ML020450442
| ML020450442 | |
| Person / Time | |
|---|---|
| Site: | Salem (DPR-070) |
| Issue date: | 01/15/2002 |
| From: | Garchow D Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LRN-02-0020 | |
| Download: ML020450442 (4) | |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 JAN 1 5 2002 LRN-02-0020 0 PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 1 DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 1 Technical Specifications, the operating statistics for December 2001 are being forwarded.
- Operations RAR Attachments C Distribution C)v.
>Y 95-2168 REV. 7/99
INDEX NUMBER SECTION OF PAGES Operating Data Report...............................................................................
1 Monthly Operating Summary......................................................................
1
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-272 Salem 1 01/11/02 F. Todd (856) 339-1316 Reporting Period December 2001 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1130 1096 Month 1744 7219 134228 744 7116 129695 0
0 0
839075 7709423 131283398 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)
(1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F -Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-272 Salem 1 01/11/02 R. Ritzman (856) 339-1445 Summary Of Monthly Operating Experience
- Salem 1 began the month at 100% power and operated the entire month without any significant power reductions.
At the end of the month, Salem 1 completed 76 days of consecutive on-line operation.