Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, WI 54216-9511 Two Rivers, WI 54241 NMC 920.388.2560 920.755.2321 Committed to Nuclear Excellence Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC 2002-0011 Bulletin 2001-01 January 28, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Ladies/Gentlemen:
Dockets 50-266 and 50-301 Point Beach Nuclear Plant, Units 1 and 2 Clarification Of Revised Response To NRC Bulletin 2001-01, Circumferential Cracking Of Reactor Pressure Vessel Head Penetration Nozzles Nuclear Management Company LLC (NMC), via letter dated January 3, 2002, licensee for Point Beach Nuclear Plant (PBNP), provided a revised response to NRC Bulletin 2001-01.
During a telephone conference between NMC representatives and the NRC staff on January 17, 2002, it was requested that we clarify the revised PBNP site-specific response to Bulletin Item 4.a. Specifically, we discussed the examination techniques planned to be used for reactor vessel head penetrations when effective visual examination results are indeterminate. During that conference call, we stated that we are still evaluating several techniques and expected to reach a final decision within a few weeks. We will notify the Commission of our decision on this issue by March 14, 2002.
Please contact us if there are questions or if additional information is needed.
Sincerely, Bak:. eddemann Site Vice President ADB/kmd cc:
NRC Resident Inspector NRR Project Manager NRC Regional Administrator PSCW