ML020570233

From kanterella
Jump to navigation Jump to search
NRC Initial Licensing Examination Report 50-416/02-301, Scheduled for Week of 08/26/2002
ML020570233
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 02/23/2002
From: Gody A
Operations Branch IV
To: Eaton W
Entergy Operations
References
IR-02-301
Download: ML020570233 (5)


See also: IR 05000416/2002301

Text

February 23, 2002

William A. Eaton, Vice President

Operations - Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

SUBJECT:

GRAND GULF NUCLEAR STATION - NRC INITIAL LICENSING EXAMINATION

REPORT 50-416/02-301

Dear Mr. Eaton:

In a telephone conversation on February 20, 2002, between Messrs. Mike Rausch, Senior

Operations Instructor, and Michael Murphy, Chief Examiner, arrangements were made for the

administration of an initial licensing examination at Grand Gulf Nuclear Station during the week

of August 26, 2002.

As agreed during the telephone conversation, your staff will prepare the examination based on

the guidelines in Revision 8 and Supplement 1, of NUREG-1021, "Operator Licensing

Examination Standards for Power Reactors." The NRC regional office will discuss with your

staff any changes that might be necessary before the examination is administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by April 28, 2002. The draft examination with supporting reference materials, as

discussed, will be due by June 27, 2002. Pursuant to 10 CFR 55.40(b)(3), an authorized

representative of the facility licensee shall approve the outlines, and examinations before they

are submitted to the NRC for review and approval. All materials shall be complete and ready-

to-use. Any delay in receiving the required examination and reference materials, or the

submittal of inadequate or incomplete materials, may cause the examinations to be

rescheduled. A validation of the final examination material will be conducted at your facility the

week of August 12, 2002.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

Entergy Operations, Inc.

-2-

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget,

OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number 3150-0018, which expires on April 30, 2003. The

public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per

response, including the time for reviewing instructions, gathering and maintaining the data

needed, writing the examinations, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for

reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-001, or by Internet electronic mail at

BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs,

NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure(s), and your response will be made available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Rausch has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Michael Murphy at 817-860-8152 , or

Mr. A. T. Gody at 817-860-8159.

Sincerely,

/RA/

Anthony T. Gody, Chief

Operations Branch

Division of Reactor Safety

Docket No.: 50-416

License No.: NPF-29

Entergy Operations, Inc.

-3-

cc:

Executive Vice President

and Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

Winston & Strawn

1400 L Street, N.W. - 12th Floor

Washington, DC 20005-3502

Sam Mabry, Director

Division of Solid Waste Management

Mississippi Department of Natural

Resources

P.O. Box 10385

Jackson, Mississippi 39209

President, District 1

Claiborne County Board of Supervisors

P.O. Box 339

Port Gibson, Mississippi 39150

General Manager

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

The Honorable Richard Ieyoub

Attorney General

Department of Justice

State of Louisiana

P.O. Box 94005

Baton Rouge, Louisiana 70804-9005

Office of the Governor

State of Mississippi

Jackson, Mississippi 39201

Entergy Operations, Inc.

-4-

Mike Moore, Attorney General

Frank Spencer, Asst. Attorney General

State of Mississippi

P.O. Box 22947

Jackson, Mississippi 39225

Dr. F. E. Thompson, Jr.

State Health Officer

State Board of Health

P.O. Box 1700

Jackson, Mississippi 39205

Robert W. Goff, Program Director

Division of Radiological Health

Mississippi Dept. of Health

P.O. Box 1700

Jackson, Mississippi 39215-1700

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Director, Nuclear Safety

and Regulatory Affairs

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

Vice President, Operations

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

Entergy Operations, Inc.

-5-

Electronic distribution from ADAMS by RIV:

Regional Administrator (EWM)

DRP Director (KEB)

DRS Director (ATH)

Senior Resident Inspector (JLD)

Branch Chief, DRP/A (JIT)

Senior Project Engineer, DRP/A (DNG)

Branch Chief, DRP/TSS (PHH)

RITS Coordinator (NBH)

SRE:OB

C:OB

MEMurphy/lmb

ATGody

/RA/

/RA/

02/21/02

02/23 /02

OFFICIAL RECORD COPY

T=Telephone E=E-mail F=Fax