PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 JAN 1 5 2002 LRN-02-0021 o PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 2 Technical Specifications, the operating statistics for December 2001 are being forwarded.
Sin erely, Garch I/rPresi nt - Operations RAR Attachments C Distribution 95-2168 REV. 7/99
INDEX NUMBER SECTION OF PAGES Operating Data Report...............................................................................
1 Monthly Operating Summary......................................................................
1
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-311 Salem 2 01/11/02 F. Todd (856) 339-1316 Reporting Period December 2001 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1131 1092 Month Year-to-date Cumulative 720 8736 112713 720 8736 109338 0
0 0
809794 9517603 110821541 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 1 12/31/01 F
24 A
3 2PS3 Failed Open (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.: 50-311 UNIT: Salem 2 DATE: 01/11/02 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience
- Salem 2 entered the month at approximately 100% power.
On December 31, a pressurizer spray valve failed open, causing an automatic reactor trip and a Safety Injection.
- At the time of the trip, Salem 2 had completed 410 days of continuous on-line operation.