Exelon.
Exelon Generation www.exeloncorp.com Nuclear Quad Cities Generating Station 22710 206th Avenue North Cordova, I L 61242-9740 Tel 309-654-2241 January 15, 2002 SVP-02-003 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265
Subject:
Monthly Operating Report In accordance with Generic Letter 97-02 and Technical Specification 5.6.4, "Monthly Operating Reports," we are submitting the Monthly Operating Report for Quad Cities Nuclear Power Station, Units 1 and 2. This report covers the period of December 1, 2001 to December 31, 2001.
Should you have any questions concerning this letter, please contact Mr. W. J. Beck at (309) 227-2800.
Respectfully, Tot y. Tulon Site Vice President Quad Cities Nuclear Power Station Attachment cc:
Regional Administrator - NRC Region III NRC Senior Resident Inspector - Quad Cities Nuclear Power Station X
ATTACHMENT QUAD CITIES NUCLEAR POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT EXELON NUCLEAR AND MIDAMERICAN ENERGY COMPANY FACILITY OPERATING LICENSE NOS. DPR-29 AND DPR-30 NRC DOCKET NOS. 50-254 AND 50-265
TABLE OF CONTENTS I.
Introduction II.
Summary of Operating Experience A.
Unit One B.
Unit Two Ill.
Operating Data Statistics A.
Operating Data Report for December - Quad Cities Unit One B.
Operating Data Report for December - Quad Cities Unit Two IV.
Unit Shutdowns A.
Unit One Shutdowns B.
Unit Two Shutdowns V.
Amendments to Facility License or Technical Specifications VI.
Unique Reporting Requirements A.
Main Steam Relief Valve Operations
I. INTRODUCTION Quad Cities Nuclear Power Station is composed of two Boiling Water Reactors and Steam Turbine/Generators, each with a Maximum Dependable Capacity of 769 MWe Net, located in Cordova, Illinois. The Station is jointly owned by Exelon Nuclear and MidAmerican Energy Company. The Nuclear Steam Supply Systems are General Electric Company Boiling Water Reactors. The Architect/ Engineer was Sargent & Lundy, Incorporated, and the primary construction contractor was United Engineers & Constructors. The Mississippi River is the condenser cooling water source. The plant is subject to license numbers DPR-29 and DPR-30, issued October 1, 1971, and March 21, 1972, respectively; pursuant to Docket Numbers 50-254 and 50-265. The date of initial Reactor criticalities for Units One and Two, respectively were October 18, 1971, and April 26, 1972. Commercial generation of power began on February 18, 1973 for Unit One and March 10, 1973 for Unit Two.
This report was compiled by Ron Baumer and Debbie Cline, telephone numbers 309-227-2811 and 2801, respectively.
I1.
SUMMARY
OF OPERATING EXPERIENCE A.
Unit One Unit One operated the month of December at full power with the exception of a planned load drop to approximately 220 MWe to identify a condenser tube leak. On December 20 and 22, 2001, Unit One had unplanned load drops to support the identification of a fuel leak. Unit One returned to full power on December 25, 2001, and operated at full power for the rest of the month.
B.
Unit Two Unit Two operated the month of December at full power with the exception of a load drop for scram timing, rod shuffle and periodic turbine generator testing. On December 14, 2001, the unit had a load drop to replace the house power supply. On December 18 and 24, 2001, the unit had load drops due to TCV oscillations. The unit operated the rest of the month at full power.
Ill. OPERATING DATA STATISTICS A. Unit One Operating Data Report for December 2001 DOCKET NO.: 50-254 DATE:
COMPLETED BY:
TELEPHONE:
January 15, 2002 Ron Baumer (309) 227-2811 OPERATING STATUS 0000 120101
- 1. REPORTING PERIOD: 2400 123101 GROSS HOURS IN REPORTING PERIOD: 744
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2511 MAX. DEPEND. CAPACITY:
769 DESIGN ELECTRICAL RATING (MWe-NET):
789 Quad Cities Unit One Operating Statistics for December 2001 UNIT ONE THIS MONTH YTD CUMULATIVE
- 3.
NUMBER OF HOURS THE REACTOR WAS'CRITICAL 744.00 8703.30 202032.80
- 4.
REACTOR RESERVE SHUTDOWN HOURS 0.00 56.70 3478.60
- 5.
HOURS GENERATOR ON-LINE 744.00 8691.00 196738.60
- 6.
UNIT RESERVE SHUTDOWN HOURS 0.00 69.00 978.20
- 7.
GROSS THERMAL ENERGY GENERATED (MWH) 1777868.88 21629062.56 437851681.08
- 8.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 577949.00 7023954.00 141689525.00
- 9.
NET ELECTRICAL ENERGY GENERATED (MWH) 552353.00 6710873.00 128514389.00
- 10.
REACTOR SERVICE FACTOR 100.00 99.35 77.54
- 11.
REACTOR AVAILABILITY FACTOR 100.00 99.35 78.88
- 12.
UNIT SERVICE FACTOR 100.00 99.21 75.51
- 13.
UNIT AVAILABILITY FACTOR 100.00 99.21 75.89
- 14.
UNIT CAPACITY FACTOR (Using MDC) 96.54 99.62 64.14
- 15.
UNIT CAPACITY FACTOR (Using Design MWe) 94.10 97.10 62.52
III. OPERATING DATA STATISTICS B. Unit Two Operating Data Report for December 2001 DOCKET NO. :50-265 DATE:
January 15, 2002 COMPLETED BY:
Ron Baumer TELEPHONE:
(309) 227-2811 OPERATING STATUS
- 1.
2.
0000 120101 REPORTING PERIOD: 2400 123101 GROSS HOURS IN REPORTING PERIOD: 744 CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2511 MAX. DEPEND. CAPACITY: 769 DESIGN ELECTRICAL RATING (MWe-NET): 789 Quad Cities Unit Two Operating Statistics for December 2001 UNIT TWO THIS MONTH YTD CUMULATIVE
- 3.
NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.00 8105.70 195911.80
- 4.
REACTOR RESERVE SHUTDOWN HOURS 0.00 654.30 3640.10
- 5.
HOURS GENERATOR ON-LINE 744.00 8058.00 189819.15
- 6.
UNIT RESERVE SHUTDOWN HOURS 0.00 702.00 1404.90
- 7.
GROSS THERMAL ENERGY GENERATED (MWH) 1860579.84 20102100.24 422093917.50
- 8.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 607950.00 6527815.00 135615931.00
- 9.
NET ELECTRICAL ENERGY GENERATED (MWH) 585715.00 6273819.00 128858170.00
- 10.
REACTOR SERVICE FACTOR 100.00 92.67 77.52
- 11.
REACTOR AVAILABILITY FACTOR 100.00 92.67 78.97
- 12.
UNIT SERVICE FACTOR 100.00 92.15 75.64
- 13.
UNIT AVAILABILITY FACTOR 100.00 92.15 76.20
- 14.
UNIT CAPACITY FACTOR (Using MDC) 102.37 93.30 66.77
- 15.
UNIT CAPACITY FACTOR (Using Design MWe) 99.78 90.93 65.08
IV. UNIT SHUTDOWNS A. Unit One Shutdowns for December 2001 DOCKET NO.:
DATE:
COMPLETED BY:
TELEPHONE:
50-254 January 15, 2002 Ron Baumer (309) 227-2811 No.
DATE TYPE DURATION REASON METHOD CORRECTIVE F OR S (HOURS)
OF ACTIONSICOMMENTS SHUTTING DOWN REACTOR None for the month of December Legend:
(1) Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
IV. UNIT SHUTDOWNS B. Unit Two Shutdowns for December 2001 DOCKET NO.:
DATE:
COMPLETED BY:
TELEPHONE:
50-265 January 15, 2002 Ron Baumer (309) 227-2811 Legend:
(1) Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
No.
DATE TYPE DURATION REASON METHOD CORRECTIVE F OR S (HOURS)
OF ACTIONS/COMMENTS SHUTTING DOWN REACTOR None for the month of December
V. AMENDMENTS TO FACILITY LICENSE OR TECHNICAL SPECIFICATIONS The Station received the following Technical Specification changes in December:
(1) Reactor Low Level Setpoint Change (2) Transition for GE-14 Fuel (3) Extended Power Uprate
VI. UNIQUE REPORTING REQUIREMENTS There were no relief valve actuations for the month of December.