ML020450428

From kanterella
Jump to navigation Jump to search
December 2001 Monthly Operating Report for Perry Nuclear Power Plant
ML020450428
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 01/10/2002
From: Dunn G
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML020450428 (3)


Text

Perry Nuclear Power Plant 10 Center Road FPO. Box 97 FistEnergy NuclearOperngCompny Perry, Ohio 44081 January 10, 2002 PY-CEIINRR-2606L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the December 2001 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Gregory A. Dunn Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector

OPERATING DATA REPORT UNIT:

Perry DATE:

01/08/02 Docket: 50-440 Unit Name:

Perry Nuclear Power Plant Reporting Period: December 2001 Utility

Contact:

T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

1266*

1241 **

Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)

This Month 691.2 627.0 0.0 712.665.0 Yr-to-Date 6,976.6 6,710.8 0.0 7 77*

44F/ 0 Cumulative 96,585.2 94,073.0 0.0 1O (AOO3( 4020

  • The New Design Electrical Rating is based on the 105% uprate which was completed April of 2001.
    • The new MDC was effective April 1, 2001.

Page 1

1.
2.
3.
4.
5.
6.

7.

8.
9.
10.

11.

77945

.06600...

4020

4 UNIT SHUTDOWNS REPORT MONTH - DECEMBER 2001 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 01/08/02 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1

Hours 2

3 01-8 12/15/01 F

109.8 A

3 The plant incurred an unplanned automatic scram due to a feedwater control card problem

SUMMARY

The Perry plant began the month on line. There was an unplanned automatic scram on 12/15/01. The plant was back on-line on 12/20/01 at 1116. On 12/26 the turbine was manually taken off-line to seat the telescopic generator disconnect switch. The turbine was back on-line the same day and remained on-line through the month.
1. TYPE:

F: Forced S: Scheduled

2.

REASON:

A - Equipment Failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

License Examination F - Administrative G - Operational Error (explain)

H - Other (explain)

3. METHOD:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2