ML020520681

From kanterella
Jump to navigation Jump to search
Re Initial Licensing Examination Week of October 20, 2003
ML020520681
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/20/2002
From: Dave Hills
Division of Reactor Safety III
To: Reddemann M
Nuclear Management Co
References
Download: ML020520681 (4)


Text

February 20, 2002 Mr. M. Reddemann Site Vice President Kewaunee and Point Beach Nuclear Plants Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241

Dear Mr. Reddemann:

In response to your facility management letter dated September 27, 2001, and as augmented by discussions with Chuck Sizemore of your staff on January 10, 2002, we have tentatively scheduled an initial licensing examination for your operator license applicants at the Point Beach Nuclear Plant during the week of October 20, 2003. Validation of the examination will occur at the station during the week of September 1, 2003. In the unlikely event that we are unable to support the examination during the scheduled week, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

As stated in your letter, your staff will develop the examination. To support the examination administration date, we have tentatively scheduled the date of August 18, 2003, to begin our review of your submitted examination.

Please also inform us at your earliest opportunity if you discover you are unable to support the examination on the scheduled dates.

Once your staff has determined a schedule for examination development, please have them contact the Chief Examiner to arrange for a suitable examination outline submittal date for NRC review. The intent is for the examination outline to be submitted early in the examination development process. This is to preclude the need to make significant changes to developed examination material as a result of the NRC review of the outline.

Dell McNeil has been tentatively assigned as the Chief Examiner and can be reached at 630-829-9737.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination outlining examination security expectations, listing the materials required by the NRC to conduct the examination, reconfirming the examination dates, and reconfirming the number of candidates you have in the training program. If you have any questions concerning this information, please contact Dell McNeil of my staff at 630-829-9737.

M. Reddemann In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc:

R. Grigg, President and Chief Operating Officer, WEPCo R. Anderson, Executive Vice President and Chief Nuclear Officer T. Webb, Licensing Manager D. Weaver, Nuclear Asset Manager T. Taylor, Plant Manager A. Cayia, Site Director J. ONeill, Jr., Shaw, Pittman, Potts & Trowbridge K. Duveneck, Town Chairman Town of Two Creeks D. Graham, Director Bureau of Field Operations A. Bie, Chairperson, Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission State Liaison Officer W. Walker, Training Department

M. Reddemann In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc:

R. Grigg, President and Chief Operating Officer, WEPCo R. Anderson, Executive Vice President and Chief Nuclear Officer T. Webb, Licensing Manager D. Weaver, Nuclear Asset Manager T. Taylor, Plant Manager A. Cayia, Site Director J. ONeill, Jr., Shaw, Pittman, Potts & Trowbridge K. Duveneck, Town Chairman Town of Two Creeks D. Graham, Director Bureau of Field Operations A. Bie, Chairperson, Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission State Liaison Officer W. Walker, Training Department DOCUMENT NAME: G:\\DRS\\POI022002DRS.wpd To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII:DRS RIII:DRS RIII:DRS NAME MABies:sd DRMcNeil DEHills DATE 02/08/02 02/19/02 02/20/02 OFFICIAL RECORD COPY

M. Reddemann ADAMS Distribution:

WDR DFT BAW RidsNrrDipmIipb GEG HBC PGK1 DRPIII DRSIII PLB1 JRK1 DCT M. A. Bies, DRS