ML020560008
| ML020560008 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 02/15/2002 |
| From: | Jacobs D Wolf Creek |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, WO 02-0010 | |
| Download: ML020560008 (3) | |
Text
LF CREEK
'NUCLEAR OPERATING CORPORATION Donna Jacobs Plant Manager FEB 1 5 2002 WO 02-0010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555
Subject:
Docket No. 50-482: January, 2002, Monthly Operating Report Gentlemen:
Attached to this letter is the January, 2002, Monthly Operating Report for the Wolf Creek Generating Station. This submittal is being made in accordance with the requirements of Wolf Creek Generating Station Technical Specification 5.6.4, "Monthly Operating Reports." This submittal also follows the guidance of Generic Letter 97-02, "Revised Contents of the Monthly Operating Report." If you have questions regarding this report, please contact me at (620) 364-4246, or Mr. Tony Harris at (620) 364-4038.
Very truly yours, Donn IJacobs DJ/pb Attachment cc:
J. N. Donohew (NRC), w/a W. D. Johnson (NRC), w/a E. W. Merschoff (NRC), w/a Senior Resident Inspector (NRC), w/a P.O. Box 411 ! Burlington, KS 66839 ! Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HC/VET
Attachment to WO 02-0010 Page 1 of 2 OPERATING DATA REPORT Report Number: 203 DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-482 Wolf Creek Generating Station February 5, 2002 J. L. Yunk 620-364-8831, X4561 REPORT MONTH: January, 2002
- 1.
Design Electrical Rating (MWe - Net):
1170
- 2.
Maximum Dependable Capacity (MWe - Net):
1170 This Month Year to Date Cumulative
- 3.
Number of Hours Reactor Critical:
744.0 744.0 123,108.7
- 4.
Number of Hours Generator On-Line:
744.0 744.0 121,994.2
- 5.
Unit Reserve Shutdown Hours:
0.0 0.0 339.8
- 6.
Net Electrical Energy Generated (MWH) 888,357 888,357 137,925,359 Wolf Creek Generating Station Monthly Operating Report January, 2002 Page 1 of 2
Attachment to WO 02-0010 Page 2 of 2 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-482 Wolf Creek Generating Station February 5, 2002 J. L. Yunk 620-364-8831, X4561
SUMMARY
The unit operated at approximately 100% power January 1, 2002, through January 31, 2002.
A: EQUIPMENT FAILURE (EXPLAIN)
B: MAINTENANCE OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)
H: OTHER (EXPLAIN)
(2) METHOD: 1. MANUAL
- 2. MANUAL SCRAM
- 3. AUTOMATIC SCRAM
- 4. CONTINUATION
- 5. OTHER Wolf Creek Generating Station Monthly Operating Report January, 2002 Page 2 of 2 Type METHOD OF SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS/COMMENTS No.
Date
&: SCHEDULED (Hours)
(1)
(2)
N/A N/A N/A N/A N/A N/A N/A (1) REASON: