Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1373 INDIANA MICHIGAN POWER February 22, 2002 AEP:NRC:2691-01 10 CFR 26.71(d)
Docket Nos:
50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 10 CFR PART 26, FITNESS FOR DUTY PROGRAM In accordance with 10 CFR 26.71(d), Fitness for Duty Program, this submittal represents the Donald C. Cook Nuclear Plant Fitness for Duty Program performance data for the six-month period from July 1, 2001, to December 31, 2001. Attached are performance data sheets that include statistics on the various categories of testing, substances for which testing is conducted, and a summary of management actions.
There are no new commitments in this submittal.
Should you have any questions, please contact Mr. Gordon P. Arent, Manager of Regulatory Affairs, at (616) 697-5553.
Sincerely, S. A. Greenlee Director of Nuclear Technical Services
/jen Attachment c:
K. D. Curry, w/o attachment J. E. Dyer MDEQ - DW & RPD, w/o attachment NRC Resident Inspector R. Whale, w/o attachment
Attachment to AEP:NRC:2691-01 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR26 Indiana Michigan Power Co.
Company Cook Nuclear Plant, Bridgman, Michigan Location K. E. Burkett Contact Name Cutoffs: Screen/Confirmation (ng/ml)
Marijuana 50/15 Amphetamine Cocaine 300/150 Phencyclidine Opiates 300/300 Alcohol (%BAC) 12/31/01 6 Month Ending (616) 466-3335 F Appendix A 1000/500 25/25 0.04%
Phone to 10CFR26 N/A N/A N/A N/A N/A N/A Testing Results Licensee Long-Term Short-Term Employees Contractor Contractor Personnel Personnel Average Number with 1382 151 498 Unescorted Access Categories#
Tested Positive Tested Positive Tested Positive Pre-Access 42 0
64 0
672 5
For-Cause 4
0 3
0 4
0 Post Accident For-Cause 20 1
5 0
5 1
Observed Behavior Random 475 0
36 0
143 2
Follow-Up 40 0
1 0
24 0
Other 18 0
2 0
1 0
Total 599 1
111 0
849 8
Page 1
Attachment to AEP:NRC:2691--01 BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES Marijuana Cocaine Opiates Amphetamines Phencyclidene Alcohol Refusal Marijuana Adulterated 50 100 To Test Suspect Specimen Specimen Licensee Employee 0
0 0
0 0
0 1
0 0
0 Long-Term 0
0 0
0 0
0 0
0 0
0 Contractors Short-Term 1
3 1
0 0
0 2
1 0
0 Contractors Total 1
3 1
0 0
0 3
1 0
0 Total Confirmed Positive Tests For All Specific Substances, Refusals to Test and Adulterated Specimens:
9 Page 2
Attachment to AEP:NRC:2691-01 MANAGEMENT ACTIONS:
A meeting was held with laboratory, collection site, Medical Review Officer(s),
Employee Assistance Program staff, and psychological assessment personnel to assure consistent and effective implementation of the fitness for duty (FFD) program.
The canine program continues to be a constant reminder to plant personnel of Donald C. Cook Nuclear Plant's (CNP) commitment to maintain a drug-free work environment.
APPEALS:
Three appeals were received during this reporting period. The appeal process at CNP provides notice and an opportunity to provide additional information for an impartial management review. The appeals review board denied the appeals and determined the tests reported were accurate and the subsequent denial of access was appropriate.
EVENTS:
There were two events identified as 24-hour reportable in accordance with 10 CFR 26.73 during this reporting period: one AEP supervisor for-cause testing and one contractor supervisor random testing.
TEMPORARY SUSPENSIONS:
No temporary suspensions or administrative actions were taken against individuals based on on-site presumptive positive drug results.
Page 3