ML020530246

From kanterella
Jump to navigation Jump to search
Notification of Implementation of Revision 29 to Seabrook Station Physical Security Plan, Revision 13 to Safeguards Contingency Plan & Revision 13 to Training & Qualification Plan
ML020530246
Person / Time
Site: Seabrook 
Issue date: 01/11/2002
From: Peschel J
North Atlantic Energy Service Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NYN-02005
Download: ML020530246 (1)


Text

        • SAFEGUARDS INFORMATION ****

WHEN SEPARATED FROM ENCLOSURES, HANDLE THIS DOCUMENT AS DECONTROLLED North Atlantic Energy Service Corporation

_NorthP.O.

Box 300 No t Seabrook, NH 03874 Atlantic (603) 474-9521 The Northeast Utilities System January 11, 2002 Docket No. 50-443 NYN-02005 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station Revision 29 to the Seabrook Station Physical Security Plan, Revision 13 to the Safeguards Contingency Plan and Revision 13 to the Training and Qualification Plan North Atlantic Energy Service Corporation (North Atlantic) has implemented, pursuant to 10 CFR 50.54 (p)(2), Revision 29 to the Seabrook Station Physical Security Plan, Revision 13 to the Safeguards Contingency Plan and Revision 13 to the Training and Qualification Plan. North Atlantic has determined that the revisions do not decrease the effectiveness of the Physical Security Plan, the Safeguards Contingency Plan or the Training and Qualification Plan. Enclosure 1 contains the revisions to the above plans.

The enclosures to this letter contain Safeguards Information and as such should be withheld from public disclosure in accordance with 10 CFR 73.21. This cover letter does not contain Safeguards Information and reverts to unclassified when separated from the enclosure.

Should you have any questions regarding these changes, please contact Mr. James Pandolfo, Security Manager, at (603) 773-7047.

Very truly yours, NORTH ATLANTIC ENERGY SERVICE CORP.

cc:

H. J. Miller, NRC Region I Administrator (with enclosure)

G.F. Wunder, NRC Project Manager, Project Directorate 1-2 (without enclosure)

G.T. Dentel, NRC Senior Resident Inspector (without enclosure)

SAFEGUARDS INFORMATION ****

WHEN SEPARATED FROM ENCLOSURES, HANDLE THIS DOCUMENT AS DECONTROLLED