V. C. Summer Unit 1 - Correction to Amendment Decrease of Hot Channel Factor Exclusion Zone at Top and Bottom of Core, MB2052
ML020450697
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 02/13/2002
From: Edison G
NRC/NRR/DLPM/LPD2
To: Byrne S
South Carolina Electric & Gas Co
Edison G, NRR/DLPM, 415-1448
References
TAC MB2052
Download: ML020450697 (4)


Text

February 13, 2002 Mr. Stephen A. Byrne Senior Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88 Jenkinsville, South Carolina 29065

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO. 1 - CORRECTION TO AMENDMENT RE: DECREASE OF HOT CHANNEL FACTOR EXCLUSION ZONE AT TOP AND BOTTOM OF CORE (TAC NO. MB2052)

Dear Mr. Byrne:

On January 24, 2002, the Nuclear Regulatory Commission issued Amendment No. 153 to Facility Operating License No. NPF-12 for the Virgil C. Summer Nuclear Station, Unit No. 1.

The amendment was issued in response to your application dated May 24, 2001.

This amendment revised Technical Specifications (TS) Sections 4.2.2.2.e and g, and 4.2.2.4.e and g to adopt a modified methodology that relocates the heat flux hot channel factor, FQ(z),

penalty for increasing FQ(z) versus burnup to a table in the Core Operating Limits Report. The amendment also increased the surveillance region of FQ(z) to be consistent with the current core design and to provide assurance that the peak FQ(z) is monitored and evaluated near the end of core life.

By letter dated September 20, 2001, you requested 90 days for implementation of this amendment. However, the NRC staff inadvertently issued the amendment with the implementation requirement within 30 days. We are enclosing the corrected page with the correct implementation date. We are sorry for any inconvenience this may have caused.

Sincerely,

/RA/

Gordon E. Edison, Sr. Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-395

Enclosure:

Corrected Page 2 of License Amendment No. 153 cc w/encl: See next page

Mr. Stephen A. Byrne February 13, 2002 Senior Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88 Jenkinsville, South Carolina 29065

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO. 1 - CORRECTION TO AMENDMENT RE: DECREASE OF HOT CHANNEL FACTOR EXCLUSION ZONE AT TOP AND BOTTOM OF CORE (TAC NO. MB2052)

Dear Mr. Byrne:

On January 24, 2002, the Nuclear Regulatory Commission issued Amendment No. 153 to Facility Operating License No. NPF-12 for the Virgil C. Summer Nuclear Station, Unit No. 1.

The amendment was issued in response to your application dated May 24, 2001.

This amendment revised Technical Specifications (TS) Sections 4.2.2.2.e and g, and 4.2.2.4.e and g to adopt a modified methodology that relocates the heat flux hot channel factor, FQ(z),

penalty for increasing FQ(z) versus burnup to a table in the Core Operating Limits Report. The amendment also increased the surveillance region of FQ(z) to be consistent with the current core design and to provide assurance that the peak FQ(z) is monitored and evaluated near the end of core life.

By letter dated September 20, 2001, you requested 90 days for implementation of this amendment. However, the NRC staff inadvertently issued the amendment with the implementation requirement within 30 days. We are enclosing the corrected page with the correct implementation date. We are sorry for any inconvenience this may have caused.

Sincerely,

/RA/

Gordon E. Edison, Sr. Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-395

Enclosure:

Corrected Page 2 of License Amendment No. 153 cc w/encl: See next page DISTRIBUTION PUBLIC RLaufer (hard copy) RidsAcrsAcnwMailCenter PDII-1 Rdg EDunnington (hard copy) GHill (2) RidsRgn2MailCenter RidsNrrDlpmLpdii RidsOgcRp WBeckner FILENAME - G:\PDII-1\SUMMER\MB2052-AMD.WPD Accession Number: ML020450697 OFFICE PM:PDII/S1 LA:PDII/S2 SC(A):PDII/S1 NAME GEdison EDunnington RLaufer DATE 2/11/02 2/7/02 2/11/02 COPY Yes/No Yes/No Yes/No OFFICIAL RECORD COPY

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 153, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. South Carolina Electric &

Gas Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3. This amendment is effective as of its date of issuance and shall be implemented within 90 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Richard J. Laufer, Acting Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: January 24, 2002 Revised by correction letter dated February 13, 2002

Mr. Stephen A. Byrne VIRGIL C. SUMMER NUCLEAR STATION South Carolina Electric & Gas Company cc:

Mr. R. J. White Ms. Kathryn M. Sutton, Esquire Nuclear Coordinator Winston & Strawn Law Firm S.C. Public Service Authority 1400 L Street, NW c/o Virgil C. Summer Nuclear Station Washington, DC 20005-3502 Post Office Box 88, Mail Code 802 Jenkinsville, South Carolina 29065 Resident Inspector/Summer NPS c/o U.S. Nuclear Regulatory Commission 576 Stairway Road Jenkinsville, South Carolina 29065 Chairman, Fairfield County Council Drawer 60 Winnsboro, South Carolina 29180 Mr. Henry Porter, Assistant Director Division of Waste Management Bureau of Land & Waste Management Department of Health & Environmental Control 2600 Bull Street Columbia, South Carolina 29201 Mr. Gregory H. Halnon, General Manager Nuclear Plant Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station, Mail Code 303 Post Office Box 88 Jenkinsville, South Carolina 29065 Mr. Melvin N. Browne, Manager Nuclear Licensing & Operating Experience South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station, Mail Code 830 Post Office Box 88 Jenkinsville, South Carolina 29065