ML020450281

From kanterella
Jump to navigation Jump to search
December 2001 Monthly Operating Report for South Texas Project Units 1 and 2
ML020450281
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/15/2002
From: Mallen F
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-02001239, ST131390945
Download: ML020450281 (14)


Text

Nuclear Operating Company mw N ww==

South Texus Proc&t Nuclear Operatin Company PO Box 289 Wad5Horth. Teras 77483 January 15, 2002 NOC-AE-02001239 File No. G02 STI31390945 10CFR50.71 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for December, 2001 Pursuant to 10CFR50.71 (a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for December 2001.

If you should have any questions on this matter, please contact R. L. Hill at (361) 972-7667.

Sincerely, F. H. Mallen Manager, Planning & Controls Attachments: 1) STPEGS Unit 1 Monthly Operating Report - December 2001

2) STPEGS Unit 2 Monthly Operating Report - December 2001

NOC-AE- 02001239 File No.: G02 STI No.:31390945 Page 2 cc:

Ellis W. Merschoff Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mohan C. Thadani U. S. Nuclear Regulatory Commission Project Manager, 1 White Flint North 11555 Rockville Place Rockville, MD 20852-2738 Mail Stop: O-7D1 Cornelius F. O'Keefe U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code MN1 16 Wadsworth, TX 77483 A. H. Gutterman, Esquire Morgan, Lewis & Bockius 1800 M. Street, N.W.

Washington, DC 20036-5869 M. T. Hardt/W. C. Gunst City Public Service P. 0. Box 1771 San Antonio, TX 78296 A. Ramirez/C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 Jon C. Wood Matthews & Branscomb 112 East Pecan, Suite 1100 San Antonio, Texas 78205-3692 Institute of Nuclear Power Operations - Records Center 700 Galleria Parkway Atlanta, GA 30339-5957 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 R. L. Balcom/D. G. Tees Reliant Energy, Inc.

P. 0. Box 1700 Houston, TX 77251 C. A. Johnson/A. C. Bakken, fII AEP - Central Power and Light Company P. 0. Box 289, Mail Code: N5022 Wadsworth, TX 77483 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT DECEMBER 2001 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 Approved By:E.D.

0D /C c"

E.D. 110IN Date

MONTHLY

SUMMARY

South Texas Project Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKET NO.

50-498 UNIT 1

DATE Jan. 7, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1.

REPORTING PERIOD: 12/1/01-12/31/01 GROSS HOURS IN REPORTING PERIOD: 744

2.

CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None

4.

REASONS FOR RESTRICTION (IF ANY): N/A

5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.

19.

THIS MONTH YR TO DATE CUMULATIVE NUMBER OF HOURS REACTOR CRITICAL 744.0 8,270.4 89949.9 REACTOR RESERVE SHUTDOWN HOURS 0

0 0

HOURS GENERATOR ON LINE 744.0 8,240.5 88,319.8 UNIT RESERVE SHUTDOWN HOURS 0

0 0

GROSS THERMAL ENERGY GENERATED (MWH) 2,839,848 31,243,275 329,298,340 NET ELECTRICAL ENERGY GENERATED (MWH) 944,919 10,338,156 107,348,114 REACTOR SERVICE FACTOR (%)

100.0 94.4 76.8 REACTOR AVAILABILITY FACTOR (%)

100.0 94.4 76.8 UNIT SERVICE FACTOR (%)

100.0 94.1 75.5 UNIT AVAILABILITY FACTOR (%)

100.0 94.1 75.5 UNIT CAPACITY FACTOR - Using MDC (%)

101.6 94.4 73.3 UNIT CAPACITY FACTOR - Using DER (%)

101.6 94.4 73.3 UNIT FORCED OUTAGE RATE (%)

0.0 0.0 14.3 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-498 UNIT 1

DATE Jan. 7, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH DECEMBER DAY DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 2

3 4

5 1275 1274 1272 1266 1265 1265 1268 1276 1274 1270 1266 1275 1276 1271 1269 1261 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL (MWe-Net) 1269 1265 1268 1263 1268 1271 1269 1267 1275 1277 1272 1271 1271 1274 1272

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-498 UNIT I

DATE Jan. 7, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH DECEMBER 1

F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4

IEEE 805-1983 5

IEEE 803-1983 1

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)

Shutting Event Code Code Down Report #

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT DECEMBER 2001 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 Approved By:

C

'//S E.D. HAPIN Date

MONTHLY

SUMMARY

South Texas Project Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKETNO.

50-499 UNIT 2

DATE Jan. 7, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1.

REPORTING PERIOD: 12/1/01-12/31/01 GROSS HOURS IN REPORTING PERIOD: 744

2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None

4.

REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE NUMBER OF HOURS REACTOR CRITICAL 744.0 7,880.7 87,814.0 REACTOR RESERVE SHUTDOWN HOURS 0

0 0

HOURS GENERATOR ON LINE 744.0 7,754.0 85,627.7 UNIT RESERVE SHUTDOWN HOURS 0

0 0

GROSS THERMAL ENERGY GENERATED (MWH) 2,839,482 29,039,003 319,160,531 NET ELECTRICAL ENERGY GENERATED (MWH) 934,995 9,537,557 103,958,121 REACTOR SERVICE FACTOR (%)

100.0 90.0 79.9 REACTOR AVAILABILITY FACTOR (%)

100.0 90.0 79.9 UNIT SERVICE FACTOR (%)

100.0 88.5 77.9 UNIT AVAILABILITY FACTOR (%)

100.0 88.5 77.9 UNIT CAPACITY FACTOR - Using MDC (%)

100.5 87.1 75.6 UNIT CAPACITY FACTOR - Using DER (%)

100.5 87.1 75.6 UNIT FORCED OUTAGE RATE (%)

0.0 4.2 13.9 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.

19.

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO.

50-499 UNIT 2

DATE Jan. 7, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH DECEMBER AVERAGE DAILY POWER LEVEL (MWe-Net) 1258 1251 1254 1257 1258 1257 1263 1259 1258 1251 1242 1247 1254 1254 1254 1260 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1260 1262 1258 1261 1258 1256 1256 1260 1260 1258 1259 1260 1260 1257 1258 DAY 15 16

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-499 UNIT 2

DATE Jan. 7, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH DECEMBER 1

F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1 -Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4

IEEE 805-1983 5

IEEE 803-1983 1

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)

Shutting Event Code Code Down Report #

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.