ML020570233
| ML020570233 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 02/23/2002 |
| From: | Gody A Operations Branch IV |
| To: | Eaton W Entergy Operations |
| References | |
| IR-02-301 | |
| Download: ML020570233 (5) | |
See also: IR 05000416/2002301
Text
February 23, 2002
William A. Eaton, Vice President
Operations - Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
SUBJECT:
GRAND GULF NUCLEAR STATION - NRC INITIAL LICENSING EXAMINATION
REPORT 50-416/02-301
Dear Mr. Eaton:
In a telephone conversation on February 20, 2002, between Messrs. Mike Rausch, Senior
Operations Instructor, and Michael Murphy, Chief Examiner, arrangements were made for the
administration of an initial licensing examination at Grand Gulf Nuclear Station during the week
of August 26, 2002.
As agreed during the telephone conversation, your staff will prepare the examination based on
the guidelines in Revision 8 and Supplement 1, of NUREG-1021, "Operator Licensing
Examination Standards for Power Reactors." The NRC regional office will discuss with your
staff any changes that might be necessary before the examination is administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by April 28, 2002. The draft examination with supporting reference materials, as
discussed, will be due by June 27, 2002. Pursuant to 10 CFR 55.40(b)(3), an authorized
representative of the facility licensee shall approve the outlines, and examinations before they
are submitted to the NRC for review and approval. All materials shall be complete and ready-
to-use. Any delay in receiving the required examination and reference materials, or the
submittal of inadequate or incomplete materials, may cause the examinations to be
rescheduled. A validation of the final examination material will be conducted at your facility the
week of August 12, 2002.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
Entergy Operations, Inc.
-2-
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget,
OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number 3150-0018, which expires on April 30, 2003. The
public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per
response, including the time for reviewing instructions, gathering and maintaining the data
needed, writing the examinations, and completing and reviewing the collection of information.
Send comments on any aspect of this collection of information, including suggestions for
reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-001, or by Internet electronic mail at
BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs,
NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its
enclosure(s), and your response will be made available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Rausch has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Michael Murphy at 817-860-8152 , or
Mr. A. T. Gody at 817-860-8159.
Sincerely,
/RA/
Anthony T. Gody, Chief
Operations Branch
Division of Reactor Safety
Docket No.: 50-416
License No.: NPF-29
Entergy Operations, Inc.
-3-
cc:
Executive Vice President
and Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, Mississippi 39205
Winston & Strawn
1400 L Street, N.W. - 12th Floor
Washington, DC 20005-3502
Sam Mabry, Director
Division of Solid Waste Management
Mississippi Department of Natural
Resources
P.O. Box 10385
Jackson, Mississippi 39209
President, District 1
Claiborne County Board of Supervisors
P.O. Box 339
Port Gibson, Mississippi 39150
General Manager
Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
The Honorable Richard Ieyoub
Attorney General
Department of Justice
State of Louisiana
P.O. Box 94005
Baton Rouge, Louisiana 70804-9005
Office of the Governor
State of Mississippi
Jackson, Mississippi 39201
Entergy Operations, Inc.
-4-
Mike Moore, Attorney General
Frank Spencer, Asst. Attorney General
State of Mississippi
P.O. Box 22947
Jackson, Mississippi 39225
Dr. F. E. Thompson, Jr.
State Health Officer
State Board of Health
P.O. Box 1700
Jackson, Mississippi 39205
Robert W. Goff, Program Director
Division of Radiological Health
Mississippi Dept. of Health
P.O. Box 1700
Jackson, Mississippi 39215-1700
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Director, Nuclear Safety
and Regulatory Affairs
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
Vice President, Operations
Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
Entergy Operations, Inc.
-5-
Electronic distribution from ADAMS by RIV:
Regional Administrator (EWM)
DRP Director (KEB)
DRS Director (ATH)
Senior Resident Inspector (JLD)
Branch Chief, DRP/A (JIT)
Senior Project Engineer, DRP/A (DNG)
Branch Chief, DRP/TSS (PHH)
RITS Coordinator (NBH)
SRE:OB
C:OB
MEMurphy/lmb
ATGody
/RA/
/RA/
02/21/02
02/23 /02
OFFICIAL RECORD COPY
T=Telephone E=E-mail F=Fax