27027 October 2015 Summary of Conference Call with Palisades Nuclear Plant Regarding the Fall 2015 Steam Generator Inspections ML15272A0652015-09-30030 September 2015 Summary of Telephone Conference on September 28, 2015, Verbal Authorization of Relief Request for Palisades Nuclear Plant ML15261A0392015-09-21021 September 2015 September 17, 2015, Summary of Telephone Conference Verbal Authorization of Relief Request for Palisades Nuclear Plant ML15119A0442015-05-0606 May 2015 Summary of April 14, 2015, Meeting with Entergy Nuclear Operations, Inc. on Plans for Volumetric Examinations of Primary Coolant System Alloy 600 Welds 2024-09-26
[Table view] |
Text
February 25, 2002 LICENSEE: Nuclear Management Company, LLC (NMC)
FACILITY: Palisades Nuclear Plant (PNP)
SUBJECT:
SUMMARY
OF NOVEMBER 6-8, 2001, PUBLIC MEETING WITH NMC STAFF TO DISCUSS AND QUANTIFY CERTAIN HUMAN FAILURE EVENTS (HFEs)
RELEVANT TO HYPOTHETICAL PRESSURIZED THERMAL SHOCK (PTS)
EVENTS AT PNP (TAC NO. MB3219)
Background:
The NRC staff and its contractors, with the active cooperation and participation of the nuclear industry, are currently conducting a re-analysis of the risk due to PTS at U.S. Pressurized Water Reactors (PWRs). The results will be used as part of the bases for a subsequent re-evaluation (and possible change) of the PTS rule, 10 CFR 50.61. PNP is one of the four PWRs that have volunteered to participate in this effort.
At two of the four plants (Oconee and Beaver Valley), the NRC staff and its contractors are currently in the process of performing all portions of the re-analysis based, in part, on information obtained from those plants (i.e., they are performing the Probabilistic Risk Analysis (PRA), Human Reliability Analysis (HRA), Thermal Hydraulic (TH), and Probabilistic Fracture Mechanics (PFM) portions of those analyses).
At the other two plants (Palisades and Calvert Cliffs), the PRA/HRA portion of the analyses will be performed by the licensee and reviewed by the NRC staff and its contractors (the review will be based, in part, on information obtained from those plants). After modification (if necessary) by the licensee and/or the NRC staff and its contractors, the PRA/HRA will be used, along with TH and PFM analyses performed by the NRC and its contractors, to determine the risk due to PTS at those plants.
Discussion:
On November 6-8, 2001, NRC Office of Nuclear Regulatory Research (RES) staff and their contractors [Sandia National Laboratory (SNL), Science Applications International Corp. (SAIC),
and Buttonwood Consulting Co. (BCC)] met near the PNP site with NMC staff to discuss and quantify human failure events (HFEs), which are parameters related to human performance that are used as input to the probabilistic risk analysis (PRA) of hypothetical Pressurized Thermal Shock (PTS) events at Palisades.
The meeting started with a presentation by the SNL and SAIC representatives describing the elicitation method that would be used during the remainder of the meeting to quantify the HFEs (slides used during the presentation are attached).
The remainder of the meeting consisted of using the described elicitation process to quantify the needed HFEs. The process was applied by first having RES' SAIC contractor
representative carefully define the assumptions to be made for each specific HFE (e.g.,
regarding out-of-service or randomly failed equipment), and then by having selected representatives of the RES contractors and selected representatives of the Palisades staff (which included licensed operators, operator trainers, and PRA practitioners) each individually estimate the HFE and its uncertainty. The entire group then discussed the individual estimates, and those whose estimates differed significantly defended (and in some cases changed) their estimates. The significant differences were most often between a group consisting of one RES contractor and one licensee staff member, and another group with similar composition (i.e.,
differences typically were not between licensee and NRC). For all HFEs considered, this process resulted in unanimous endorsement of an HFE and associated uncertainty by the group.
This establishment of HFEs acceptable to the group as a whole was possible because the chosen elicitation method was suitable for this purpose, and because all of the meeting attendees quickly established a cordial working synergy with excellent mutual respect and cooperation.
The NRC staff and its contractors expressed appreciation for the cooperation and support of the Palisades staff during the meeting. The NRC staff believes that the meeting provided a significant contribution to the process of performing improved PTS risk analyses at Palisades.
This meeting was not an inspection. Instead, it was an information gathering meeting with a licensee who has volunteered to cooperate with NRC's PTS re-evaluation effort. As such, no open items were identified that require future actions or NRC approvals.
Hugh W. Woods, Senior Task Manager Probabilistic Risk Analysis Branch Division of Risk Analysis and Applications Office of Nuclear Regulatory Research Docket No. 50-255
Enclosures:
- 1. List of Attendees
- 2. Slides used at the meeting cc: w/encls: See next page DOCUMENT NAME:g:\pts\2ndpalmtgmins.wpd
OAR in ADAMS? (Y or N) Y ADAMS ACCESSION NO.: TEMPLATE NO. RES-Publicly Available? (Y or N) Y DATE OF RELEASE TO PUBLIC Immediate SENSITIVE? N To receive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy OFFICE DRAA/PRAB DRAA/PRAB DRAA/PRAB NRR/DLPM/LPD3 NAME H. Woods M. Cunningham S. Newberry D. Hood DATE 02/15/02 02/15/02 02/19/02 02/25/02 (RES File Code) RES -2C-1A DISTRIBUTION:
PUBLIC PDIII-1 Reading BSheron JZwolinski/S. Black SBajwa WReckley RBouling JStrasma, RIII MRing, RIII DHood MSatorius, EDO AVegel, RIII HWoods, RES DBessette, RES EThornsbury, RES MCunningham MMayfield SMalik NChokshi JRosenthal
LIST OF ATTENDEES PUBLIC MEETING WITH NMC STAFF TO DISCUSS AND QUANTIFY CERTAIN HUMAN FAILURE EVENTS (HFEs) RELEVANT TO HYPOTHETICAL PRESSURIZED THERMAL SHOCK (PTS) EVENTS AT PNP NOVEMBER 6-8, 2001 NAME ORGANIZATION Roy Woods NRC/RES John Forester Sandia National Lab. (SNL)
Alan Kolaczkowski Science Applications International Corp. (SAIC)
Dennis Bley Buttonwood Consulting Co.
Brian Brogan Nuclear Management Company, LLC (NMC)
Christer Dahlgren Nuclear Management Company, LLC (NMC)
George Sleeper Nuclear Management Company, LLC (NMC)
John Kneeland Nuclear Management Company, LLC (NMC)
Mark Cimock Nuclear Management Company, LLC (NMC)
Dave Blanchard Nuclear Management Company, LLC (NMC)
Gregg Baustian Nuclear Management Company, LLC (NMC)
Robert Tucker Nuclear Management Company, LLC (NMC)