Perry Nuclear Power Plant 10 Center Road FPO. Box 97 FistEnergy NuclearOperngCompny Perry, Ohio 44081 January 10, 2002 PY-CEIINRR-2606L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the December 2001 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Gregory A. Dunn Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
OPERATING DATA REPORT UNIT:
Perry DATE:
01/08/02 Docket: 50-440 Unit Name:
Perry Nuclear Power Plant Reporting Period: December 2001 Utility
Contact:
T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Net MWe):
1266*
1241 **
Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)
This Month 691.2 627.0 0.0 712.665.0 Yr-to-Date 6,976.6 6,710.8 0.0 7 77*
44F/ 0 Cumulative 96,585.2 94,073.0 0.0 1O (AOO3( 4020
- The New Design Electrical Rating is based on the 105% uprate which was completed April of 2001.
- The new MDC was effective April 1, 2001.
Page 1
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
7.
- 8.
- 9.
- 10.
11.
77945
.06600...
4020
4 UNIT SHUTDOWNS REPORT MONTH - DECEMBER 2001 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 01/08/02 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1
Hours 2
3 01-8 12/15/01 F
109.8 A
3 The plant incurred an unplanned automatic scram due to a feedwater control card problem
SUMMARY
- The Perry plant began the month on line. There was an unplanned automatic scram on 12/15/01. The plant was back on-line on 12/20/01 at 1116. On 12/26 the turbine was manually taken off-line to seat the telescopic generator disconnect switch. The turbine was back on-line the same day and remained on-line through the month.
- 1. TYPE:
F: Forced S: Scheduled
- 2.
REASON:
A - Equipment Failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &
License Examination F - Administrative G - Operational Error (explain)
H - Other (explain)
- 3. METHOD:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2