FENOC FirstEnergy,Vucear OperatingCo'rnpany L-02-015 February 7, 2002 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:
In accordance with NCR Generic Letter 97-02, "Revised Contents of the Monthly Operating Report," and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of January 2002.
Respectfully, Lew W. Myers Senior Vice-President - Nuclear DTJ/hkh Enclosures C:
NRC Regional Office King of Prussia, PA
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD:
50-334 BVPS Unit #1 February 4, 2002 David T. Jones (724) 682-4962 Januarv 2002 No.
Date Type Duration Reason Method of Cause / Corrective Actions (D/M/Y)
F: Forced (Hours)
(1)
Shutting S: Scheduled Down (2)
Comments NONE.
(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output until 1358 hours0.0157 days <br />0.377 hours <br />0.00225 weeks <br />5.16719e-4 months <br /> on 1/31/02 when a load reduction to approximately 70% output was commenced. This was being done in order to permit repair of the "B" Heater Drain Tank Normal Level Control Valve that had failed almost fully closed. An output of approximately 70% was achieved at 1450 hours0.0168 days <br />0.403 hours <br />0.0024 weeks <br />5.51725e-4 months <br /> on 1/31/02. The Unit continued to operate at approximately 70% output for the remainder of the report period.
Following repair of the valve and satisfactorily post-maintenance testing, the Unit commenced to return to full power at 0010 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> on 2/1/02. A nominal output of 100% was achieved at 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> on 2/1/02.
OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
REPORT DATE:
COMPLETED BY:
TELEPHONE:
REPORTING PERIOD:
JANUARY 2002 DESIGN ELECTRICAL RATING (Net MWe):
MAX.
DEPENDABLE CAPACITY (Net MWe):
50-334 BVPS UNIT #1 02/04/02 DAVID T. JONES (724) 682-4962
"* Notes:
Rated thermal power at
"* BVPS-I was uprated from 2652 MWt'
"* to 2689 MWt on 10/20/01.
Net
"* MDC was also uprated from
"* 810 XWe to 821 MWe.
835 821 HOURS IN REPORTING PERIOD:
NO.
OF HRS.
REACTOR WAS CRITICAL:
SERVICE HOURS GENERATOR ON LINE:
UNIT RESERVE SHUTDOWN HOURS:
NET ELECTRICAL ENERGY GEN.
(MWH):
GROSS ELECT.
ENERGY GEN.
(MWH):
GROSS THERMAL ENERGY GEN.
(MWH):
UNIT AVAILABILITY FACTOR (M):
UNIT CAPACITY FACTOR (MDC)
(M):
UNIT FORCED OUTAGE RATE
(%):
THIS MONTH 744.0 744.0 744.0 0.0 619500.0 655440.0 1990211.0 100.0 101.4 0.0 YEAR TO DATE 744.0 744.0 744.0 0.0 619500.0 655440.0 1990211.0 100.0 101.4 0.0 CUMULATIVE 225768.0 152825.5 150365.9 0.0 112285643.0 119922226.0 369625016.5 68.1 63.3 16.3 la.
- 1.
2.
3a.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
11.
UNIT SHUTDOWNS DOCKET NO.
50-412 UNIT NAME BVPS Unit #2 DATE February 4, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD:
January 2002 No.
Date Type Duration Reason Method of Cause I Corrective Actions (D/M/Y)
F: Forced (Hours)
(1)
Shutting S: Scheduled Down (2)
Comments NONE.
(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip ( Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Ucense Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
S......................................................................................................................................................
SUMMARY
The Unit operated at a nominal value of 100% output for the entire report period.
OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
REPORT DATE:
COMPLETED BY:
TELEPHONE:
REPORTING PERIOD:
JANUARY 2002 DESIGN ELECTRICAL RATING (Net We):
MAX.
DEPENDABLE CAPACITY (Net MWe):
836 831 50-412 BVPS UNIT #2 02/04/02 DAVID T.
JONES (724) 682-4962 Notes: Rated thermal power at BVPS-2 was uprated from 2652 MWt*
to 2689 Mwt on 10/30/01.
Net MDC was also uprated from 820 MWe to 831 MWe.
HOURS IN REPORTING PERIOD:
NO.
OF HRS.
REACTOR WAS CRITICAL:
SERVICE HOURS GENERATOR ON LINE:
UNIT RESERVE SHUTDOWN HOURS:
NET ELECTRICAL ENERGY GEN.
(MWH):
GROSS ELECT.
ENERGY GEN.
(MWH):
GROSS THERMAL ENERGY GEN.
(MWH):
UNIT AVAILABILITY FACTOR (M):
UNIT CAPACITY FACTOR (MDC)
(M):
UNIT FORCED OUTAGE RATE
(%):
THIS MONTH 744.0 744.0 744.0 0.0 631804.0 664069.0 1997170.0 100.0 102.2 0.0 YEAR TO DATE 744.0 744.0 744.0 0.0 631804.0 664069.0 1997170.0 100.0 102.2 0.0 CUMULATIVE 124551.0 102098.5 101436.6 0.0 79209896.0 83738812.0 255404751.0 81.4 77.0 10.4 la.
- 1.
2.
3a.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
11.