0 FPL Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 February 13, 2002 L-2002-034 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the January 2002 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.
Please contact us should there be any questions regarding this information.
Very truly yours, onald E. Jernigan Vice President St. Lucie Plant DEJ/spt Attachments 7
an FPL Group company
DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 St. Lucie Unit 1 Feb. 5, 2002 J. A. Rogers (561) 467-7296 REPORTING PERIOD: January 2002
- 1. Design Electrical Rating (Mwe-Net).
- 2. Maximum Dependable Capacity (Mwe-Net)
- 3. Number of Hours Reactor Critical
- 4. Number of Hours Generator On Line
- 5. Unit Reserve Shutdown Hours
- 6. Net Electrical Energy (MWH) 830 839 MONTH 744 744 0.0 639078
-YTD 744 744 0.0 639078 CUMULATIVE 177344.5 175531 0.0 143315817
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 St. Lucie #1 Feb. 5, 2002 J.A. Rogers (561) 467-7296 REPORT MONTH January 2002 Unit 1 operated at essentially full power through the entire month of January.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 St. Lucie #1 Feb.
5, 2002 J.A. Rogers (561) 467-7296 REPORT MONTH January 2002 Reason A - Equipment Failure (Explain)
B - Maintenance or Test C -
Refueling D - Regulatory Restriction E
- Operator Training & License Examination F - Administrative G - Operational Error (Explain)
H-Other (Explain) 3 Method 1
Manual 2 -
Manual Scram 3 - Automatic Scram 4 -
Continued 5 -
Load Reduction 9 - Other (Explain)
Number Date Type 1 Duration Reason 2 Method of Cause & Corrective (Hours)
Shutting Down Action to Reactor 3 Prevent Recurrence Unit I operated at essentially full power for the entire month of January.
I.
F Forced S
Scheduled 091567 PPL
DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie Unit 2 Feb. 5, 2002 J. A. Rogers (561) 467-7296 REPORTING PERIOD: January 2002
- 1. Design Electrical Rating (Mwe-Net).
- 2. Maximum Dependable Capacity (Mwe-Net)
- 3. Number of Hours Reactor Critical
- 4. Number of Hours Generator On Line
- 5. Unit Reserve Shutdown Hours
- 6. Net Electrical Energy (MWH).
830 839 MONTH 744 744 0.0 638063
-YTD 744 744 0.0 638063 CUMULATIVE 140757.2 139001.7 0.0 114368709
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie #2 Feb. 5, 2002 J.A. Rogers (561) 467-7296 REPORT MONTH January 2002 Unit 2 operated at essentially full power through the entire month of January.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie #2 Feb.5, 2002 J.A. Rogers (561) 467-7296 REPORT MONTH January 2002 Reason A - Equipment Failure (Explain)
B - Maintenance or Test C
Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 -
Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)
Cause & Corrective Action to Prevent Recurrence Unit 2 operated at essentially full power for the entire month of January.
F Forced S
Scheduled 2
091587 FPL